Reduce rework, improve safety: an empirical inquiry into the precursors to error in construction

A positive association between rework and safety events that arise during the construction process has been identified. In-depth semi-structured interviews with operational and project-related employees from an Australian construction organisation were undertaken to determine the precursors to rewor...

Full description

Bibliographic Details
Main Authors: Love, Peter, Teo, Pauline, Ackermann, Fran, Smith, J., Alexander, James, Palaneeswaran, E., Morrison, J.
Format: Journal Article
Published: Taylor & Francis 2018
Online Access:http://purl.org/au-research/grants/arc/DP130103018
http://hdl.handle.net/20.500.11937/65838
_version_ 1848761215538429952
author Love, Peter
Teo, Pauline
Ackermann, Fran
Smith, J.
Alexander, James
Palaneeswaran, E.
Morrison, J.
author_facet Love, Peter
Teo, Pauline
Ackermann, Fran
Smith, J.
Alexander, James
Palaneeswaran, E.
Morrison, J.
author_sort Love, Peter
building Curtin Institutional Repository
collection Online Access
description A positive association between rework and safety events that arise during the construction process has been identified. In-depth semi-structured interviews with operational and project-related employees from an Australian construction organisation were undertaken to determine the precursors to rework and safety events. The analysis enabled the precursors of error to examined under the auspices of: (1) People, (2) Organisation, and (3) Project. It is revealed that the precursors to error for rework and safety incidents were similar. A conceptual framework to simultaneously reduce rework and safety incidents is proposed. It is acknowledged that there is no panacea that can be used to prevent rework from occurring, but from the findings presented indicate that a shift from a position of ‘preventing’ to ‘managing’ errors is required to enable learning to become an embedded feature of an organisation’s culture. As a consequence, this will contribute to productivity and performance improvements being realised.
first_indexed 2025-11-14T10:28:08Z
format Journal Article
id curtin-20.500.11937-65838
institution Curtin University Malaysia
institution_category Local University
last_indexed 2025-11-14T10:28:08Z
publishDate 2018
publisher Taylor & Francis
recordtype eprints
repository_type Digital Repository
spelling curtin-20.500.11937-658382023-06-07T05:20:35Z Reduce rework, improve safety: an empirical inquiry into the precursors to error in construction Love, Peter Teo, Pauline Ackermann, Fran Smith, J. Alexander, James Palaneeswaran, E. Morrison, J. A positive association between rework and safety events that arise during the construction process has been identified. In-depth semi-structured interviews with operational and project-related employees from an Australian construction organisation were undertaken to determine the precursors to rework and safety events. The analysis enabled the precursors of error to examined under the auspices of: (1) People, (2) Organisation, and (3) Project. It is revealed that the precursors to error for rework and safety incidents were similar. A conceptual framework to simultaneously reduce rework and safety incidents is proposed. It is acknowledged that there is no panacea that can be used to prevent rework from occurring, but from the findings presented indicate that a shift from a position of ‘preventing’ to ‘managing’ errors is required to enable learning to become an embedded feature of an organisation’s culture. As a consequence, this will contribute to productivity and performance improvements being realised. 2018 Journal Article http://hdl.handle.net/20.500.11937/65838 10.1080/09537287.2018.1424961 http://purl.org/au-research/grants/arc/DP130103018 Taylor & Francis fulltext
spellingShingle Love, Peter
Teo, Pauline
Ackermann, Fran
Smith, J.
Alexander, James
Palaneeswaran, E.
Morrison, J.
Reduce rework, improve safety: an empirical inquiry into the precursors to error in construction
title Reduce rework, improve safety: an empirical inquiry into the precursors to error in construction
title_full Reduce rework, improve safety: an empirical inquiry into the precursors to error in construction
title_fullStr Reduce rework, improve safety: an empirical inquiry into the precursors to error in construction
title_full_unstemmed Reduce rework, improve safety: an empirical inquiry into the precursors to error in construction
title_short Reduce rework, improve safety: an empirical inquiry into the precursors to error in construction
title_sort reduce rework, improve safety: an empirical inquiry into the precursors to error in construction
url http://purl.org/au-research/grants/arc/DP130103018
http://hdl.handle.net/20.500.11937/65838