Pilot Point Optimization of Mining Boundaries for Lateritic Metal Deposits: Finding the Trade-off Between Dilution and Ore Loss

Geological contacts in lateritic metal deposits (footwall topographies) often delineate the orebody boundaries. Spatial variations seen in such contacts are frequently higher than those for the metal grades of the deposit. Therefore, borehole spacing chosen based on the grade variations cannot adequ...

Full description

Bibliographic Details
Main Authors: Dagasan, Y., Renard, P., Straubhaar, J., Erten, Oktay, Topal, Erkan
Format: Journal Article
Published: Springer 2019
Online Access:http://hdl.handle.net/20.500.11937/66634
_version_ 1848761357641449472
author Dagasan, Y.
Renard, P.
Straubhaar, J.
Erten, Oktay
Topal, Erkan
author_facet Dagasan, Y.
Renard, P.
Straubhaar, J.
Erten, Oktay
Topal, Erkan
author_sort Dagasan, Y.
building Curtin Institutional Repository
collection Online Access
description Geological contacts in lateritic metal deposits (footwall topographies) often delineate the orebody boundaries. Spatial variations seen in such contacts are frequently higher than those for the metal grades of the deposit. Therefore, borehole spacing chosen based on the grade variations cannot adequately capture the geological contact variability. Consequently, models created using such boreholes cause high volumetric uncertainties in the actual and targeted ore extraction volumes, which, in turn, lead to high unplanned dilution and ore losses. In this paper, a method to design optimum ore/mining boundaries for lateritic metal deposits is presented. The proposed approach minimizes the dilution/ore losses and comprises two main steps. First, the uncertainty on the orebody boundary is represented using a set of stochastic realizations generated with a multiple-point statistics algorithm. Then, the optimal orebody boundary is determined using an optimization technique inspired by a model calibration method called Pilot Points. The pilot points represent synthetic elevation values, and they are used to construct smooth mining boundaries using the multilevel B-spline technique. The performance of a generated surface is evaluated using the expected sum of losses in each of the stochastic realizations. The simulated annealing algorithm is used to iteratively determine the pilot point values which minimize the expected losses. The results show a significant reduction in the dilution volume as compared to those obtained from the actual mining operation.
first_indexed 2025-11-14T10:30:23Z
format Journal Article
id curtin-20.500.11937-66634
institution Curtin University Malaysia
institution_category Local University
last_indexed 2025-11-14T10:30:23Z
publishDate 2019
publisher Springer
recordtype eprints
repository_type Digital Repository
spelling curtin-20.500.11937-666342019-04-29T23:56:13Z Pilot Point Optimization of Mining Boundaries for Lateritic Metal Deposits: Finding the Trade-off Between Dilution and Ore Loss Dagasan, Y. Renard, P. Straubhaar, J. Erten, Oktay Topal, Erkan Geological contacts in lateritic metal deposits (footwall topographies) often delineate the orebody boundaries. Spatial variations seen in such contacts are frequently higher than those for the metal grades of the deposit. Therefore, borehole spacing chosen based on the grade variations cannot adequately capture the geological contact variability. Consequently, models created using such boreholes cause high volumetric uncertainties in the actual and targeted ore extraction volumes, which, in turn, lead to high unplanned dilution and ore losses. In this paper, a method to design optimum ore/mining boundaries for lateritic metal deposits is presented. The proposed approach minimizes the dilution/ore losses and comprises two main steps. First, the uncertainty on the orebody boundary is represented using a set of stochastic realizations generated with a multiple-point statistics algorithm. Then, the optimal orebody boundary is determined using an optimization technique inspired by a model calibration method called Pilot Points. The pilot points represent synthetic elevation values, and they are used to construct smooth mining boundaries using the multilevel B-spline technique. The performance of a generated surface is evaluated using the expected sum of losses in each of the stochastic realizations. The simulated annealing algorithm is used to iteratively determine the pilot point values which minimize the expected losses. The results show a significant reduction in the dilution volume as compared to those obtained from the actual mining operation. 2019 Journal Article http://hdl.handle.net/20.500.11937/66634 10.1007/s11053-018-9380-9 Springer fulltext
spellingShingle Dagasan, Y.
Renard, P.
Straubhaar, J.
Erten, Oktay
Topal, Erkan
Pilot Point Optimization of Mining Boundaries for Lateritic Metal Deposits: Finding the Trade-off Between Dilution and Ore Loss
title Pilot Point Optimization of Mining Boundaries for Lateritic Metal Deposits: Finding the Trade-off Between Dilution and Ore Loss
title_full Pilot Point Optimization of Mining Boundaries for Lateritic Metal Deposits: Finding the Trade-off Between Dilution and Ore Loss
title_fullStr Pilot Point Optimization of Mining Boundaries for Lateritic Metal Deposits: Finding the Trade-off Between Dilution and Ore Loss
title_full_unstemmed Pilot Point Optimization of Mining Boundaries for Lateritic Metal Deposits: Finding the Trade-off Between Dilution and Ore Loss
title_short Pilot Point Optimization of Mining Boundaries for Lateritic Metal Deposits: Finding the Trade-off Between Dilution and Ore Loss
title_sort pilot point optimization of mining boundaries for lateritic metal deposits: finding the trade-off between dilution and ore loss
url http://hdl.handle.net/20.500.11937/66634