Implementation and comparison of four stope boundary optimization algorithms in an existing underground mine
Deeper deposits become the future of mining as an increasing amount of shallow deposits are exploited. Consequently, the mining industry is being forced to extract minerals from deeper deposits using underground mining methods. This increased the demand for underground mine planning and optimization...
| Main Authors: | Erdogan, G., Cigla, M., Topal, Erkan, Yavuz, M. |
|---|---|
| Format: | Journal Article |
| Published: |
Taylor & Francis
2017
|
| Online Access: | http://hdl.handle.net/20.500.11937/54570 |
Similar Items
Designing an optimal stope layout for underground mining based on a heuristic algorithm
by: Sandanayake, D., et al.
Published: (2015)
by: Sandanayake, D., et al.
Published: (2015)
Implementing a New Heuristic Approach to the Underground Mine Stope Layout Problem
by: Sandanayake, D., et al.
Published: (2014)
by: Sandanayake, D., et al.
Published: (2014)
A new algorithm for stope boundary optimization
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
A heuristic approach to optimal design of an underground mine stope layout
by: Sandanayake, D., et al.
Published: (2015)
by: Sandanayake, D., et al.
Published: (2015)
Illumination of parameter contributions on uneven break phenomenon in underground stoping mines
by: Jang, Hyong Doo, et al.
Published: (2016)
by: Jang, Hyong Doo, et al.
Published: (2016)
Stope boundary optimisation in underground mining based on a heuristic approachStope boundary optimisation in underground mining based on a heuristic approach
by: Sandanayake, Don Suneth Sameera
Published: (2014)
by: Sandanayake, Don Suneth Sameera
Published: (2014)
Using Artificial Neural Networks (ANNs) to Predict Stope Overbreak at Plutonic Underground Gold Mine
by: Boxwell, D., et al.
Published: (2014)
by: Boxwell, D., et al.
Published: (2014)
Dilution prediction in underground open stope mining using gene expression programming and backpropagation artificial neural network algorithms
by: Chimunhu, Prosper, et al.
Published: (2025)
by: Chimunhu, Prosper, et al.
Published: (2025)
Simultaneous optimisation of stope boundaries and long term production scheduling for production shedules
by: Little, J., et al.
Published: (2011)
by: Little, J., et al.
Published: (2011)
Predicting overbreak and underbreak in underground longhole stoping using meta-soft computing models
by: Taheri, Sina, et al.
Published: (2025)
by: Taheri, Sina, et al.
Published: (2025)
Decision support system of unplanned dilution and ore-loss in underground stoping operations using a neuro-fuzzy system
by: Jang, Hyong Doo, et al.
Published: (2015)
by: Jang, Hyong Doo, et al.
Published: (2015)
Integrated Optimization of Underground Mine Design and Scheduling
by: Little, J, et al.
Published: (2013)
by: Little, J, et al.
Published: (2013)
Integrated short and medium term underground mine production scheduling
by: Nehring, M., et al.
Published: (2012)
by: Nehring, M., et al.
Published: (2012)
Unplanned dilution and ore loss prediction in longhole stoping mines via multiple regression and artificial neural network analyses
by: Jang, Hyong Doo, et al.
Published: (2015)
by: Jang, Hyong Doo, et al.
Published: (2015)
Strategies to assist in obtaining an optimal solution for an underground mine planning problem using Mixed Integer Programming
by: Little, J., et al.
Published: (2011)
by: Little, J., et al.
Published: (2011)
A new mathematical programming model for production schedule optimisation in underground mining operations
by: Nehring, M., et al.
Published: (2010)
by: Nehring, M., et al.
Published: (2010)
Determination of the transition Point from Open Pit to Underground Mining
by: Chung, J., et al.
Published: (2016)
by: Chung, J., et al.
Published: (2016)
A Case Study of Prediction and Analysis of Unplanned Dilution in an Underground Stoping Mine using Artificial Neural Network
by: Jang, Hyong Doo, et al.
Published: (2014)
by: Jang, Hyong Doo, et al.
