Utilisation-based equipment selection
© 2018, Springer International Publishing AG. When performing equipment selection, we can best account for the operating cost by considering the utilised hours of the equipment. In a surface mine, equipment is often not utilised to full capacity and not accounting for this difference may lead to inf...
| Main Authors: | Burt, C., Caccetta, Louis |
|---|---|
| Format: | Book Chapter |
| Published: |
2018
|
| Online Access: | http://hdl.handle.net/20.500.11937/67974 |
Similar Items
Single location equipment selection
by: Burt, C., et al.
Published: (2018)
by: Burt, C., et al.
Published: (2018)
Multiple locations equipment selection
by: Burt, C., et al.
Published: (2018)
by: Burt, C., et al.
Published: (2018)
Equipment selection for surface mining: a review
by: Burt, Christina, et al.
Published: (2014)
by: Burt, Christina, et al.
Published: (2014)
Accurate costing of mining equipment
by: Burt, C., et al.
Published: (2018)
by: Burt, C., et al.
Published: (2018)
Equipment selection with heterogeneous fleets for multiple-period schedules
by: Burt, Christina, et al.
Published: (2011)
by: Burt, Christina, et al.
Published: (2011)
An milp approach to multi-location, multi-period equipment selection for surface mining with case studies
by: Burt, C., et al.
Published: (2016)
by: Burt, C., et al.
Published: (2016)
Literature review
by: Burt, C., et al.
Published: (2018)
by: Burt, C., et al.
Published: (2018)
Introduction
by: Burt, C., et al.
Published: (2018)
by: Burt, C., et al.
Published: (2018)
Methodology: Preliminaries and background
by: Burt, C., et al.
Published: (2018)
by: Burt, C., et al.
Published: (2018)
Case studies
by: Burt, C., et al.
Published: (2018)
by: Burt, C., et al.
Published: (2018)
Match factor extensions
by: Burt, C., et al.
Published: (2018)
by: Burt, C., et al.
Published: (2018)
Future research directions
by: Burt, C., et al.
Published: (2018)
by: Burt, C., et al.
Published: (2018)
Mammography Equipment
by: Sa dos Reis, Claudia, et al.
Published: (2015)
by: Sa dos Reis, Claudia, et al.
Published: (2015)
Application of rock hardness and abrasive indexing to rock excavating equipment selection
by: Cassapi, V.B.
Published: (1987)
by: Cassapi, V.B.
Published: (1987)
Selection criteria for loading and hauling equipment - open pit mining applications
by: Hardy, Raymond J
Published: (2007)
by: Hardy, Raymond J
Published: (2007)
Road Construction Equipment Management: A Case Study on Selected Industry
by: Atnaw, Samson M., et al.
Published: (2016)
by: Atnaw, Samson M., et al.
Published: (2016)
Quality air monitoring equipment: the review of air quality
monitoring equipment
by: Rosman, Putri Shazlia, et al.
Published: (2020)
by: Rosman, Putri Shazlia, et al.
Published: (2020)
Quality air monitoring equipment: The review of air quality monitoring equipment
by: Putri Shazlia, Rosman, et al.
Published: (2020)
by: Putri Shazlia, Rosman, et al.
Published: (2020)
Personal safety equipment
by: Ngah, Nurziana
Published: (2011)
by: Ngah, Nurziana
Published: (2011)
Laboratory safety equipment
by: Ngah, Nurziana
Published: (2011)
by: Ngah, Nurziana
Published: (2011)
Laboratory equipment safety
by: Ngah, Nurziana
Published: (2011)
by: Ngah, Nurziana
Published: (2011)
Air blowing equipment
by: Ahmed, Musse Mohamud, et al.
Published: (2011)
by: Ahmed, Musse Mohamud, et al.
Published: (2011)
Equipment Quality Control
by: Sa dos Reis, Claudia
Published: (2015)
by: Sa dos Reis, Claudia
Published: (2015)
Condition-based prognostic tool for industrial equipment maintenance
by: Asmai, Siti Azirah, et al.
Published: (2011)
by: Asmai, Siti Azirah, et al.
Published: (2011)
Online scheduling in Minimizing Makespan on Identical Parallel Processor with Release Date
by: Nordin, S., et al.
Published: (2014)
by: Nordin, S., et al.
Published: (2014)
Online scheduling in Minimizing Makespan on Identical Parallel Processor with Release Date
by: Nordin, S., et al.
Published: (2014)
by: Nordin, S., et al.
Published: (2014)
Parameter selection for nonnegative l1 matrix/tensor sparse decomposition
by: Wang, Y., et al.
Published: (2015)
by: Wang, Y., et al.
Published: (2015)
Development of an intelligent material handling equipment selection system: a review of recent research
by: Vasili, Mohammad Reza, et al.
Published: (2005)
by: Vasili, Mohammad Reza, et al.
Published: (2005)
Digital terrain from a two-step segmentation and outlier-based algorithm
by: Hingee, Kassel, et al.
Published: (2016)
by: Hingee, Kassel, et al.
Published: (2016)
Electrical distribution equipment faults
by: Musse, Mohamud Ahmed, et al.
Published: (2011)
by: Musse, Mohamud Ahmed, et al.
Published: (2011)
Hospitals, Unimas praised for equipment
by: The Borneo Post
Published: (2006)
by: The Borneo Post
Published: (2006)
Process equipment information web-based system for process industries
by: Nur Izzati, Pakhor Anuar, et al.
Published: (2023)
by: Nur Izzati, Pakhor Anuar, et al.
Published: (2023)
Analysing the Optimum number of cupping points for selected diseases by utilising graph colouring
by: Nur Atikah, Aziz, et al.
Published: (2025)
by: Nur Atikah, Aziz, et al.
Published: (2025)
Analysing the optimum number of cupping points for selected diseases by utilising graph colouring
by: Aziz, Nur Atikah, et al.
Published: (2025)
by: Aziz, Nur Atikah, et al.
Published: (2025)
The academic library towards a wider-based utilisation
by: Agha, Syed Salim
Published: (1981)
by: Agha, Syed Salim
Published: (1981)
On the selection and installation of surge protection devices in a TT wiring system for equipment and human safety
by: Gomes, Chandima
Published: (2011)
by: Gomes, Chandima
Published: (2011)
The science of utilising space
by: Sen Sarma, Srimayee
Published: (2019)
by: Sen Sarma, Srimayee
Published: (2019)
COMPUTATIONAL MODELS FOR TIMETABLING PROBLEM
by: Aizam, N., et al.
Published: (2014)
by: Aizam, N., et al.
Published: (2014)
Joint Pricing and Production Planning of Multi-period Multi-product Systems with Uncertainty in Demand
by: Caccetta, Louis, et al.
Published: (2012)
by: Caccetta, Louis, et al.
Published: (2012)
Impact of Price-Adjustments Costs on Integration of Pricing and Production Planning of Multiple-Products
by: Mardaneh, Elham, et al.
Published: (2014)
by: Mardaneh, Elham, et al.
Published: (2014)
Similar Items
-
Single location equipment selection
by: Burt, C., et al.
Published: (2018) -
Multiple locations equipment selection
by: Burt, C., et al.
Published: (2018) -
Equipment selection for surface mining: a review
by: Burt, Christina, et al.
Published: (2014) -
Accurate costing of mining equipment
by: Burt, C., et al.
Published: (2018) -
Equipment selection with heterogeneous fleets for multiple-period schedules
by: Burt, Christina, et al.
Published: (2011)