Dynamic study of a battery change-over scheme of a windfarm containing dual BESS

The wind farm-dual-battery energy storage systems (BESS) described in [1] is studied in greater detail for those instances when the battery banks change-over. The primary design objective of the wind farm-BESS scheme is to realize the dispatchability of wind generation. The scheme requires two BESS...

Full description

Bibliographic Details
Main Authors: Yao, D., Choi, San Shing, Tseng, K., Lie, T.
Format: Conference Paper
Published: 2012
Online Access:http://hdl.handle.net/20.500.11937/65756
_version_ 1848761196668256256
author Yao, D.
Choi, San Shing
Tseng, K.
Lie, T.
author_facet Yao, D.
Choi, San Shing
Tseng, K.
Lie, T.
author_sort Yao, D.
building Curtin Institutional Repository
collection Online Access
description The wind farm-dual-battery energy storage systems (BESS) described in [1] is studied in greater detail for those instances when the battery banks change-over. The primary design objective of the wind farm-BESS scheme is to realize the dispatchability of wind generation. The scheme requires two BESS modules to inter-change between charging-discharging modes. A new power flows control strategy is designed to cater for the battery switching-over operation while practical constraints on the charging-discharging of the BESS are considered. A dynamic study is included to illustrate the strategy. © 2012 IEEE.
first_indexed 2025-11-14T10:27:50Z
format Conference Paper
id curtin-20.500.11937-65756
institution Curtin University Malaysia
institution_category Local University
last_indexed 2025-11-14T10:27:50Z
publishDate 2012
recordtype eprints
repository_type Digital Repository
spelling curtin-20.500.11937-657562018-02-19T08:06:07Z Dynamic study of a battery change-over scheme of a windfarm containing dual BESS Yao, D. Choi, San Shing Tseng, K. Lie, T. The wind farm-dual-battery energy storage systems (BESS) described in [1] is studied in greater detail for those instances when the battery banks change-over. The primary design objective of the wind farm-BESS scheme is to realize the dispatchability of wind generation. The scheme requires two BESS modules to inter-change between charging-discharging modes. A new power flows control strategy is designed to cater for the battery switching-over operation while practical constraints on the charging-discharging of the BESS are considered. A dynamic study is included to illustrate the strategy. © 2012 IEEE. 2012 Conference Paper http://hdl.handle.net/20.500.11937/65756 10.1109/ASSCC.2012.6523268 restricted
spellingShingle Yao, D.
Choi, San Shing
Tseng, K.
Lie, T.
Dynamic study of a battery change-over scheme of a windfarm containing dual BESS
title Dynamic study of a battery change-over scheme of a windfarm containing dual BESS
title_full Dynamic study of a battery change-over scheme of a windfarm containing dual BESS
title_fullStr Dynamic study of a battery change-over scheme of a windfarm containing dual BESS
title_full_unstemmed Dynamic study of a battery change-over scheme of a windfarm containing dual BESS
title_short Dynamic study of a battery change-over scheme of a windfarm containing dual BESS
title_sort dynamic study of a battery change-over scheme of a windfarm containing dual bess
url http://hdl.handle.net/20.500.11937/65756