Relationship between BIM Implementation and Performance of OSM Projects
© 2019 American Society of Civil Engineers. Building information modeling (BIM) and off-site manufacturing (OSM) approaches have been recognized as revolutionary methods in the construction industry. However, limited empirical studies have investigated the relations and effects of BIM in OSM pro...
| Main Authors: | , , |
|---|---|
| Format: | Journal Article |
| Language: | English |
| Published: |
ASCE-AMER SOC CIVIL ENGINEERS
2019
|
| Subjects: | |
| Online Access: | http://hdl.handle.net/20.500.11937/79280 |
| _version_ | 1848764030501519360 |
|---|---|
| author | Tang, X. Chong, Heap-Yih (John) Zhang, W. |
| author_facet | Tang, X. Chong, Heap-Yih (John) Zhang, W. |
| author_sort | Tang, X. |
| building | Curtin Institutional Repository |
| collection | Online Access |
| description | © 2019 American Society of Civil Engineers.
Building information modeling (BIM) and off-site manufacturing (OSM) approaches have been recognized as revolutionary methods in the construction industry. However, limited empirical studies have investigated the relations and effects of BIM in OSM projects. Hence, this study aims to explore the direct relationship between BIM implementation and the performance of OSM projects through their key influential factors. The empirical data were collected through questionnaires and analyzed using the partial least-squares technique. The results show there is a strong relationship between BIM implementation and the performance of OSM projects through integration management and cooperation behavior. Contract management plays a negative moderating effect on the relationship between integration management and the performance of OSM projects. These findings provide new insights into the detailed implementation strategies for BIM in improving OSM projects' performance through their correlated relations. This research also contributes to the effective promotion and use of BIM and OSM in the construction industry. |
| first_indexed | 2025-11-14T11:12:52Z |
| format | Journal Article |
| id | curtin-20.500.11937-79280 |
| institution | Curtin University Malaysia |
| institution_category | Local University |
| language | English |
| last_indexed | 2025-11-14T11:12:52Z |
| publishDate | 2019 |
| publisher | ASCE-AMER SOC CIVIL ENGINEERS |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | curtin-20.500.11937-792802020-08-04T05:34:56Z Relationship between BIM Implementation and Performance of OSM Projects Tang, X. Chong, Heap-Yih (John) Zhang, W. Science & Technology Technology Engineering, Industrial Engineering, Civil Engineering Building information modeling (BIM) Off-site manufacturing (OSM) Integration management Contract management Partial least-squares technique LIFE-CYCLE JOINT VENTURE MANAGEMENT COOPERATION PRODUCTIVITY GOVERNANCE FLEXIBILITY CHALLENGES STRATEGIES EXCHANGES © 2019 American Society of Civil Engineers. Building information modeling (BIM) and off-site manufacturing (OSM) approaches have been recognized as revolutionary methods in the construction industry. However, limited empirical studies have investigated the relations and effects of BIM in OSM projects. Hence, this study aims to explore the direct relationship between BIM implementation and the performance of OSM projects through their key influential factors. The empirical data were collected through questionnaires and analyzed using the partial least-squares technique. The results show there is a strong relationship between BIM implementation and the performance of OSM projects through integration management and cooperation behavior. Contract management plays a negative moderating effect on the relationship between integration management and the performance of OSM projects. These findings provide new insights into the detailed implementation strategies for BIM in improving OSM projects' performance through their correlated relations. This research also contributes to the effective promotion and use of BIM and OSM in the construction industry. 2019 Journal Article http://hdl.handle.net/20.500.11937/79280 10.1061/(ASCE)ME.1943-5479.0000704 English ASCE-AMER SOC CIVIL ENGINEERS fulltext |
| spellingShingle | Science & Technology Technology Engineering, Industrial Engineering, Civil Engineering Building information modeling (BIM) Off-site manufacturing (OSM) Integration management Contract management Partial least-squares technique LIFE-CYCLE JOINT VENTURE MANAGEMENT COOPERATION PRODUCTIVITY GOVERNANCE FLEXIBILITY CHALLENGES STRATEGIES EXCHANGES Tang, X. Chong, Heap-Yih (John) Zhang, W. Relationship between BIM Implementation and Performance of OSM Projects |
| title | Relationship between BIM Implementation and Performance of OSM Projects |
| title_full | Relationship between BIM Implementation and Performance of OSM Projects |
| title_fullStr | Relationship between BIM Implementation and Performance of OSM Projects |
| title_full_unstemmed | Relationship between BIM Implementation and Performance of OSM Projects |
| title_short | Relationship between BIM Implementation and Performance of OSM Projects |
| title_sort | relationship between bim implementation and performance of osm projects |
| topic | Science & Technology Technology Engineering, Industrial Engineering, Civil Engineering Building information modeling (BIM) Off-site manufacturing (OSM) Integration management Contract management Partial least-squares technique LIFE-CYCLE JOINT VENTURE MANAGEMENT COOPERATION PRODUCTIVITY GOVERNANCE FLEXIBILITY CHALLENGES STRATEGIES EXCHANGES |
| url | http://hdl.handle.net/20.500.11937/79280 |