Causality Analysis of Construction Delays and Value Engineering Protocols in Marine Projects
The central argument of this study is that if delay causation themes are known, but they are not analyzed by project peculiarities, research outcomes are not likely to deliver clear impact. Thus, this study aims to examine delay causations and how they apply to marine projects, and whether they can...
| Main Author: | Karami, Hamidreza |
|---|---|
| Format: | Thesis |
| Published: |
Curtin University
2021
|
| Online Access: | http://hdl.handle.net/20.500.11937/84946 |
Similar Items
Delay causations in marine infrastructures, a review
by: Karami, H., et al.
Published: (2018)
by: Karami, H., et al.
Published: (2018)
Delay-based Reliability Analysis on Construction Projects
by: Sorooshian, Shahryar
Published: (2014)
by: Sorooshian, Shahryar
Published: (2014)
The analysis of factors contributed to delay and method to analyze the delay in construction project
by: Mohammad Solhi, Mohammed
Published: (2010)
by: Mohammad Solhi, Mohammed
Published: (2010)
Causal ascription of rework in building and civil engineering projects
by: Ekambaram, P., et al.
Published: (2014)
by: Ekambaram, P., et al.
Published: (2014)
Prelimary studies of delays in construction projects
by: Tan, Chin Keng, et al.
Published: (2020)
by: Tan, Chin Keng, et al.
Published: (2020)
The causes of delay in construction project in Kuantan
by: Nur Azuwa, Ghazali
Published: (2017)
by: Nur Azuwa, Ghazali
Published: (2017)
Causes and effects of delay in the construction project
by: Nurshapika Adila, Adnan
Published: (2018)
by: Nurshapika Adila, Adnan
Published: (2018)
Factors Influencing Delay in Construction/Civil Engineering Projects in the Persian Gulf Countries
by: Alavi Toussi, Maryam, et al.
Published: (2012)
by: Alavi Toussi, Maryam, et al.
Published: (2012)
The causes and effect of delay in construction industry project
by: Intan Diana, Musa
Published: (2012)
by: Intan Diana, Musa
Published: (2012)
Factors that contribute to delay in construction project in Johor
by: Mimi Ereena, Solahudin Alayubi
Published: (2019)
by: Mimi Ereena, Solahudin Alayubi
Published: (2019)
The effects of non-excusable delay in construction project
by: Nor Shahira, Shaari
Published: (2014)
by: Nor Shahira, Shaari
Published: (2014)
A review of causes of delay in construction projects
by: Al-Mohammad, Mohammad, et al.
Published: (2018)
by: Al-Mohammad, Mohammad, et al.
Published: (2018)
Project Performance And Delays In Sudan
Construction Industry
by: Elhassan, Salma Abdalrahman Mohamed
Published: (2009)
by: Elhassan, Salma Abdalrahman Mohamed
Published: (2009)
Dispute resolution in relation to delay of construction project
by: Soon, Tan Kian
Published: (2010)
by: Soon, Tan Kian
Published: (2010)
Causes of delays in the construction phase of Chinese building projects
by: Wang, T., et al.
Published: (2018)
by: Wang, T., et al.
Published: (2018)
The causes and effect of delay to handover the project in construction industry
by: Nur Fatihah, Zakeri
Published: (2015)
by: Nur Fatihah, Zakeri
Published: (2015)
An Environmental Impact Framework for Evaluating Construction Projects Delays
by: Ansah, Richard Hannis, et al.
Published: (2016)
by: Ansah, Richard Hannis, et al.
Published: (2016)
Underlying causes of construction project delay: A review
by: Romzi, N. A., et al.
Published: (2022)
by: Romzi, N. A., et al.
Published: (2022)
Mitigation of delay in industrial construction projects;
case of Iran
by: Ebrahimzadeh Sepasgozar, Samad Mohammad
Published: (2008)
by: Ebrahimzadeh Sepasgozar, Samad Mohammad
Published: (2008)
A study of project delay in Sudan construction industry
by: Mohamed, Mohamed Babikir Ibrahiem
Published: (2015)
by: Mohamed, Mohamed Babikir Ibrahiem
Published: (2015)
Decision-making model for selecting the optimum method of delay analysis in construction projects
by: Perera, N., et al.
Published: (2016)
by: Perera, N., et al.
