A Hybrid OSM–BIM Framework for Construction Management System

In this study, an in-depth evaluation was conducted to determine the influences of interactions between off-site manufacturing (OSM) and building information modelling (BIM) on overall project performance. Structural equation modelling method was adopted to examine the complex relationships among re...

Full description

Bibliographic Details
Main Author: Ghasemi Poor Sabet, Pejman
Format: Thesis
Published: Curtin University 2020
Online Access:http://hdl.handle.net/20.500.11937/81706
_version_ 1848764404768702464
author Ghasemi Poor Sabet, Pejman
author_facet Ghasemi Poor Sabet, Pejman
author_sort Ghasemi Poor Sabet, Pejman
building Curtin Institutional Repository
collection Online Access
description In this study, an in-depth evaluation was conducted to determine the influences of interactions between off-site manufacturing (OSM) and building information modelling (BIM) on overall project performance. Structural equation modelling method was adopted to examine the complex relationships among research variables based on survey data. The results showed that a systematic adoption of the interactions as a mediator between OSM and BIM, significantly enhanced the overall project performance as measured by key productivity indicators.
first_indexed 2025-11-14T11:18:49Z
format Thesis
id curtin-20.500.11937-81706
institution Curtin University Malaysia
institution_category Local University
last_indexed 2025-11-14T11:18:49Z
publishDate 2020
publisher Curtin University
recordtype eprints
repository_type Digital Repository
spelling curtin-20.500.11937-817062020-11-13T03:45:11Z A Hybrid OSM–BIM Framework for Construction Management System Ghasemi Poor Sabet, Pejman In this study, an in-depth evaluation was conducted to determine the influences of interactions between off-site manufacturing (OSM) and building information modelling (BIM) on overall project performance. Structural equation modelling method was adopted to examine the complex relationships among research variables based on survey data. The results showed that a systematic adoption of the interactions as a mediator between OSM and BIM, significantly enhanced the overall project performance as measured by key productivity indicators. 2020 Thesis http://hdl.handle.net/20.500.11937/81706 Curtin University fulltext
spellingShingle Ghasemi Poor Sabet, Pejman
A Hybrid OSM–BIM Framework for Construction Management System
title A Hybrid OSM–BIM Framework for Construction Management System
title_full A Hybrid OSM–BIM Framework for Construction Management System
title_fullStr A Hybrid OSM–BIM Framework for Construction Management System
title_full_unstemmed A Hybrid OSM–BIM Framework for Construction Management System
title_short A Hybrid OSM–BIM Framework for Construction Management System
title_sort hybrid osm–bim framework for construction management system
url http://hdl.handle.net/20.500.11937/81706