Interactions between building information modelling and off-site manufacturing for productivity improvement
© 2019. Emerald Publishing Limited. Purpose: New methods have been introduced as revolutionary approaches in the construction industry, such as off-site manufacturing (OSM) and building information modelling (BIM). Although these approaches can provide many benefits, there are still barriers to...
| Main Authors: | , |
|---|---|
| Format: | Journal Article |
| Language: | English |
| Published: |
EMERALD GROUP PUBLISHING LTD
2019
|
| Subjects: | |
| Online Access: | http://purl.org/au-research/grants/arc/DP170104612 http://hdl.handle.net/20.500.11937/79281 |
| _version_ | 1848764031045730304 |
|---|---|
| author | Ghasemi Poor Sabet, Pejman Chong, Heap-Yih (John) |
| author_facet | Ghasemi Poor Sabet, Pejman Chong, Heap-Yih (John) |
| author_sort | Ghasemi Poor Sabet, Pejman |
| building | Curtin Institutional Repository |
| collection | Online Access |
| description | © 2019. Emerald Publishing Limited.
Purpose: New methods have been introduced as revolutionary approaches in the construction industry, such as off-site manufacturing (OSM) and building information modelling (BIM). Although these approaches can provide many benefits, there are still barriers to meeting the expectations of improved construction productivity via their implementation. Hence, the purpose of this paper is to critically review the capabilities of OSM and BIM techniques, as well as their potential interactions, in productivity improvement. Design/methodology/approach: A scoping review approach was adopted, where 100 peer-reviewed journal articles were collected to analyse the capabilities of OSM and BIM, as well as their potential interactions, in productivity improvement as assessed by key productivity indicators (KPrIs). Findings: The results reveal seven BIM-based capabilities and six OSM-based capabilities, as well as 12 potential OSM–BIM interactions that have significant potential for satisfying KPrIs. Originality/value: An integrated framework has also been developed to clarify and conceptualise the roles of OSM–BIM interactions in their designated KPrIs. The research has developed insightful and practical references for strategic planning and management in OSM–BIM-based projects. |
| first_indexed | 2025-11-14T11:12:53Z |
| format | Journal Article |
| id | curtin-20.500.11937-79281 |
| institution | Curtin University Malaysia |
| institution_category | Local University |
| language | English |
| last_indexed | 2025-11-14T11:12:53Z |
| publishDate | 2019 |
| publisher | EMERALD GROUP PUBLISHING LTD |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | curtin-20.500.11937-792812021-01-13T03:09:37Z Interactions between building information modelling and off-site manufacturing for productivity improvement Ghasemi Poor Sabet, Pejman Chong, Heap-Yih (John) Social Sciences Business Management Business & Economics BIM Construction LABOR PRODUCTIVITY INTEGRATING BIM CONSTRUCTION PERFORMANCE FRAMEWORK IMPLEMENTATION INDICATORS ADOPTION TRENDS © 2019. Emerald Publishing Limited. Purpose: New methods have been introduced as revolutionary approaches in the construction industry, such as off-site manufacturing (OSM) and building information modelling (BIM). Although these approaches can provide many benefits, there are still barriers to meeting the expectations of improved construction productivity via their implementation. Hence, the purpose of this paper is to critically review the capabilities of OSM and BIM techniques, as well as their potential interactions, in productivity improvement. Design/methodology/approach: A scoping review approach was adopted, where 100 peer-reviewed journal articles were collected to analyse the capabilities of OSM and BIM, as well as their potential interactions, in productivity improvement as assessed by key productivity indicators (KPrIs). Findings: The results reveal seven BIM-based capabilities and six OSM-based capabilities, as well as 12 potential OSM–BIM interactions that have significant potential for satisfying KPrIs. Originality/value: An integrated framework has also been developed to clarify and conceptualise the roles of OSM–BIM interactions in their designated KPrIs. The research has developed insightful and practical references for strategic planning and management in OSM–BIM-based projects. 2019 Journal Article http://hdl.handle.net/20.500.11937/79281 10.1108/IJMPB-08-2018-0168 English http://purl.org/au-research/grants/arc/DP170104612 http://creativecommons.org/licenses/by/4.0/ EMERALD GROUP PUBLISHING LTD fulltext |
| spellingShingle | Social Sciences Business Management Business & Economics BIM Construction LABOR PRODUCTIVITY INTEGRATING BIM CONSTRUCTION PERFORMANCE FRAMEWORK IMPLEMENTATION INDICATORS ADOPTION TRENDS Ghasemi Poor Sabet, Pejman Chong, Heap-Yih (John) Interactions between building information modelling and off-site manufacturing for productivity improvement |
| title | Interactions between building information modelling and off-site manufacturing for productivity improvement |
| title_full | Interactions between building information modelling and off-site manufacturing for productivity improvement |
| title_fullStr | Interactions between building information modelling and off-site manufacturing for productivity improvement |
| title_full_unstemmed | Interactions between building information modelling and off-site manufacturing for productivity improvement |
| title_short | Interactions between building information modelling and off-site manufacturing for productivity improvement |
| title_sort | interactions between building information modelling and off-site manufacturing for productivity improvement |
| topic | Social Sciences Business Management Business & Economics BIM Construction LABOR PRODUCTIVITY INTEGRATING BIM CONSTRUCTION PERFORMANCE FRAMEWORK IMPLEMENTATION INDICATORS ADOPTION TRENDS |
| url | http://purl.org/au-research/grants/arc/DP170104612 http://hdl.handle.net/20.500.11937/79281 |