Case studies

© 2018, Springer International Publishing AG. Our aim is to develop effective computational models for determining the optimal truck-loader selection and allocation strategy for use in large and complex mining operations. To achieve this it is important to have real case studies that reflect the tru...

Full description

Bibliographic Details
Main Authors: Burt, C., Caccetta, Louis
Format: Book Chapter
Published: 2018
Online Access:http://hdl.handle.net/20.500.11937/67558
_version_ 1848761596822683648
author Burt, C.
Caccetta, Louis
author_facet Burt, C.
Caccetta, Louis
author_sort Burt, C.
building Curtin Institutional Repository
collection Online Access
description © 2018, Springer International Publishing AG. Our aim is to develop effective computational models for determining the optimal truck-loader selection and allocation strategy for use in large and complex mining operations. To achieve this it is important to have real case studies that reflect the true nature of the problems to be addressed. In this chapter, we provide the data and background for two real case studies, one is a simple senario with one mining location and 9 periods each having a 1-year duration, the other is a more complex senario with multiple locations and 13 periods each having a 1-year duration. Our first case study, though small and simple has interesting variation in truck cycle times. It represents a mine in the planning stage with pre-existing equipment. Our second case study, is from an ongoing mining operation and has pre-existing equipment and includes stockpiles. This data was provided by an in-house equipment selection expert from an industry partner.
first_indexed 2025-11-14T10:34:11Z
format Book Chapter
id curtin-20.500.11937-67558
institution Curtin University Malaysia
institution_category Local University
last_indexed 2025-11-14T10:34:11Z
publishDate 2018
recordtype eprints
repository_type Digital Repository
spelling curtin-20.500.11937-675582018-05-18T08:05:21Z Case studies Burt, C. Caccetta, Louis © 2018, Springer International Publishing AG. Our aim is to develop effective computational models for determining the optimal truck-loader selection and allocation strategy for use in large and complex mining operations. To achieve this it is important to have real case studies that reflect the true nature of the problems to be addressed. In this chapter, we provide the data and background for two real case studies, one is a simple senario with one mining location and 9 periods each having a 1-year duration, the other is a more complex senario with multiple locations and 13 periods each having a 1-year duration. Our first case study, though small and simple has interesting variation in truck cycle times. It represents a mine in the planning stage with pre-existing equipment. Our second case study, is from an ongoing mining operation and has pre-existing equipment and includes stockpiles. This data was provided by an in-house equipment selection expert from an industry partner. 2018 Book Chapter http://hdl.handle.net/20.500.11937/67558 10.1007/978-3-319-76255-5_5 restricted
spellingShingle Burt, C.
Caccetta, Louis
Case studies
title Case studies
title_full Case studies
title_fullStr Case studies
title_full_unstemmed Case studies
title_short Case studies
title_sort case studies
url http://hdl.handle.net/20.500.11937/67558