A heuristic approach to long-range production planning of cement quarry operations
Cement manufacturing requires sustained supply of raw materials from limestone quarry. Raw materials inventory in limestone quarry is identified as a block model, usually, consisting of thousands of blocks. Each block consists of a distinct amount of chemical constituents which are vital for cement...
| Main Author: | Asad, Mohammad Waqar |
|---|---|
| Format: | Journal Article |
| Published: |
Taylor & Francis
2011
|
| Online Access: | http://hdl.handle.net/20.500.11937/53904 |
Similar Items
Optimal production scale of open pit mining operations with uncertain metal supply and long-term stockpiles
by: Asad, Mohammad Waqar, et al.
Published: (2012)
by: Asad, Mohammad Waqar, et al.
Published: (2012)
A heuristic approach to optimal design of an underground mine stope layout
by: Sandanayake, D., et al.
Published: (2015)
by: Sandanayake, D., et al.
Published: (2015)
Implementing a New Heuristic Approach to the Underground Mine Stope Layout Problem
by: Sandanayake, D., et al.
Published: (2014)
by: Sandanayake, D., et al.
Published: (2014)
A heuristic approach to stochastic cutoff grade optimization for open pit mining complexes with multiple processing streams
by: Asad, Mohammad Waqar, et al.
Published: (2013)
by: Asad, Mohammad Waqar, et al.
Published: (2013)
Mechanical properties of cement brick using quarry dust as partial sand replacement
by: Muhammad Azfar, Bahaudin
Published: (2017)
by: Muhammad Azfar, Bahaudin
Published: (2017)
Improvement of facilities layout planning related with safety: a case study at quarry
by: Tajurahim, Nurul Ainina Nadhirah, et al.
Published: (2021)
by: Tajurahim, Nurul Ainina Nadhirah, et al.
Published: (2021)
Improvement of facilities layout planning related with safety: a case study at quarry
by: Tajurahim, Nurul Ainina Nadhirah, et al.
Published: (2022)
by: Tajurahim, Nurul Ainina Nadhirah, et al.
Published: (2022)
Rock Slope Stability Analysis Using Photogrammetric Method At Hume Cement Quarry, Gopeng, Perak
by: Juhari, Aisyah Shahirah
Published: (2018)
by: Juhari, Aisyah Shahirah
Published: (2018)
The Used Of UAV-Based Photogrammetry For Discontinuity Mapping At Hume Cement Quarry, Malim Nawar Perak
by: Yaacob, Solihin
Published: (2018)
by: Yaacob, Solihin
Published: (2018)
Hyper-heuristic approaches to automatically designing heuristics as mutation operators for evolutionary programming on function classes
by: Hong, Libin
Published: (2018)
by: Hong, Libin
Published: (2018)
Planning and scheduling operating rooms with mix integer programming and meta-heuristic method
by: Askarizadeh, Mehdi, et al.
Published: (2018)
by: Askarizadeh, Mehdi, et al.
Published: (2018)
Operating rooms planning and scheduling with mix integer programming and meta-heuristic method
by: Askarizadeh, Mehdi, et al.
Published: (2017)
by: Askarizadeh, Mehdi, et al.
Published: (2017)
A hyper-heuristic approach to automated generation of mutation operators for evolutionary programming
by: Hong, Libin, et al.
Published: (2017)
by: Hong, Libin, et al.
Published: (2017)
The management and valuation of quarries / Radiah Mustaffa
by: Mustaffa, Radiah
Published: (1987)
by: Mustaffa, Radiah
Published: (1987)
Gladstone Nigeria Limited. Business Plan For Investment in A Granite Quarry at Okene in Kogi State Nigeria.
by: Nkechika, Augustus
Published: (2015)
by: Nkechika, Augustus
Published: (2015)
A method for optimal cut-off grade policy in open pit mining operations under uncertain supply
by: Khan, A., et al.
Published: (2019)
by: Khan, A., et al.
Published: (2019)
Design And Development Of A Long Range Glider
by: Ujang, Nor Faridah Hanim Aziz
Published: (2017)
by: Ujang, Nor Faridah Hanim Aziz
Published: (2017)
A mathematical programming model for optimal cut-off grade policy in open pit mining operations with multiple processing streams
by: Khan, A., et al.
Published: (2018)
by: Khan, A., et al.
Published: (2018)
Nonlinear dynamics of heated falling films under the influence of long-range Van Der Walls intermolecular force interactions
by: Jameel, Ahmad Tariq, et al.
Published: (2018)
by: Jameel, Ahmad Tariq, et al.
Published: (2018)
Heuristics approaches for three-dimensional strip packing and multiple carrier transportation plans
by: Duong, Thai Ha
Published: (2015)
by: Duong, Thai Ha
Published: (2015)
Legislative analysis on quarry rehabilitation in Selangor, Malaysia
by: Yahya, Zaharah, et al.
