Cost profiling of water infrastructure projects

© 2018 American Society of Civil Engineers. The expected final budgeted costs of infrastructure assets are often exceeded during project delivery. Being able to determine the likelihood of changes to the final budget can enable clients to implement strategies to manage and control costs during const...

Full description

Bibliographic Details
Main Authors: Love, Peter, Ahiaga-Dagbui, D., Smith, S., Sing, M., Tokede, O.
Format: Journal Article
Published: American Society of Civil Engineers 2018
Online Access:http://hdl.handle.net/20.500.11937/71085
_version_ 1848762385634951168
author Love, Peter
Ahiaga-Dagbui, D.
Smith, S.
Sing, M.
Tokede, O.
author_facet Love, Peter
Ahiaga-Dagbui, D.
Smith, S.
Sing, M.
Tokede, O.
author_sort Love, Peter
building Curtin Institutional Repository
collection Online Access
description © 2018 American Society of Civil Engineers. The expected final budgeted costs of infrastructure assets are often exceeded during project delivery. Being able to determine the likelihood of changes to the final budget can enable clients to implement strategies to manage and control costs during construction. To understand the changing nature of costs, this paper examines the cost profiles of 1,093 water infrastructure projects that were delivered by a water utility company. Cost overruns were experienced in 656 projects. Only 1 project was delivered on budget; the remaining 436 were completed under final budget approval. A mean cost overrun and underrun of + 19.97 and -32%, are found, respectively. The best-fit distribution for cost overruns and underruns for determining their probability of occurrence is calculated. The research moves beyond examining the cost performance of heterogeneous data sets that have dominated previous studies to the use of a homogeneous sample, which enables more-reliable contingency forecasts to be determined.
first_indexed 2025-11-14T10:46:44Z
format Journal Article
id curtin-20.500.11937-71085
institution Curtin University Malaysia
institution_category Local University
last_indexed 2025-11-14T10:46:44Z
publishDate 2018
publisher American Society of Civil Engineers
recordtype eprints
repository_type Digital Repository
spelling curtin-20.500.11937-710852018-12-13T09:35:01Z Cost profiling of water infrastructure projects Love, Peter Ahiaga-Dagbui, D. Smith, S. Sing, M. Tokede, O. © 2018 American Society of Civil Engineers. The expected final budgeted costs of infrastructure assets are often exceeded during project delivery. Being able to determine the likelihood of changes to the final budget can enable clients to implement strategies to manage and control costs during construction. To understand the changing nature of costs, this paper examines the cost profiles of 1,093 water infrastructure projects that were delivered by a water utility company. Cost overruns were experienced in 656 projects. Only 1 project was delivered on budget; the remaining 436 were completed under final budget approval. A mean cost overrun and underrun of + 19.97 and -32%, are found, respectively. The best-fit distribution for cost overruns and underruns for determining their probability of occurrence is calculated. The research moves beyond examining the cost performance of heterogeneous data sets that have dominated previous studies to the use of a homogeneous sample, which enables more-reliable contingency forecasts to be determined. 2018 Journal Article http://hdl.handle.net/20.500.11937/71085 10.1061/(ASCE)IS.1943-555X.0000441 American Society of Civil Engineers restricted
spellingShingle Love, Peter
Ahiaga-Dagbui, D.
Smith, S.
Sing, M.
Tokede, O.
Cost profiling of water infrastructure projects
title Cost profiling of water infrastructure projects
title_full Cost profiling of water infrastructure projects
title_fullStr Cost profiling of water infrastructure projects
title_full_unstemmed Cost profiling of water infrastructure projects
title_short Cost profiling of water infrastructure projects
title_sort cost profiling of water infrastructure projects
url http://hdl.handle.net/20.500.11937/71085