Published: (2016)
The feasible use of the uk delay and disruption protocol in Malaysian construction industry
by: Tan, Chuan Kee
Published: (2012)
by: Tan, Chuan Kee
Published: (2012)
Causal Modelling of Construction Disputes
by: Love, Peter, et al.
Published: (2008)
by: Love, Peter, et al.
Published: (2008)
Critical Factors and Mitigating Measures of Construction Delays of Pakistani Building Construction Projects
by: Irfanullah, Irfanullah, et al.
Published: (2023)
by: Irfanullah, Irfanullah, et al.
Published: (2023)
Evaluation of factors influencing delay in construction/civil engineering
by: Alavi Toussi, Maryam
Published: (2015)
by: Alavi Toussi, Maryam
Published: (2015)
Causal Discovery and Inference of Project Disputes
by: Love, Peter, et al.
Published: (2011)
by: Love, Peter, et al.
Published: (2011)
Mitigating Delay Impacts in Construction Projects: An Evaluation of Causes and Strategies
by: Ijaz, Ahmad, et al.
Published: (2024)
by: Ijaz, Ahmad, et al.
Published: (2024)
A study on the factor effecting project delay in the housing construction
by: Fatin Fazlinda, Hamzah
Published: (2016)
by: Fatin Fazlinda, Hamzah
Published: (2016)
Advancing Towards Delay-Free Construction Project: A
Review
by: Ansah, Richard Hannis, et al.
Published: (2016)
by: Ansah, Richard Hannis, et al.
Published: (2016)
A study of delay sources of construction project in Kuantan area
by: Tan, Kean Wei
Published: (2015)
by: Tan, Kean Wei
Published: (2015)
Impact of the cost overrun factors on the project delays in construction industry
by: Noor Elinah, Sailin
Published: (2018)
by: Noor Elinah, Sailin
Published: (2018)
Study on causes of delay for government construction project in Kuching, Sarawak
by: Nurul Asyilah, Romzi
Published: (2017)
by: Nurul Asyilah, Romzi
Published: (2017)
Adoption of lean tools to control delays in Malaysian construction projects
by: Ansha, Richard Hannis
Published: (2016)
by: Ansha, Richard Hannis
Published: (2016)
The significant factors causing delay of building construction projects in Malaysia.
by: Alaghbari, Wa'el, et al.
Published: (2007)
by: Alaghbari, Wa'el, et al.
Published: (2007)
The Use of Analytic Hierarchy Process (AHP) in the Analysis of Delay Claims in Construction Projects in the UAE
by: Perera, N., et al.
Published: (2010)
by: Perera, N., et al.
Published: (2010)
The factors and effect of delay in government construction project (case study in Kuantan)
by: Mohd Rosazuwad, Mohamad@Muda
Published: (2010)
by: Mohd Rosazuwad, Mohamad@Muda
Published: (2010)
A study to identify the factor that causes project delay in construction at Terengganu
by: Nurul Syakirah, Mohd Ali
Published: (2016)
by: Nurul Syakirah, Mohd Ali
Published: (2016)
Studying the Reasons for Delay and Cost Overrun in Construction
Projects: The Case of Iran
by: Samarghandi, Hamed, et al.
Published: (2016)
by: Samarghandi, Hamed, et al.
Published: (2016)
A theoretical framework on factors causing delay of construction industries projects
by: Ahmed Al-Fadhali, Najib Mohammed, et al.
Published: (2017)
by: Ahmed Al-Fadhali, Najib Mohammed, et al.
Published: (2017)
Measures for mitigating the delay in high-rise building construction projects in Dubai
by: Bhatti, Imtiaz Ali
Published: (2019)
by: Bhatti, Imtiaz Ali
Published: (2019)
Similar Items
-
Delay causations in marine infrastructures, a review
by: Karami, H., et al.
Published: (2018) -
Delay-based Reliability Analysis on Construction Projects
by: Sorooshian, Shahryar
Published: (2014) -
The analysis of factors contributed to delay and method to analyze the delay in construction project
by: Mohammad Solhi, Mohammed
Published: (2010) -
Causal ascription of rework in building and civil engineering projects
by: Ekambaram, P., et al.
Published: (2014) -
Prelimary studies of delays in construction projects
by: Tan, Chin Keng, et al.
Published: (2020)