Determination of the transition Point from Open Pit to Underground Mining
Many open pit (OP) mines with considerable vertical extent are approaching towards the end of their life-of-mine (LOM), and some of them are seeking the opportunity to make the transition from OP to underground (UG) mining. While conventionally, the transition to UG mining is considered near or afte...
| Main Authors: | Chung, J., Asad, Mohammad, Topal, Erkan, Ghosh, Apurna |
|---|---|
| Format: | Conference Paper |
| Published: |
2016
|
| Online Access: | http://hdl.handle.net/20.500.11937/75747 |
Similar Items
Where to Make the Transition from Open-pit to Underground?: Using Integer Programming
by: Chung, J., et al.
Published: (2016)
by: Chung, J., et al.
Published: (2016)
Transition from open-pit to underground – using Integer Programming considering grade uncertainty
by: Chung, Joyce Sze Yee, et al.
Published: (2015)
by: Chung, Joyce Sze Yee, et al.
Published: (2015)
A Mixed Integer Programming Approach
for Transitioning from Open-pit to
Underground Mining
by: Chung, Joyce Sze Yee
Published: (2020)
by: Chung, Joyce Sze Yee
Published: (2020)
Flexible open-pit mine design under uncertainty
by: Groeneveld, Ben, et al.
Published: (2011)
by: Groeneveld, Ben, et al.
Published: (2011)
Net present value maximisation model for optimum cut-off grade policy of open pit mining operations
by: Asad, M., et al.
Published: (2011)
by: Asad, M., et al.
Published: (2011)
Using Clustering Methods for Open Pit Mine Production Scheduling
by: Ren, H., et al.
Published: (2014)
by: Ren, H., et al.
Published: (2014)
Robust versus Flexible Open Pit Mine Design
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
Optimising the long-term mine waste management and truck schedule in a largescale open pit mine
by: Li, Y., et al.
Published: (2016)
by: Li, Y., et al.
Published: (2016)
A new model for open-pit production and waste-dump scheduling
by: Fu, Z., et al.
Published: (2019)
by: Fu, Z., et al.
Published: (2019)
A new generic open pit mine planning process with risk assessment ability
by: Mai, N., et al.
Published: (2016)
by: Mai, N., et al.
Published: (2016)
A heuristic approach to optimal design of an underground mine stope layout
by: Sandanayake, D., et al.
Published: (2015)
by: Sandanayake, D., et al.
Published: (2015)
Implementing a New Heuristic Approach to the Underground Mine Stope Layout Problem
by: Sandanayake, D., et al.
Published: (2014)
by: Sandanayake, D., et al.
Published: (2014)
Designing an optimal stope layout for underground mining based on a heuristic algorithm
by: Sandanayake, D., et al.
Published: (2015)
by: Sandanayake, D., et al.
Published: (2015)
Risk Assessment of Occupational Injuries in Underground Coal Mines
by: Ghosh, Apurna
Published: (2010)
by: Ghosh, Apurna
Published: (2010)
A new open-pit mine planning optimization method using block aggregation and integer programming
by: Mai, N., et al.
Published: (2018)
by: Mai, N., et al.
Published: (2018)
Optimising the long term mine landform progression and truck hour schedule in a large scale open pit mine using mixed integer programming
by: Li, Y., et al.
Published: (2018)
by: Li, Y., et al.
Published: (2018)
Integrated Optimization of Underground Mine Design and Scheduling
by: Little, J, et al.
Published: (2013)
by: Little, J, et al.
Published: (2013)
Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming
by: Li, Y, et al.
Published: (2014)
by: Li, Y, et al.
Published: (2014)
Application of Shuttle Radar Topography Mission Data in Hydrological Analysis of Super Pit and Griffin Coal Mine
by: Ghosh, Apurna
Published: (2016)
by: Ghosh, Apurna
Published: (2016)
Dilution prediction in underground open stope mining using gene expression programming and backpropagation artificial neural network algorithms
by: Chimunhu, Prosper, et al.
Published: (2025)
by: Chimunhu, Prosper, et al.
Published: (2025)
Explosion risk assessment model for underground mine atmosphere
by: Cheng, J., et al.
Published: (2017)
by: Cheng, J., et al.
Published: (2017)
Evolution of underground coal mine explosion law in Australia, 1887-2007
by: Ghosh, Apurna, et al.
Published: (2014)
by: Ghosh, Apurna, et al.
