A Hybrid OSM–BIM Framework for Construction Management System
In this study, an in-depth evaluation was conducted to determine the influences of interactions between off-site manufacturing (OSM) and building information modelling (BIM) on overall project performance. Structural equation modelling method was adopted to examine the complex relationships among re...
| Main Author: | |
|---|---|
| Format: | Thesis |
| Published: |
Curtin University
2020
|
| Online Access: | http://hdl.handle.net/20.500.11937/81706 |
| _version_ | 1848764404768702464 |
|---|---|
| author | Ghasemi Poor Sabet, Pejman |
| author_facet | Ghasemi Poor Sabet, Pejman |
| author_sort | Ghasemi Poor Sabet, Pejman |
| building | Curtin Institutional Repository |
| collection | Online Access |
| description | In this study, an in-depth evaluation was conducted to determine the influences of interactions between off-site manufacturing (OSM) and building information modelling (BIM) on overall project performance. Structural equation modelling method was adopted to examine the complex relationships among research variables based on survey data. The results showed that a systematic adoption of the interactions as a mediator between OSM and BIM, significantly enhanced the overall project performance as measured by key productivity indicators. |
| first_indexed | 2025-11-14T11:18:49Z |
| format | Thesis |
| id | curtin-20.500.11937-81706 |
| institution | Curtin University Malaysia |
| institution_category | Local University |
| last_indexed | 2025-11-14T11:18:49Z |
| publishDate | 2020 |
| publisher | Curtin University |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | curtin-20.500.11937-817062020-11-13T03:45:11Z A Hybrid OSM–BIM Framework for Construction Management System Ghasemi Poor Sabet, Pejman In this study, an in-depth evaluation was conducted to determine the influences of interactions between off-site manufacturing (OSM) and building information modelling (BIM) on overall project performance. Structural equation modelling method was adopted to examine the complex relationships among research variables based on survey data. The results showed that a systematic adoption of the interactions as a mediator between OSM and BIM, significantly enhanced the overall project performance as measured by key productivity indicators. 2020 Thesis http://hdl.handle.net/20.500.11937/81706 Curtin University fulltext |
| spellingShingle | Ghasemi Poor Sabet, Pejman A Hybrid OSM–BIM Framework for Construction Management System |
| title | A Hybrid OSM–BIM Framework for Construction Management System |
| title_full | A Hybrid OSM–BIM Framework for Construction Management System |
| title_fullStr | A Hybrid OSM–BIM Framework for Construction Management System |
| title_full_unstemmed | A Hybrid OSM–BIM Framework for Construction Management System |
| title_short | A Hybrid OSM–BIM Framework for Construction Management System |
| title_sort | hybrid osm–bim framework for construction management system |
| url | http://hdl.handle.net/20.500.11937/81706 |