Literature review
© 2018, Springer International Publishing AG. In this chapter, we present a detailed literature review of the equipment selection problem in surface mining as well as the closely related equipment selection problem in the construction industry. We review the modelling and solution methods that have...
| Main Authors: | , |
|---|---|
| Format: | Book Chapter |
| Published: |
2018
|
| Online Access: | http://hdl.handle.net/20.500.11937/67126 |
| _version_ | 1848761481987883008 |
|---|---|
| author | Burt, C. Caccetta, Louis |
| author_facet | Burt, C. Caccetta, Louis |
| author_sort | Burt, C. |
| building | Curtin Institutional Repository |
| collection | Online Access |
| description | © 2018, Springer International Publishing AG. In this chapter, we present a detailed literature review of the equipment selection problem in surface mining as well as the closely related equipment selection problem in the construction industry. We review the modelling and solution methods that have emerged in both the mining and operations research literature. We also consider a number of closely related problems such as shovel-truck productivity, mining method selection, scheduling, dispatching and allocation problems. Our review considers a broad range of modelling and solution approaches that can or have been used for these related problems. |
| first_indexed | 2025-11-14T10:32:22Z |
| format | Book Chapter |
| id | curtin-20.500.11937-67126 |
| institution | Curtin University Malaysia |
| institution_category | Local University |
| last_indexed | 2025-11-14T10:32:22Z |
| publishDate | 2018 |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | curtin-20.500.11937-671262019-03-28T05:18:52Z Literature review Burt, C. Caccetta, Louis © 2018, Springer International Publishing AG. In this chapter, we present a detailed literature review of the equipment selection problem in surface mining as well as the closely related equipment selection problem in the construction industry. We review the modelling and solution methods that have emerged in both the mining and operations research literature. We also consider a number of closely related problems such as shovel-truck productivity, mining method selection, scheduling, dispatching and allocation problems. Our review considers a broad range of modelling and solution approaches that can or have been used for these related problems. 2018 Book Chapter http://hdl.handle.net/20.500.11937/67126 10.1007/978-3-319-76255-5_3 restricted |
| spellingShingle | Burt, C. Caccetta, Louis Literature review |
| title | Literature review |
| title_full | Literature review |
| title_fullStr | Literature review |
| title_full_unstemmed | Literature review |
| title_short | Literature review |
| title_sort | literature review |
| url | http://hdl.handle.net/20.500.11937/67126 |