Published: (2014)
Stochastic production phase design for an open pit mining complex with multiple processing streams
by: Asad, Mohammad Waqar, et al.
Published: (2014)
by: Asad, Mohammad Waqar, et al.
Published: (2014)
Optimum design of open pit mines
by: Giannini, Luciano Mario
Published: (1990)
by: Giannini, Luciano Mario
Published: (1990)
Development of Novel Hybrid Intelligent Predictive Models for Dilution Prediction in Underground Sub-level Mining
by: Chimunhu, Prosper, et al.
Published: (2024)
by: Chimunhu, Prosper, et al.
Published: (2024)
A review of cut-off grade policy models for open pit mining operations
by: Asad, Mohammad, et al.
Published: (2016)
by: Asad, Mohammad, et al.
Published: (2016)
Developments in Mine Design, Planning and Scheduling in Open Cut Mining
by: Saydam, S., et al.
Published: (2012)
by: Saydam, S., et al.
Published: (2012)
Loglinear Model for Assessment of Risk Factors of Occupational Injuries in Underground Coal Mines
by: Ghosh, Apurna, et al.
Published: (2009)
by: Ghosh, Apurna, et al.
Published: (2009)
Strategies to assist in obtaining an optimal solution for an underground mine planning problem using Mixed Integer Programming
by: Little, J., et al.
Published: (2011)
by: Little, J., et al.
Published: (2011)
A new mathematical programming model for production schedule optimisation in underground mining operations
by: Nehring, M., et al.
Published: (2010)
by: Nehring, M., et al.
Published: (2010)
Optimal production scale of open pit mining operations with uncertain metal supply and long-term stockpiles
by: Asad, Mohammad Waqar, et al.
Published: (2012)
by: Asad, Mohammad Waqar, et al.
Published: (2012)
The future of underground mine planning in the era of machine learning: Opportunities for engineering robustness and flexibility
by: Chimunhu, Prosper, et al.
Published: (2024)
by: Chimunhu, Prosper, et al.
Published: (2024)
Integrated short and medium term underground mine production scheduling
by: Nehring, M., et al.
Published: (2012)
by: Nehring, M., et al.
Published: (2012)
Illumination of parameter contributions on uneven break phenomenon in underground stoping mines
by: Jang, Hyong Doo, et al.
Published: (2016)
by: Jang, Hyong Doo, et al.
Published: (2016)
Performance evaluation of a new stochastic network flow approach to optimal open pit mine design - application at a gold mine
by: Asad, Mohammad Waqar, et al.
Published: (2012)
by: Asad, Mohammad Waqar, et al.
Published: (2012)
A method for optimal cut-off grade policy in open pit mining operations under uncertain supply
by: Khan, A., et al.
Published: (2019)
by: Khan, A., et al.
Published: (2019)
A heuristic approach to stochastic cutoff grade optimization for open pit mining complexes with multiple processing streams
by: Asad, Mohammad Waqar, et al.
Published: (2013)
by: Asad, Mohammad Waqar, et al.
Published: (2013)
Lost work days as a measure of risk assessment in underground coal mines
by: Ghosh, Apurna, et al.
Published: (2015)
by: Ghosh, Apurna, et al.
Published: (2015)
Implementing a parametric maximum flow algorithm for optimal open pit mine design under uncertain supply and demand
by: Asad, Mohammad Waqar, et al.
Published: (2013)
by: Asad, Mohammad Waqar, et al.
Published: (2013)
Using Artificial Neural Networks (ANNs) to Predict Stope Overbreak at Plutonic Underground Gold Mine
by: Boxwell, D., et al.
Published: (2014)
by: Boxwell, D., et al.
Published: (2014)
Similar Items
-
Where to Make the Transition from Open-pit to Underground?: Using Integer Programming
by: Chung, J., et al.
Published: (2016) -
Transition from open-pit to underground – using Integer Programming considering grade uncertainty
by: Chung, Joyce Sze Yee, et al.
Published: (2015) -
A Mixed Integer Programming Approach
for Transitioning from Open-pit to
Underground Mining
by: Chung, Joyce Sze Yee
Published: (2020) -
Flexible open-pit mine design under uncertainty
by: Groeneveld, Ben, et al.
Published: (2011) -
Net present value maximisation model for optimum cut-off grade policy of open pit mining operations
by: Asad, M., et al.
Published: (2011)