'Innovative Industrialised Buildings: Performance, Perceptions, and Barriers to Financing associated with Building Manufacturing'
Most buildings are still constructed one brick or timber at a time, over lengthy periods on-site, much like ancient civilisations. This paper poses the question of whether the manufacture of buildings using digital and production line techniques from advanced manufacture can transform building to...
| Main Authors: | Hargroves, Charlie, Newman, Peter, Green, Jemma |
|---|---|
| Format: | Conference Paper |
| Published: |
2016
|
| Online Access: | http://hdl.handle.net/20.500.11937/80463 |
Similar Items
Exploring Risks and Rewards Associated with High Performance Manufactured Buildings
by: Hargroves, Charlie, et al.
Published: (2017)
by: Hargroves, Charlie, et al.
Published: (2017)
Industrialised building systems.
by: Syed Junid, Syed Mansur
Published: (1986)
by: Syed Junid, Syed Mansur
Published: (1986)
Industrialised building systems
by: Trikha, D. N., et al.
Published: (2004)
by: Trikha, D. N., et al.
Published: (2004)
Barriers to implement the industrialised building system in Malaysia / Muhammad Hanif Hashim
by: Hashim, Muhammad Hanif
Published: (2015)
by: Hashim, Muhammad Hanif
Published: (2015)
The Acceptance of Industrialised Building Systems
by: Ng, Choon Eu
Published: (2014)
by: Ng, Choon Eu
Published: (2014)
Industrialised building system formation scheduling for public buildings
by: Tay, Allan Eng Mian
Published: (2006)
by: Tay, Allan Eng Mian
Published: (2006)
The Performance Nexus - A framework for improving energy efficiency in existing commercial buildings by considering a whole-of-building approach
by: Hargroves, Charlie, et al.
Published: (2012)
by: Hargroves, Charlie, et al.
Published: (2012)
Critical success factors and barriers for industrialised building system (IBS) adoption in construction project
by: Suhaida Noorein, Iskandar Mirza
Published: (2010)
by: Suhaida Noorein, Iskandar Mirza
Published: (2010)
Qualitative analysis on the barriers of industrialised building system (IBS) uptake in Malaysian construction projects
by: Nawi, M.N.M, et al.
Published: (2015)
by: Nawi, M.N.M, et al.
Published: (2015)
The essential characteristics of industrialised building system
by: Thanoon, Waleed Abdulmalik, et al.
Published: (2003)
by: Thanoon, Waleed Abdulmalik, et al.
Published: (2003)
Implementation strategy for industrialised building system
by: Lim, Pui Chung
Published: (2006)
by: Lim, Pui Chung
Published: (2006)
A Literature Review Of The Advantages And Barriers To The Implementation Of Industrialised Building System (IBS) In Construction Industry.
by: Abdul Rahman, Hamzah, et al.
Published: (2009)
by: Abdul Rahman, Hamzah, et al.
Published: (2009)
Construction quality of school buildings using the Industrialised Building System (IBS)
by: Ali, Maisarah, et al.
Published: (2012)
by: Ali, Maisarah, et al.
Published: (2012)
The implementation of industrialised building system in construction industry
by: Mohd Syazwan Nizam, Mohd Moni
Published: (2012)
by: Mohd Syazwan Nizam, Mohd Moni
Published: (2012)
The application of industrialised building system in residential project
by: Syazana, Abdul Aziz
Published: (2010)
by: Syazana, Abdul Aziz
Published: (2010)
Simulation of Industrialised Building System components production
by: Marsono, Abdul Kadir, et al.
Published: (2006)
by: Marsono, Abdul Kadir, et al.
Published: (2006)
Simulation of industrialised building system components production
by: Ng, Soon Ching
Published: (2006)
by: Ng, Soon Ching
Published: (2006)
The development of a simple multi-nodal tool to identify performance issues in existing commercial buildings
by: Hall, Samantha, et al.
Published: (2013)
by: Hall, Samantha, et al.
Published: (2013)
Disruptive innovation, stranded assets and forecasting: the rise and rise of renewable energy
by: Green, Jemma, et al.
Published: (2017)
by: Green, Jemma, et al.
