SWP-enabled constraints modeling for on-site assembly process of prefabrication housing production
© 2019 Elsevier Ltd Prefabrication housing production (PHP) processes are fragmented and full of variability. Their schedule reliability is particularly disturbed by the constraints deriving from task executions in the on-site assembly process. Proactive constraints modeling, including identifying c...
| Main Authors: | Li, X., Wu, C., Wu, Peng, Xiang, L., Shen, G.Q., Vick, S., Li, C.Z. |
|---|---|
| Format: | Journal Article |
| Published: |
2019
|
| Online Access: | http://purl.org/au-research/grants/arc/DP180104026 http://hdl.handle.net/20.500.11937/76509 |
Similar Items
Integrating Building Information Modeling and Prefabrication Housing Production
by: Li, X., et al.
Published: (2019)
by: Li, X., et al.
Published: (2019)
RBL-PHP: Simulation of Lean Construction and Information Technologies for Prefabrication Housing Production
by: Li, X., et al.
Published: (2018)
by: Li, X., et al.
Published: (2018)
Complexity Analysis of Prefabrication Contractors' Dynamic Price Competition in Mega Projects with Different Competition Strategies
by: Zhu, J., et al.
Published: (2018)
by: Zhu, J., et al.
Published: (2018)
The development of a low carbon prefabricated house
by: Zhang, Shihao
Published: (2022)
by: Zhang, Shihao
Published: (2022)
An Inexact Dual Fast Gradient-Projection Method for Separable Convex Optimization with Linear Coupled Constraints
by: Li, J., et al.
Published: (2015)
by: Li, J., et al.
Published: (2015)
Development Of Prefabricated Building Implementation Frame Work For Addressing Housing Needs In Libya
by: El Abidi, Khaled M Amtered
Published: (2018)
by: El Abidi, Khaled M Amtered
Published: (2018)
Distributed proximal-gradient methods for convex optimization with inequality constraints
by: Li, J., et al.
Published: (2014)
by: Li, J., et al.
Published: (2014)
Distributed Optimization Methods for Nonconvex Problems with Inequality Constraints over Time-Varying Networks
by: Li, J., et al.
Published: (2017)
by: Li, J., et al.
Published: (2017)
Early history of the eastern Sibao Orogen (South China) during the assembly of Rodinia: New mica 40Ar/39Ar dating and SHRIMP U-Pb detrital zircon provenance constraints
by: Li, Zheng-Xiang, et al.
Published: (2007)
by: Li, Zheng-Xiang, et al.
Published: (2007)
Evaluation of prefabricated construction systems and materials' thermal performance with reference to housing construction in Saudi Arabia
by: Alkelani, Abdulaziz
Published: (2025)
by: Alkelani, Abdulaziz
Published: (2025)
FM as a Business Enabler: Solutions for Managing the Built Environment, Sydney Opera House- Facilities Management (FM) Exemplar Project
by: Wu, Jeremy
Published: (2007)
by: Wu, Jeremy
Published: (2007)
Safety investments and safety climate in construction sites
by: Feng, Y., et al.
Published: (2014)
by: Feng, Y., et al.
Published: (2014)
Circular Economy of Advanced Prefabricated Buildings
by: O’Grady, Timothy Michael
Published: (2022)
by: O’Grady, Timothy Michael
Published: (2022)
Transportation Induced Damage to Prefabricated Structures
by: Chen, Yijun
Published: (2021)
by: Chen, Yijun
Published: (2021)
Evaluating the Material Waste Reduction by Using Prefabrication in Building Construction in Kuala Lumpur
by: Nurul Aini, Osman, et al.
Published: (2016)
by: Nurul Aini, Osman, et al.
Published: (2016)
Development of prefabricated building implementation framework for addressing housing needs in libya/ Khaled M. Amtered El-Abidi
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2018)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2018)
Seismic Performance Of A Double-Storey Prefabricated Cold-Formed Steel Structure As Post-Disaster Temporary Housing
by: Wong, Jia Hui
Published: (2021)
by: Wong, Jia Hui
Published: (2021)
Detrital zircon U-Pb geochronology, Hf isotopes and geochemistry constraints on crustal growth and Mesozoic tectonics of southeastern China
by: Meng, L., et al.
Published: (2014)
by: Meng, L., et al.
Published: (2014)
Performance of Composite and Monolithic Prefabricated Vertical Drains
by: Ali, Faisal, et al.
Published: (1992)
by: Ali, Faisal, et al.
Published: (1992)
Tunable Assembly of Organosilica Hollow Nanospheres
by: Liu, Jian, et al.
Published: (2010)
by: Liu, Jian, et al.
Published: (2010)
Min-max optimal control of linear systems with uncertainty and terminal state constraints
by: Wu, C., et al.