Published: (2014)
An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
An integrated approach to span design in open stope mining
by: Cepuritis, Peter M.
Published: (2010)
by: Cepuritis, Peter M.
Published: (2010)
Underground Blasting Optimization by Artificial Intelligence Techniques
by: Jang, Hyong Doo, et al.
Published: (2013)
by: Jang, Hyong Doo, et al.
Published: (2013)
Implementation of the participative ergonomics for manual tasks (PErforM) programme at four Australian underground coal mines
by: Burgess-limerick, R., et al.
Published: (2007)
by: Burgess-limerick, R., et al.
Published: (2007)
Development of Novel Hybrid Intelligent Predictive Models for Dilution Prediction in Underground Sub-level Mining
by: Chimunhu, Prosper, et al.
Published: (2024)
by: Chimunhu, Prosper, et al.
Published: (2024)
Research into stope roof control of compound roof by solid backfilling mining
by: Gao, R., et al.
Published: (2015)
by: Gao, R., et al.
Published: (2015)
The future of underground mine planning in the era of machine learning: Opportunities for engineering robustness and flexibility
by: Chimunhu, Prosper, et al.
Published: (2024)
by: Chimunhu, Prosper, et al.
Published: (2024)
Developments in Mine Design, Planning and Scheduling in Open Cut Mining
by: Saydam, S., et al.
Published: (2012)
by: Saydam, S., et al.
Published: (2012)
New approach for estimating total mining costs in surface coal mines
by: Shafiee, S., et al.
Published: (2012)
by: Shafiee, S., et al.
Published: (2012)
Mining (Australia)
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
Mining truck scheduling with stochastic maintenance cost
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
Pilot Point Optimization of Mining Boundaries for Lateritic Metal Deposits: Finding the Trade-off Between Dilution and Ore Loss
by: Dagasan, Y., et al.
Published: (2019)
by: Dagasan, Y., et al.
Published: (2019)
Mine waste rock management
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
Underground mining and water management
by: Moran, Chris, et al.
Published: (2011)
by: Moran, Chris, et al.
Published: (2011)
Back analysis of seismicity from development to open stope extraction at a deep mining operation
by: Bustos Salgado, Nadia, et al.
Published: (2023)
by: Bustos Salgado, Nadia, et al.
Published: (2023)
A new MIP model for mine equipment scheduling by minimizing maintenance cost
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
Transition from open-pit to underground – using Integer Programming considering grade uncertainty
by: Chung, Joyce Sze Yee, et al.
Published: (2015)
by: Chung, Joyce Sze Yee, et al.
Published: (2015)
Flexible open-pit mine design under uncertainty
by: Groeneveld, Ben, et al.
Published: (2011)
by: Groeneveld, Ben, et al.
Published: (2011)
Optimising the long-term mine waste management and truck schedule in a largescale open pit mine
by: Li, Y., et al.
Published: (2016)
by: Li, Y., et al.
Published: (2016)
The existence of solutions for four-point coupled boundary value problems of fractional differential equations at resonance
by: Zou, Y., et al.
Published: (2014)
by: Zou, Y., et al.
Published: (2014)
Net present value maximisation model for optimum cut-off grade policy of open pit mining operations
by: Asad, M., et al.
Published: (2011)
by: Asad, M., et al.
Published: (2011)
Using Clustering Methods for Open Pit Mine Production Scheduling
by: Ren, H., et al.
Published: (2014)
by: Ren, H., et al.
Published: (2014)
Similar Items
-
Designing an optimal stope layout for underground mining based on a heuristic algorithm
by: Sandanayake, D., et al.
Published: (2015) -
Implementing a New Heuristic Approach to the Underground Mine Stope Layout Problem
by: Sandanayake, D., et al.
Published: (2014) -
A new algorithm for stope boundary optimization
by: Topal, Erkan, et al.
Published: (2010) -
A heuristic approach to optimal design of an underground mine stope layout
by: Sandanayake, D., et al.
Published: (2015) -
Illumination of parameter contributions on uneven break phenomenon in underground stoping mines
by: Jang, Hyong Doo, et al.
Published: (2016)