Published: (2017)
Building Cost Comparison Between Conventional And Some Selected Industrialised Building Systems
by: Hj.Haron, Nuzul Azam
Published: (2002)
by: Hj.Haron, Nuzul Azam
Published: (2002)
Quality and satisfaction of house owners for industrialised building system and conventional building system
by: Mohammad, Hairuddin
Published: (2009)
by: Mohammad, Hairuddin
Published: (2009)
Relationship of economies of scale (EOS) factors for Malaysian Industrialised building system (IBS) precast manufacturer
by: Tajul Ariffin, Syazwana
Published: (2019)
by: Tajul Ariffin, Syazwana
Published: (2019)
The Impact of Industrialised Building System (IBS) On Local Labour
by: Lui, Jing Wen
Published: (2020)
by: Lui, Jing Wen
Published: (2020)
Adaptable effectiveness of industrialised building (IBS) in construction projects
by: Zulkarnain, Muhamad
Published: (2013)
by: Zulkarnain, Muhamad
Published: (2013)
A review on industrialised building system issues in Malaysia
by: Ayeop Abdul Khalil, Farah Deba, et al.
Published: (2015)
by: Ayeop Abdul Khalil, Farah Deba, et al.
Published: (2015)
Critical Success Factors Of Implementing Industrialised Building System
by: Lim, Shin Sheng
Published: (2021)
by: Lim, Shin Sheng
Published: (2021)
Issues and challenges in the implementation of Industrialised Building Systems in Malaysia
by: Abd. Rahman, Ahmad Baharuddin, et al.
Published: (2006)
by: Abd. Rahman, Ahmad Baharuddin, et al.
Published: (2006)
Simulation of industrialised building system formation for housing construction
by: Zainal Abidin@Md. Taib, Ahmad Razin
Published: (2007)
by: Zainal Abidin@Md. Taib, Ahmad Razin
Published: (2007)
Measurement of quality in building constructed using Industrialised Building System (IBS) and conventional method
by: Ali, Maisarah
Published: (2015)
by: Ali, Maisarah
Published: (2015)
Informing healthy building design with biophilic urbanism design principles: a review and synthesis of current knowledge and research
by: Reeve, Angela, et al.
Published: (2012)
by: Reeve, Angela, et al.
Published: (2012)
Associate problems in implementation of Industrialised Building System (IBS) in construction industry in Selangor / Izmaazura Ismail
by: Ismail, Izmaazura
Published: (2006)
by: Ismail, Izmaazura
Published: (2006)
Implementation of industrialised building system (BS) in Malaysia construction industry
by: Noorul Amimah, Ismail
Published: (2014)
by: Noorul Amimah, Ismail
Published: (2014)
Application of industrialised building system in school project in Malaysia: the challenge
by: Mohd. Aizad, Johari
Published: (2013)
by: Mohd. Aizad, Johari
Published: (2013)
Industrialised Building System (Ibs)
Scoring System - Case Study
by: Ibrahim, Siti RusāAdneen
Published: (2006)
by: Ibrahim, Siti RusāAdneen
Published: (2006)
Adoption Of Industrialised Building System (Ibs) In Building Projects Based On Disaster Risk Management Cycle
by: Pauzi, Nurshelawati Mohd
Published: (2022)
by: Pauzi, Nurshelawati Mohd
Published: (2022)
Building maintenance problems in industrialised building system and conventional constructed building in student accomodation in a Malaysian Public University
by: Hitam, Ahmad Hafizd
Published: (2015)
by: Hitam, Ahmad Hafizd
Published: (2015)
Innovation Barriers and Enablers that Affect Productivity
in Uganda Building Industry
by: Alinaitwe, Henry Mwanaki, et al.
Published: (2007)
by: Alinaitwe, Henry Mwanaki, et al.
Published: (2007)
The implementation of strategic partnering in industrialised building system / Faridah Muhamad Halil
by: Muhamad Halil, Faridah
Published: (2013)
by: Muhamad Halil, Faridah
Published: (2013)
The implementation of strategic partnering in industrialised building system / Faridah Muhamad Halil
by: Muhamad Halil, Faridah
Published: (2013)
by: Muhamad Halil, Faridah
Published: (2013)
Application of Constructability Concepts in the Industrialised Building System for the Malaysian Construction Industry
by: Jelodar, Mostafa Babaeian
Published: (2009)
by: Jelodar, Mostafa Babaeian
Published: (2009)
Similar Items
-
Exploring Risks and Rewards Associated with High Performance Manufactured Buildings
by: Hargroves, Charlie, et al.
Published: (2017) -
Industrialised building systems.
by: Syed Junid, Syed Mansur
Published: (1986) -
Industrialised building systems
by: Trikha, D. N., et al.
Published: (2004) -
Barriers to implement the industrialised building system in Malaysia / Muhammad Hanif Hashim
by: Hashim, Muhammad Hanif
Published: (2015) -
The Acceptance of Industrialised Building Systems
by: Ng, Choon Eu
Published: (2014)