APA (7th ed.) Citation

Mai, N., Topal, E., Erten, O., & Sommerville, B. (2018). A new risk-based optimisation method for the iron ore production scheduling using stochastic integer programming. Pergamon Press.

Chicago Style (17th ed.) Citation

Mai, N., Erkan Topal, Oktay Erten, and B. Sommerville. A New Risk-based Optimisation Method for the Iron Ore Production Scheduling Using Stochastic Integer Programming. Pergamon Press, 2018.

MLA (9th ed.) Citation

Mai, N., et al. A New Risk-based Optimisation Method for the Iron Ore Production Scheduling Using Stochastic Integer Programming. Pergamon Press, 2018.

Warning: These citations may not always be 100% accurate.