Published: (2013)
by: Wu, C., et al.
Published: (2013)
Structural behavior and vibration characteristics of geopolymer composite lightweight sandwich panels for prefabricated buildings
by: Cui, Yanqiang, et al.
Published: (2022)
by: Cui, Yanqiang, et al.
Published: (2022)
Identification of non-value adding (NVA) activities in precast concrete installation sites to achieve low-carbon installation
by: Wu, Peng, et al.
Published: (2013)
by: Wu, Peng, et al.
Published: (2013)
Modelling and optimisation of assembly line balancing problem with resource constraint
by: Nur Hairunnisa, Kamarudin
Published: (2019)
by: Nur Hairunnisa, Kamarudin
Published: (2019)
Modelling and optimization of assembly line balancing with multi-resource constraints
by: Ab Rashid, Mohd Fadzil Faisae, et al.
Published: (2017)
by: Ab Rashid, Mohd Fadzil Faisae, et al.
Published: (2017)
Modelling and optimization of assembly line balancing with multi-resource constraints
by: Ab Rashid, Mohd Fadzil Faisae
Published: (2013)
by: Ab Rashid, Mohd Fadzil Faisae
Published: (2013)
Optimization of two sided assembly line balancing with resource constraint
by: Muhammad Razif, Abdullah Make
Published: (2022)
by: Muhammad Razif, Abdullah Make
Published: (2022)
Magmatic and metamorphic events during the early Paleozoic Wuyi-Yunkai orogeny, southeastern South China: New age constraints and pressure-temperature conditions
by: Li, Zheng-Xiang, et al.
Published: (2010)
by: Li, Zheng-Xiang, et al.
Published: (2010)
Heterogeneous Exhumation of the Mount Isa Orogen in NE Australia After 1.6 Ga Nuna Assembly: New High-Precision 40Ar/39Ar Thermochronological Constraints
by: Li, Jiangyu, et al.
Published: (2020)
by: Li, Jiangyu, et al.
Published: (2020)
The mechanical performance of concrete shear key for prefabricated structures
by: Zhang, Xihong, et al.
Published: (2021)
by: Zhang, Xihong, et al.
Published: (2021)
Assembly and Breakup of Rodinia(Some Results of IGCP Project 440)
by: Bogdanova , S., et al.
Published: (2009)
by: Bogdanova , S., et al.
Published: (2009)
Building cost comparison between conventional and fully prefabricated systems in Malaysia: a case study of single and double storey house
by: Haron, Nuzul Azam, et al.
Published: (2007)
by: Haron, Nuzul Azam, et al.
Published: (2007)
Global navigation satellite system ambiguity resolution with constraints from normal equations
by: Li, Bofeng, et al.
Published: (2010)
by: Li, Bofeng, et al.
Published: (2010)
The development of price-wise e-commerce enabled web site.
by: Salleh, Mazleena, et al.
Published: (2001)
by: Salleh, Mazleena, et al.
Published: (2001)
Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints
by: Muhammad Razif, Abdullah Make, et al.
Published: (2016)
by: Muhammad Razif, Abdullah Make, et al.
Published: (2016)
NSGA-II Algorithm for Assembly Line Balancing with Multi-Resource Constraints
by: M. F. F., Ab Rashid, et al.
Published: (2016)
by: M. F. F., Ab Rashid, et al.
Published: (2016)
Optimization of mixed-model assembly line balancing problem with resource constraints
by: M. M., Razali, et al.
Published: (2017)
by: M. M., Razali, et al.
Published: (2017)
Optimal Power Allocation for Non-Regenerative Multicarrier Relay-Assisted PLC Systems with QoS Constraints
by: Wu, X., et al.
Published: (2015)
by: Wu, X., et al.
Published: (2015)
Joint Contract-Function Effects on BIM-Enabled EPC Project Performance
by: Lee, C.Y., et al.
Published: (2020)
by: Lee, C.Y., et al.
Published: (2020)
Identifying outdoor assembly sites in early medieval England
by: Baker, John, et al.
Published: (2015)
by: Baker, John, et al.
Published: (2015)
Similar Items
-
Integrating Building Information Modeling and Prefabrication Housing Production
by: Li, X., et al.
Published: (2019) -
RBL-PHP: Simulation of Lean Construction and Information Technologies for Prefabrication Housing Production
by: Li, X., et al.
Published: (2018) -
Complexity Analysis of Prefabrication Contractors' Dynamic Price Competition in Mega Projects with Different Competition Strategies
by: Zhu, J., et al.
Published: (2018) -
The development of a low carbon prefabricated house
by: Zhang, Shihao
Published: (2022) -
An Inexact Dual Fast Gradient-Projection Method for Separable Convex Optimization with Linear Coupled Constraints
by: Li, J., et al.
Published: (2015)