Patel, M., Liew, M., Mustaffa, Z., Yee, N., & Whyte, A. (2020). Development of downtime cost calculator for offloading operations influenced by parametric rolling. MDPI.
Chicago Style (17th ed.) CitationPatel, M.S, M.S Liew, Z. Mustaffa, N.C Yee, and Andrew Whyte. Development of Downtime Cost Calculator for Offloading Operations Influenced by Parametric Rolling. MDPI, 2020.
MLA (9th ed.) CitationPatel, M.S, et al. Development of Downtime Cost Calculator for Offloading Operations Influenced by Parametric Rolling. MDPI, 2020.
Warning: These citations may not always be 100% accurate.