Introduction
© 2018, Springer International Publishing AG. The viability of todays mining industry is very highly dependent on careful planning and management strategies that minimise operating costs. An important and challenging problem is that of selecting and allocating a fleet of trucks and loaders for use i...
| Main Authors: | Burt, C., Caccetta, Louis |
|---|---|
| Format: | Book Chapter |
| Published: |
2018
|
| Online Access: | http://hdl.handle.net/20.500.11937/68181 |
Similar Items
Literature review
by: Burt, C., et al.
Published: (2018)
by: Burt, C., et al.
Published: (2018)
Single location equipment selection
by: Burt, C., et al.
Published: (2018)
by: Burt, C., et al.
Published: (2018)
Methodology: Preliminaries and background
by: Burt, C., et al.
Published: (2018)
by: Burt, C., et al.
Published: (2018)
Multiple locations equipment selection
by: Burt, C., et al.
Published: (2018)
by: Burt, C., et al.
Published: (2018)
Case studies
by: Burt, C., et al.
Published: (2018)
by: Burt, C., et al.
Published: (2018)
Utilisation-based equipment selection
by: Burt, C., et al.
Published: (2018)
by: Burt, C., et al.
Published: (2018)
Match factor extensions
by: Burt, C., et al.
Published: (2018)
by: Burt, C., et al.
Published: (2018)
Accurate costing of mining equipment
by: Burt, C., et al.
Published: (2018)
by: Burt, C., et al.
Published: (2018)
Future research directions
by: Burt, C., et al.
Published: (2018)
by: Burt, C., et al.
Published: (2018)
Equipment selection for surface mining: a review
by: Burt, Christina, et al.
Published: (2014)
by: Burt, Christina, et al.
Published: (2014)
An milp approach to multi-location, multi-period equipment selection for surface mining with case studies
by: Burt, C., et al.
Published: (2016)
by: Burt, C., et al.
Published: (2016)
Equipment selection with heterogeneous fleets for multiple-period schedules
by: Burt, Christina, et al.
Published: (2011)
by: Burt, Christina, et al.
Published: (2011)
Online scheduling in Minimizing Makespan on Identical Parallel Processor with Release Date
by: Nordin, S., et al.
Published: (2014)
by: Nordin, S., et al.
Published: (2014)
Online scheduling in Minimizing Makespan on Identical Parallel Processor with Release Date
by: Nordin, S., et al.
Published: (2014)
by: Nordin, S., et al.
Published: (2014)
COMPUTATIONAL MODELS FOR TIMETABLING PROBLEM
by: Aizam, N., et al.
Published: (2014)
by: Aizam, N., et al.
Published: (2014)
Joint Pricing and Production Planning of Multi-period Multi-product Systems with Uncertainty in Demand
by: Caccetta, Louis, et al.
Published: (2012)
by: Caccetta, Louis, et al.
Published: (2012)
Impact of Price-Adjustments Costs on Integration of Pricing and Production Planning of Multiple-Products
by: Mardaneh, Elham, et al.
Published: (2014)
by: Mardaneh, Elham, et al.
Published: (2014)
A dynamic model of mobile source air pollution and its properties
by: Rumchev, Ventseslav, et al.
Published: (2007)
by: Rumchev, Ventseslav, et al.
Published: (2007)
A Hybrid Approach to Solve the Capacitated Vehicle Routing Problem
by: Caccetta, Louis, et al.
Published: (2010)
by: Caccetta, Louis, et al.
Published: (2010)
The SC1 property of an expected residual function arising from stochastic complementarity problems
by: Zhou, Guanglu, et al.
Published: (2008)
by: Zhou, Guanglu, et al.
Published: (2008)
Optimal Pricing and Production Planning for Multi-product Multi-period Systems with Backorders
by: Mardaneh, Elham, et al.
Published: (2013)
by: Mardaneh, Elham, et al.
Published: (2013)
Joint Pricing and Production Planning for Fixed Priced Multiple Products with Backorders
by: Caccetta, Louis, et al.
Published: (2010)
by: Caccetta, Louis, et al.
Published: (2010)
MILP model for resource disruption in parallel processor system
by: Nordin, Syarifah, et al.
Published: (2015)
by: Nordin, Syarifah, et al.
Published: (2015)
Cubic and quadruple Paley graphs with the n-e.c. property
by: Ananchuen, Watcharaphong, et al.
Published: (2006)
by: Ananchuen, Watcharaphong, et al.
Published: (2006)
Mixed integer programming model for scheduling in unrelated parallel processor system with priority consideration
by: Caccetta, Louis, et al.
Published: (2014)
by: Caccetta, Louis, et al.
Published: (2014)
MILP Model in Minimizing Makespan with Priority for Unrelated Parallel Machines
by: Caccetta, Louis, et al.
Published: (2010)
by: Caccetta, Louis, et al.
Published: (2010)
Adapted cross entropy method to investigate costly price-changes in pricing and production planning
by: Mardaneh, Elham, et al.
Published: (2016)
by: Mardaneh, Elham, et al.
Published: (2016)
Feasible semismooth Newton method for a class of stochastic linear complementarity problems
by: Zhou, Guanglu, et al.
Published: (2008)
by: Zhou, Guanglu, et al.
Published: (2008)
Task rescheduling model for resource disruption problem in unrelated parallel processor system
by: Nordin, Syarifah, et al.
Published: (2014)
by: Nordin, Syarifah, et al.
Published: (2014)
Introduction
by: Chrulew, Matthew, et al.
Published: (2015)
by: Chrulew, Matthew, et al.
Published: (2015)
Optimisation modelling of cancer growth
by: Jones, T., et al.
Published: (2017)
by: Jones, T., et al.
Published: (2017)
Mixed Integer Linear Programming Models for University Timetabling
by: Caccetta, Louis, et al.
Published: (2012)
by: Caccetta, Louis, et al.
Published: (2012)
Similar Items
-
Literature review
by: Burt, C., et al.
Published: (2018) -
Single location equipment selection
by: Burt, C., et al.
Published: (2018) -
Methodology: Preliminaries and background
by: Burt, C., et al.
Published: (2018) -
Multiple locations equipment selection
by: Burt, C., et al.
Published: (2018) -
Case studies
by: Burt, C., et al.
Published: (2018)