Published: (2018)
by: Yahya, Zaharah, et al.
Published: (2018)
Hybrid heuristic for multi-carrier transportation plans
by: Landa-Silva, Dario, et al.
Published: (2011)
by: Landa-Silva, Dario, et al.
Published: (2011)
Improved dust dispersion modelling for surface quarries: an optimized RANS k − ε approach
by: Joseph, Genora M.D.
Published: (2016)
by: Joseph, Genora M.D.
Published: (2016)
Heuristic Based Planning Approach For
Improving Wireless Network Coverage Of Multi-Storey Building
by: Yeong, Shoa Yei
Published: (2011)
by: Yeong, Shoa Yei
Published: (2011)
Long range channel characteristics through foliage
by: Masadan, Nurul Afifah, et al.
Published: (2019)
by: Masadan, Nurul Afifah, et al.
Published: (2019)
Evaluation of long range GNSS ambiguity resolution
by: Teunissen, Peter, et al.
Published: (2000)
by: Teunissen, Peter, et al.
Published: (2000)
An Approach for Instantaneous Ambiguity Resolution for Medium- to Long-range Multiple Reference Station Networks
by: Hu, Guorong, et al.
Published: (2004)
by: Hu, Guorong, et al.
Published: (2004)
Heuristic approaches to urban livability
by: Wyatt, Ray
Published: (2009)
by: Wyatt, Ray
Published: (2009)
Use of quarry rock dust as a fine aggregate in concrete
by: Wellala, Dammika P.K.
Published: (2017)
by: Wellala, Dammika P.K.
Published: (2017)
Environmental impact on residents’ well-being in the vicinity of quarrying
by: Wan Hasmirah Wan Ibrahim,, et al.
Published: (2019)
by: Wan Hasmirah Wan Ibrahim,, et al.
Published: (2019)
The durability study of quarry dust as sand replacement in concrete
by: Teo, Lek Kuan
Published: (2017)
by: Teo, Lek Kuan
Published: (2017)
Implementation of rules regarding quarry rehabilitation in Selangor, Malaysia
by: Yahya @ Yahaya, Zaharah
Published: (2018)
by: Yahya @ Yahaya, Zaharah
Published: (2018)
Meteorological Factor Using Statistical Analysis At Quarry Site
by: Shariff, Fatin Asyhikin Mohd
Published: (2017)
by: Shariff, Fatin Asyhikin Mohd
Published: (2017)
Hybrid Graph Heuristics within a Hyper-heuristic Approach to Exam Timetabling Problems
by: Burke, Edmund, et al.
Published: (2005)
by: Burke, Edmund, et al.
Published: (2005)
Performance evaluation of a new stochastic network flow approach to optimal open pit mine design - application at a gold mine
by: Asad, Mohammad Waqar, et al.
Published: (2012)
by: Asad, Mohammad Waqar, et al.
Published: (2012)
Russia’s Long-Range Aviation: An Airborne Spear of the Nation
by: Muraviev, Alexey
Published: (2010)
by: Muraviev, Alexey
Published: (2010)
Hybrid meta-heuristic algorithm for solving multi-objective aggregate production planning in fuzzy environment
by: Kalaf, Kalaf, Bayda Atiya
Published: (2017)
by: Kalaf, Kalaf, Bayda Atiya
Published: (2017)
Designing an optimal stope layout for underground mining based on a heuristic algorithm
by: Sandanayake, D., et al.
Published: (2015)
by: Sandanayake, D., et al.
Published: (2015)
A genetic programming hyper-heuristic approach for evolving 2-D strip packing heuristics
by: Burke, Edmund K., et al.
Published: (2010)
by: Burke, Edmund K., et al.
Published: (2010)
Meta-heuristic approaches for reservoir optimisation operation and investigation of climate change impact at Klang gate dam
by: Lai, Vivien Mei Yen
Published: (2023)
by: Lai, Vivien Mei Yen
Published: (2023)
Similar Items
-
Optimal production scale of open pit mining operations with uncertain metal supply and long-term stockpiles
by: Asad, Mohammad Waqar, et al.
Published: (2012) -
A heuristic approach to optimal design of an underground mine stope layout
by: Sandanayake, D., et al.
Published: (2015) -
Implementing a New Heuristic Approach to the Underground Mine Stope Layout Problem
by: Sandanayake, D., et al.
Published: (2014) -
A heuristic approach to stochastic cutoff grade optimization for open pit mining complexes with multiple processing streams
by: Asad, Mohammad Waqar, et al.
Published: (2013) -
Mechanical properties of cement brick using quarry dust as partial sand replacement
by: Muhammad Azfar, Bahaudin
Published: (2017)