Optimizing lift operations and vessel transport schedules for disassembly of multiple offshore platforms using BIM and GIS

As the coming decades will witness a big trend in the decommissioning of offshore platforms, simultaneously disassembling topsides of multiple offshore platforms is getting increasingly common. Considering high risk and cost of offshore operations, module lift planning among multiple offshore platfo...

Full description

Bibliographic Details
Main Authors: Tan, Y., Song, Y., Zhu, J., Long, Q., Wang, Xiangyu, Cheng, J.
Format: Journal Article
Published: Elsevier BV 2018
Online Access:http://purl.org/au-research/grants/arc/DP170104613
http://hdl.handle.net/20.500.11937/70136
_version_ 1848762224565288960
author Tan, Y.
Song, Y.
Zhu, J.
Long, Q.
Wang, Xiangyu
Cheng, J.
author_facet Tan, Y.
Song, Y.
Zhu, J.
Long, Q.
Wang, Xiangyu
Cheng, J.
author_sort Tan, Y.
building Curtin Institutional Repository
collection Online Access
description As the coming decades will witness a big trend in the decommissioning of offshore platforms, simultaneously disassembling topsides of multiple offshore platforms is getting increasingly common. Considering high risk and cost of offshore operations, module lift planning among multiple offshore platforms with transport vessels is required to be carefully conducted. The lift planning usually contains two main parts: module layout on vessels planning and vessel transport schedules arrangement. In contrast to the current experience-driven module lift planning, this paper formulates the lift planning optimization problem and develops a web system integrating building information modeling (BIM) and geographical information system (GIS) to efficiently disassemble topsides for multiple offshore platforms. BIM provides detailed information required for planning module layout on vessels and GIS contains the management and analysis of geospatial information for the vessel transport schedule arrangement. As for module layout optimization, three heuristic algorithms, namely genetic algorithm (GA), particle swarm optimization (PSO), and firefly algorithm (FA) are implemented and compared to obtain the module layout with the minimum total lift time. While for vessel transport schedule, graph search technique is integrated with a developed schedule clash detection function to obtain the transport schedule with the minimum sailing time. The proposed optimization algorithms and techniques are integrated into a developed BIM/GIS-based web system. An example of three offshore platforms with eighteen modules in total is used to illustrate the developed system. Results show that the developed system can significantly improve the efficiency of lift planning in multiple topsides disassembly. The developed BIM/GIS-based web system is also effective and practical in the resource allocation and task assignment among multiple locations, such as construction sites, buildings, and even cities.
first_indexed 2025-11-14T10:44:10Z
format Journal Article
id curtin-20.500.11937-70136
institution Curtin University Malaysia
institution_category Local University
last_indexed 2025-11-14T10:44:10Z
publishDate 2018
publisher Elsevier BV
recordtype eprints
repository_type Digital Repository
spelling curtin-20.500.11937-701362022-10-27T07:10:18Z Optimizing lift operations and vessel transport schedules for disassembly of multiple offshore platforms using BIM and GIS Tan, Y. Song, Y. Zhu, J. Long, Q. Wang, Xiangyu Cheng, J. As the coming decades will witness a big trend in the decommissioning of offshore platforms, simultaneously disassembling topsides of multiple offshore platforms is getting increasingly common. Considering high risk and cost of offshore operations, module lift planning among multiple offshore platforms with transport vessels is required to be carefully conducted. The lift planning usually contains two main parts: module layout on vessels planning and vessel transport schedules arrangement. In contrast to the current experience-driven module lift planning, this paper formulates the lift planning optimization problem and develops a web system integrating building information modeling (BIM) and geographical information system (GIS) to efficiently disassemble topsides for multiple offshore platforms. BIM provides detailed information required for planning module layout on vessels and GIS contains the management and analysis of geospatial information for the vessel transport schedule arrangement. As for module layout optimization, three heuristic algorithms, namely genetic algorithm (GA), particle swarm optimization (PSO), and firefly algorithm (FA) are implemented and compared to obtain the module layout with the minimum total lift time. While for vessel transport schedule, graph search technique is integrated with a developed schedule clash detection function to obtain the transport schedule with the minimum sailing time. The proposed optimization algorithms and techniques are integrated into a developed BIM/GIS-based web system. An example of three offshore platforms with eighteen modules in total is used to illustrate the developed system. Results show that the developed system can significantly improve the efficiency of lift planning in multiple topsides disassembly. The developed BIM/GIS-based web system is also effective and practical in the resource allocation and task assignment among multiple locations, such as construction sites, buildings, and even cities. 2018 Journal Article http://hdl.handle.net/20.500.11937/70136 10.1016/j.autcon.2018.07.012 http://purl.org/au-research/grants/arc/DP170104613 Elsevier BV restricted
spellingShingle Tan, Y.
Song, Y.
Zhu, J.
Long, Q.
Wang, Xiangyu
Cheng, J.
Optimizing lift operations and vessel transport schedules for disassembly of multiple offshore platforms using BIM and GIS
title Optimizing lift operations and vessel transport schedules for disassembly of multiple offshore platforms using BIM and GIS
title_full Optimizing lift operations and vessel transport schedules for disassembly of multiple offshore platforms using BIM and GIS
title_fullStr Optimizing lift operations and vessel transport schedules for disassembly of multiple offshore platforms using BIM and GIS
title_full_unstemmed Optimizing lift operations and vessel transport schedules for disassembly of multiple offshore platforms using BIM and GIS
title_short Optimizing lift operations and vessel transport schedules for disassembly of multiple offshore platforms using BIM and GIS
title_sort optimizing lift operations and vessel transport schedules for disassembly of multiple offshore platforms using bim and gis
url http://purl.org/au-research/grants/arc/DP170104613
http://hdl.handle.net/20.500.11937/70136