A study of the factors affecting construction time in Western Australia

Delays are major problems that face the Western Australia’s construction industry. Delays can lead to many negative effects such as cost overruns, and is of high concern to those who are involved in the construction industry. This study was set to identify the major causes of delays in the Western A...

Full description

Bibliographic Details
Main Authors: Wong, K., Vimonsatit, Vanissorn
Format: Journal Article
Published: Academic Journals 2012
Subjects:
Online Access:http://academicjournals.org/article/article1380791729_Wong%20and%20Vimonsatit.pdf
http://hdl.handle.net/20.500.11937/5374
_version_ 1848744779177787392
author Wong, K.
Vimonsatit, Vanissorn
author_facet Wong, K.
Vimonsatit, Vanissorn
author_sort Wong, K.
building Curtin Institutional Repository
collection Online Access
description Delays are major problems that face the Western Australia’s construction industry. Delays can lead to many negative effects such as cost overruns, and is of high concern to those who are involved in the construction industry. This study was set to identify the major causes of delays in the Western Australian construction industry, by means of a literature review and a questionnaire survey. A total of 48 delay factors were obtained from literature review and were further categorised into eight major groups that contributed to the causes of delay. The questionnaire survey was distributed to the targeted respondents from a combination of clients, contractors, and consultants in Perth, Western Australia. About 32 respondents participated in the survey. Based on the data received, albeit limited, the top ten most important causes identified were: (1) Shortage of skills; (2) Financial difficulties; (3) Shortage of labour; (4) Unrealistic deadlines for project completion; (5) Unforeseen ground conditions; (6) Poor organization of the contractor or consultant; (7) Poor communication; (8) Underestimation of time of completion; (9) low speed of decision; and (10) Design errors made by designers.
first_indexed 2025-11-14T06:06:53Z
format Journal Article
id curtin-20.500.11937-5374
institution Curtin University Malaysia
institution_category Local University
last_indexed 2025-11-14T06:06:53Z
publishDate 2012
publisher Academic Journals
recordtype eprints
repository_type Digital Repository
spelling curtin-20.500.11937-53742017-01-30T10:45:44Z A study of the factors affecting construction time in Western Australia Wong, K. Vimonsatit, Vanissorn delay factors construction industry Western Australia construction projects Delays Delays are major problems that face the Western Australia’s construction industry. Delays can lead to many negative effects such as cost overruns, and is of high concern to those who are involved in the construction industry. This study was set to identify the major causes of delays in the Western Australian construction industry, by means of a literature review and a questionnaire survey. A total of 48 delay factors were obtained from literature review and were further categorised into eight major groups that contributed to the causes of delay. The questionnaire survey was distributed to the targeted respondents from a combination of clients, contractors, and consultants in Perth, Western Australia. About 32 respondents participated in the survey. Based on the data received, albeit limited, the top ten most important causes identified were: (1) Shortage of skills; (2) Financial difficulties; (3) Shortage of labour; (4) Unrealistic deadlines for project completion; (5) Unforeseen ground conditions; (6) Poor organization of the contractor or consultant; (7) Poor communication; (8) Underestimation of time of completion; (9) low speed of decision; and (10) Design errors made by designers. 2012 Journal Article http://hdl.handle.net/20.500.11937/5374 http://academicjournals.org/article/article1380791729_Wong%20and%20Vimonsatit.pdf Academic Journals restricted
spellingShingle delay factors
construction industry
Western Australia
construction projects
Delays
Wong, K.
Vimonsatit, Vanissorn
A study of the factors affecting construction time in Western Australia
title A study of the factors affecting construction time in Western Australia
title_full A study of the factors affecting construction time in Western Australia
title_fullStr A study of the factors affecting construction time in Western Australia
title_full_unstemmed A study of the factors affecting construction time in Western Australia
title_short A study of the factors affecting construction time in Western Australia
title_sort study of the factors affecting construction time in western australia
topic delay factors
construction industry
Western Australia
construction projects
Delays
url http://academicjournals.org/article/article1380791729_Wong%20and%20Vimonsatit.pdf
http://hdl.handle.net/20.500.11937/5374