A new methodology for flexible mine design
© The Australasian Institute of Mining and Metallurgy 2018. All rights are reserved. Uncertainty and risk are invariably embedded in every mining project. Mining companies endeavouring to maximise their return for shareholders make important strategic decisions which take years or even decades to ...
| Main Authors: | Groeneveld, B., Topal, Erkan, Leenders, B. |
|---|---|
| Format: | Book Chapter |
| Published: |
2018
|
| Online Access: | http://hdl.handle.net/20.500.11937/66561 |
Similar Items
Robust versus Flexible Open Pit Mine Design
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
Robust, flexible and operational mine design strategies
by: Groeneveld, Benjamin James, et al.
Published: (2012)
by: Groeneveld, Benjamin James, et al.
Published: (2012)
Flexible open-pit mine design under uncertainty
by: Groeneveld, Ben, et al.
Published: (2011)
by: Groeneveld, Ben, et al.
Published: (2011)
Evaluating Flexible Mine Design under Uncertainty
by: Groeneveld, Benjamin James
Published: (2017)
by: Groeneveld, Benjamin James
Published: (2017)
Real option in action: An example of flexible decision making at a mine operational level
by: Ajak, A., et al.
Published: (2015)
by: Ajak, A., et al.
Published: (2015)
Application of predictive data mining to create mine plan flexibility in the face of geological uncertainty
by: Ajak, A., et al.
Published: (2017)
by: Ajak, A., et al.
Published: (2017)
New approach for estimating total mining costs in surface coal mines
by: Shafiee, S., et al.
Published: (2012)
by: Shafiee, S., et al.
Published: (2012)
Developments in Mine Design, Planning and Scheduling in Open Cut Mining
by: Saydam, S., et al.
Published: (2012)
by: Saydam, S., et al.
Published: (2012)
A new MIP model for mine equipment scheduling by minimizing maintenance cost
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
Integrated Optimization of Underground Mine Design and Scheduling
by: Little, J, et al.
Published: (2013)
by: Little, J, et al.
Published: (2013)
Mining (Australia)
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
A new generic open pit mine planning process with risk assessment ability
by: Mai, N., et al.
Published: (2016)
by: Mai, N., et al.
Published: (2016)
A new mathematical programming model for production schedule optimisation in underground mining operations
by: Nehring, M., et al.
Published: (2010)
by: Nehring, M., et al.
Published: (2010)
Mining truck scheduling with stochastic maintenance cost
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
Designing an optimal stope layout for underground mining based on a heuristic algorithm
by: Sandanayake, D., et al.
Published: (2015)
by: Sandanayake, D., et al.
Published: (2015)
Mine waste rock management
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
Implementing a New Heuristic Approach to the Underground Mine Stope Layout Problem
by: Sandanayake, D., et al.
Published: (2014)
by: Sandanayake, D., et al.
Published: (2014)
A heuristic approach to optimal design of an underground mine stope layout
by: Sandanayake, D., et al.
Published: (2015)
by: Sandanayake, D., et al.
Published: (2015)
A new open-pit mine planning optimization method using block aggregation and integer programming
by: Mai, N., et al.
Published: (2018)
by: Mai, N., et al.
Published: (2018)
Optimising the long-term mine waste management and truck schedule in a largescale open pit mine
by: Li, Y., et al.
Published: (2016)
by: Li, Y., et al.
Published: (2016)
The future of underground mine planning in the era of machine learning: Opportunities for engineering robustness and flexibility
by: Chimunhu, Prosper, et al.
Published: (2024)
by: Chimunhu, Prosper, et al.
Published: (2024)
A review of soft computing technology applications in several mining problems
by: Jang, H., et al.
Published: (2014)
by: Jang, H., et al.
Published: (2014)
Evaluation of a mining project using Discounted Cash Flow analysis, Decision Tree analysis, Monte Carlo Simulation and Real Options using an example
by: Topal, Erkan
Published: (2008)
by: Topal, Erkan
Published: (2008)
Using Clustering Methods for Open Pit Mine Production Scheduling
by: Ren, H., et al.
Published: (2014)
by: Ren, H., et al.
Published: (2014)
Transformation of the Australian mining industry and future prospects
by: Jang, Hyong Doo, et al.
Published: (2020)
by: Jang, Hyong Doo, et al.
Published: (2020)
Optimising the long term mine landform progression and truck hour schedule in a large scale open pit mine using mixed integer programming
by: Li, Y., et al.
Published: (2018)
by: Li, Y., et al.
Published: (2018)
Strategic mine planning model using network flow model and real case application
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming
by: Li, Y, et al.
Published: (2014)
by: Li, Y, et al.
Published: (2014)
Strategies to assist in obtaining an optimal solution for an underground mine planning problem using Mixed Integer Programming
by: Little, J., et al.
Published: (2011)
by: Little, J., et al.
Published: (2011)
Net present value maximisation model for optimum cut-off grade policy of open pit mining operations
by: Asad, M., et al.
Published: (2011)
by: Asad, M., et al.
Published: (2011)
Real Option Identification Framework for Mine Operational Decision-Making
by: Ajak, A., et al.
Published: (2018)
by: Ajak, A., et al.
Published: (2018)
Mathematical approach for better mine waste rock dumping management
by: Li, Y., et al.
Published: (2012)
by: Li, Y., et al.
Published: (2012)
A new algorithm for stope boundary optimization
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
A numerical study for a mining project using real options valuation under commodity price uncertainty
by: Haque, M, et al.
Published: (2014)
by: Haque, M, et al.
Published: (2014)
Illumination of parameter contributions on uneven break phenomenon in underground stoping mines
by: Jang, Hyong Doo, et al.
Published: (2016)
by: Jang, Hyong Doo, et al.
Published: (2016)
Using Artificial Neural Networks (ANNs) to Predict Stope Overbreak at Plutonic Underground Gold Mine
by: Boxwell, D., et al.
Published: (2014)
by: Boxwell, D., et al.
Published: (2014)
Determination of the transition Point from Open Pit to Underground Mining
by: Chung, J., et al.
Published: (2016)
by: Chung, J., et al.
Published: (2016)
Integrated short and medium term underground mine production scheduling
by: Nehring, M., et al.
Published: (2012)
by: Nehring, M., et al.
Published: (2012)
Implementation and comparison of four stope boundary optimization algorithms in an existing underground mine
by: Erdogan, G., et al.
Published: (2017)
by: Erdogan, G., et al.
Published: (2017)
Illumination of contributing parameters of uneven break in narrow vein mine
by: Jang, Hyong Doo, et al.
Published: (2019)
by: Jang, Hyong Doo, et al.
Published: (2019)
Similar Items
-
Robust versus Flexible Open Pit Mine Design
by: Topal, Erkan, et al.
Published: (2010) -
Robust, flexible and operational mine design strategies
by: Groeneveld, Benjamin James, et al.
Published: (2012) -
Flexible open-pit mine design under uncertainty
by: Groeneveld, Ben, et al.
Published: (2011) -
Evaluating Flexible Mine Design under Uncertainty
by: Groeneveld, Benjamin James
Published: (2017) -
Real option in action: An example of flexible decision making at a mine operational level
by: Ajak, A., et al.
Published: (2015)