Topal, E., & Ramazan, S. (2010). A new MIP model for mine equipment scheduling by minimizing maintenance cost. Elsevier BV.
Chicago Style (17th ed.) CitationTopal, Erkan, and S. Ramazan. A New MIP Model for Mine Equipment Scheduling by Minimizing Maintenance Cost. Elsevier BV, 2010.
MLA (9th ed.) CitationTopal, Erkan, and S. Ramazan. A New MIP Model for Mine Equipment Scheduling by Minimizing Maintenance Cost. Elsevier BV, 2010.
Warning: These citations may not always be 100% accurate.