Strategic mine planning model using network flow model and real case application
Strategic mine planning is one of the key factors in the successful survival of large scale mining companies in the long term, and deals with billions of dollars in magnitude. It provides answers in regards to how much capital should be invested, in what resources and when, and finally what type of...
| Main Authors: | Topal, Erkan, Topal, E., Ramazan, S. |
|---|---|
| Format: | Journal Article |
| Published: |
Taylor & Francis
2012
|
| Online Access: | http://www.tandfonline.com/action/showAxaArticles?journalCode=nsme20 http://hdl.handle.net/20.500.11937/67071 |
Similar Items
A new MIP model for mine equipment scheduling by minimizing maintenance cost
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
Mining truck scheduling with stochastic maintenance cost
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
Optimising the long term mine landform progression and truck hour schedule in a large scale open pit mine using mixed integer programming
by: Li, Y., et al.
Published: (2018)
by: Li, Y., et al.
Published: (2018)
Optimising the long-term mine waste management and truck schedule in a largescale open pit mine
by: Li, Y., et al.
Published: (2016)
by: Li, Y., et al.
Published: (2016)
Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming
by: Li, Y, et al.
Published: (2014)
by: Li, Y, et al.
Published: (2014)
Evaluation of a mining project using Discounted Cash Flow analysis, Decision Tree analysis, Monte Carlo Simulation and Real Options using an example
by: Topal, Erkan
Published: (2008)
by: Topal, Erkan
Published: (2008)
Developments in Mine Design, Planning and Scheduling in Open Cut Mining
by: Saydam, S., et al.
Published: (2012)
by: Saydam, S., et al.
Published: (2012)
Application of predictive data mining to create mine plan flexibility in the face of geological uncertainty
by: Ajak, A., et al.
Published: (2017)
by: Ajak, A., et al.
Published: (2017)
Real option in action: An example of flexible decision making at a mine operational level
by: Ajak, A., et al.
Published: (2015)
by: Ajak, A., et al.
Published: (2015)
Strategies to assist in obtaining an optimal solution for an underground mine planning problem using Mixed Integer Programming
by: Little, J., et al.
Published: (2011)
by: Little, J., et al.
Published: (2011)
Real Option Identification Framework for Mine Operational Decision-Making
by: Ajak, A., et al.
Published: (2018)
by: Ajak, A., et al.
Published: (2018)
New approach for estimating total mining costs in surface coal mines
by: Shafiee, S., et al.
Published: (2012)
by: Shafiee, S., et al.
Published: (2012)
A review of soft computing technology applications in several mining problems
by: Jang, H., et al.
Published: (2014)
by: Jang, H., et al.
Published: (2014)
A numerical study for a mining project using real options valuation under commodity price uncertainty
by: Haque, M, et al.
Published: (2014)
by: Haque, M, et al.
Published: (2014)
Mining (Australia)
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
Net present value maximisation model for optimum cut-off grade policy of open pit mining operations
by: Asad, M., et al.
Published: (2011)
by: Asad, M., et al.
Published: (2011)
Evaluation of a mining project under the joint effect of commodity price and exchange rate uncertainties using real options valuation
by: Haque, Md Aminul, et al.
Published: (2016)
by: Haque, Md Aminul, et al.
Published: (2016)
A new open-pit mine planning optimization method using block aggregation and integer programming
by: Mai, N., et al.
Published: (2018)
by: Mai, N., et al.
Published: (2018)
Using Clustering Methods for Open Pit Mine Production Scheduling
by: Ren, H., et al.
Published: (2014)
by: Ren, H., et al.
Published: (2014)
A new generic open pit mine planning process with risk assessment ability
by: Mai, N., et al.
Published: (2016)
by: Mai, N., et al.
Published: (2016)
Estimation of Mining Project Values Through Real Option Valuation Using a Combination of Hedging Strategy and a Mean Reversion Commodity Price
by: Aminul Haque, M., et al.
Published: (2016)
by: Aminul Haque, M., et al.
Published: (2016)
Mine waste rock management
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
Energy consumption modeling using artificial neural networks: The case of the world’s highest consumers
by: Aydin, G, et al.
Published: (2016)
by: Aydin, G, et al.
Published: (2016)
Using Artificial Neural Networks (ANNs) to Predict Stope Overbreak at Plutonic Underground Gold Mine
by: Boxwell, D., et al.
Published: (2014)
by: Boxwell, D., et al.
Published: (2014)
An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
A new mathematical programming model for production schedule optimisation in underground mining operations
by: Nehring, M., et al.
Published: (2010)
by: Nehring, M., et al.
Published: (2010)
Flexible open-pit mine design under uncertainty
by: Groeneveld, Ben, et al.
Published: (2011)
by: Groeneveld, Ben, et al.
Published: (2011)
Transformation of the Australian mining industry and future prospects
by: Jang, Hyong Doo, et al.
Published: (2020)
by: Jang, Hyong Doo, et al.
Published: (2020)
A new methodology for flexible mine design
by: Groeneveld, B., et al.
Published: (2018)
by: Groeneveld, B., et al.
Published: (2018)
Integrated Optimization of Underground Mine Design and Scheduling
by: Little, J, et al.
Published: (2013)
by: Little, J, et al.
Published: (2013)
Unplanned dilution and ore loss prediction in longhole stoping mines via multiple regression and artificial neural network analyses
by: Jang, Hyong Doo, et al.
Published: (2015)
by: Jang, Hyong Doo, et al.
Published: (2015)
Robust versus Flexible Open Pit Mine Design
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
Mathematical approach for better mine waste rock dumping management
by: Li, Y., et al.
Published: (2012)
by: Li, Y., et al.
Published: (2012)
Robust, flexible and operational mine design strategies
by: Groeneveld, Benjamin James, et al.
Published: (2012)
by: Groeneveld, Benjamin James, et al.
Published: (2012)
Designing an optimal stope layout for underground mining based on a heuristic algorithm
by: Sandanayake, D., et al.
Published: (2015)
by: Sandanayake, D., et al.
Published: (2015)
Development of Novel Hybrid Intelligent Predictive Models for Dilution Prediction in Underground Sub-level Mining
by: Chimunhu, Prosper, et al.
Published: (2024)
by: Chimunhu, Prosper, et al.
Published: (2024)
Optimizing overbreak prediction based on geological parameters comparing multiple regression analysis and artificial neural network
by: Jang, Hyongdoo, et al.
Published: (2013)
by: Jang, Hyongdoo, et al.
Published: (2013)
Illumination of parameter contributions on uneven break phenomenon in underground stoping mines
by: Jang, Hyong Doo, et al.
Published: (2016)
by: Jang, Hyong Doo, et al.
Published: (2016)
A heuristic approach to optimal design of an underground mine stope layout
by: Sandanayake, D., et al.
Published: (2015)
by: Sandanayake, D., et al.
Published: (2015)
Implementing a New Heuristic Approach to the Underground Mine Stope Layout Problem
by: Sandanayake, D., et al.
Published: (2014)
by: Sandanayake, D., et al.
Published: (2014)
Similar Items
-
A new MIP model for mine equipment scheduling by minimizing maintenance cost
by: Topal, Erkan, et al.
Published: (2010) -
Mining truck scheduling with stochastic maintenance cost
by: Topal, Erkan, et al.
Published: (2012) -
Optimising the long term mine landform progression and truck hour schedule in a large scale open pit mine using mixed integer programming
by: Li, Y., et al.
Published: (2018) -
Optimising the long-term mine waste management and truck schedule in a largescale open pit mine
by: Li, Y., et al.
Published: (2016) -
Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming
by: Li, Y, et al.
Published: (2014)