Evaluation of Building Displacement Induced By EPB Tunneling Through GPS-GNSS Monitoring System and Back Analysis Technique (Tabriz Subway Twin Tunnels)

Bibliographic Details
Main Authors: Davarpanah, S., Sharifzadeh, Mostafa, Sattarvand, J., Narimani, S.
Format: Journal Article
Published: Iranian Society of Mining Engineering 2016
Online Access:http://hdl.handle.net/20.500.11937/69303
_version_ 1848762026477748224
author Davarpanah, S.
Sharifzadeh, Mostafa
Sattarvand, J.
Narimani, S.
author_facet Davarpanah, S.
Sharifzadeh, Mostafa
Sattarvand, J.
Narimani, S.
author_sort Davarpanah, S.
building Curtin Institutional Repository
collection Online Access
first_indexed 2025-11-14T10:41:01Z
format Journal Article
id curtin-20.500.11937-69303
institution Curtin University Malaysia
institution_category Local University
last_indexed 2025-11-14T10:41:01Z
publishDate 2016
publisher Iranian Society of Mining Engineering
recordtype eprints
repository_type Digital Repository
spelling curtin-20.500.11937-693032018-12-14T00:58:57Z Evaluation of Building Displacement Induced By EPB Tunneling Through GPS-GNSS Monitoring System and Back Analysis Technique (Tabriz Subway Twin Tunnels) Davarpanah, S. Sharifzadeh, Mostafa Sattarvand, J. Narimani, S. 2016 Journal Article http://hdl.handle.net/20.500.11937/69303 Iranian Society of Mining Engineering restricted
spellingShingle Davarpanah, S.
Sharifzadeh, Mostafa
Sattarvand, J.
Narimani, S.
Evaluation of Building Displacement Induced By EPB Tunneling Through GPS-GNSS Monitoring System and Back Analysis Technique (Tabriz Subway Twin Tunnels)
title Evaluation of Building Displacement Induced By EPB Tunneling Through GPS-GNSS Monitoring System and Back Analysis Technique (Tabriz Subway Twin Tunnels)
title_full Evaluation of Building Displacement Induced By EPB Tunneling Through GPS-GNSS Monitoring System and Back Analysis Technique (Tabriz Subway Twin Tunnels)
title_fullStr Evaluation of Building Displacement Induced By EPB Tunneling Through GPS-GNSS Monitoring System and Back Analysis Technique (Tabriz Subway Twin Tunnels)
title_full_unstemmed Evaluation of Building Displacement Induced By EPB Tunneling Through GPS-GNSS Monitoring System and Back Analysis Technique (Tabriz Subway Twin Tunnels)
title_short Evaluation of Building Displacement Induced By EPB Tunneling Through GPS-GNSS Monitoring System and Back Analysis Technique (Tabriz Subway Twin Tunnels)
title_sort evaluation of building displacement induced by epb tunneling through gps-gnss monitoring system and back analysis technique (tabriz subway twin tunnels)
url http://hdl.handle.net/20.500.11937/69303