Financing Decision Model for Toll Roads: Balancing Economic and Public Attributes
© 2017 American Society of Civil Engineers.Two common attributes are associated with toll roads: an economic attribute and a public attribute. These attributes are not equalized - the higher the economic benefits, the lower the consumer surplus. This paper presents a quantitative decision model for...
| Main Authors: | Yan, X., Chong, Heap Yih, Sheng, Z., Wang, X. |
|---|---|
| Format: | Journal Article |
| Published: |
ASCE
2017
|
| Online Access: | http://hdl.handle.net/20.500.11937/53108 |
Similar Items
Financing of public private partnerships: Transactional evidence from Australian toll roads
by: Regan, M., et al.
Published: (2017)
by: Regan, M., et al.
Published: (2017)
Investing in toll highway: private or public financing with scenario-based solution
by: Hassan, Mazlan, et al.
Published: (2013)
by: Hassan, Mazlan, et al.
Published: (2013)
Does Zero Road Toll Create Unliveable Neighbourhoods?
by: Curtis, Carey, et al.
Published: (2001)
by: Curtis, Carey, et al.
Published: (2001)
Blackspot analysis of road traffic crashes in Surabaya -
Manyar Toll Road, East Java
by: Hartatik, Nurani, et al.
Published: (2021)
by: Hartatik, Nurani, et al.
Published: (2021)
The outlook of building information modeling for sustainable development
by: Chong, Heap Yih, et al.
Published: (2016)
by: Chong, Heap Yih, et al.
Published: (2016)
Review of speed limit for FR222 access road to Gambang toll
by: Hazlyza, Zainon
Published: (2012)
by: Hazlyza, Zainon
Published: (2012)
Projection on pavement life time for FR 222 access road to Gambang toll
by: Amrina, Abu Bakar
Published: (2012)
by: Amrina, Abu Bakar
Published: (2012)
Analysis of LTE performance of V2V communications on indonesia toll road
by: Amrullah, Agit, et al.
Published: (2023)
by: Amrullah, Agit, et al.
Published: (2023)
Comparative Analysis on the Adoption and Use of BIM in Road Infrastructure Projects
by: Chong, Heap Yih, et al.
Published: (2016)
by: Chong, Heap Yih, et al.
Published: (2016)
Modelling toll operations in Malaysia
by: Abdul Hamid, Ahmad Hilmy
Published: (1995)
by: Abdul Hamid, Ahmad Hilmy
Published: (1995)
A mixed review of the adoption of Building Information Modelling (BIM) for sustainability
by: Chong, Heap Yih, et al.
Published: (2017)
by: Chong, Heap Yih, et al.
Published: (2017)
Examining the interrelationship among critical success factors of public private partnership infrastructure projects
by: Shi, S., et al.
Published: (2016)
by: Shi, S., et al.
Published: (2016)
A conceptual framework for Social Network Analysis of Building Information Modelling in construction projects
by: Gardounis, F., et al.
Published: (2017)
by: Gardounis, F., et al.
Published: (2017)
Balancing public health with economic gains
by: Long, Chiau Ming *, et al.
Published: (2023)
by: Long, Chiau Ming *, et al.
Published: (2023)
Streamlining Digital Modeling and Building Information Modelling (BIM) Uses for the Oil and Gas Projects
by: Lee, Cen-Ying, et al.
Published: (2018)
by: Lee, Cen-Ying, et al.
Published: (2018)
Integrating Building Information Modelling with Facilities Management
by: Chong, Heap Yih, et al.
Published: (2014)
by: Chong, Heap Yih, et al.
Published: (2014)
Alcohol in Canada: Reducing the toll through focused interventions and public health policies
by: Giesbrecht, N., et al.
Published: (2011)
by: Giesbrecht, N., et al.
Published: (2011)
Analyst Recommendations and Financing Decisions of Public Listed Companies
by: Tiew, Wan Ying
Published: (2013)
by: Tiew, Wan Ying
Published: (2013)
Supply Chain Management in Megaprojects
by: Wang, X., et al.
Published: (2017)
by: Wang, X., et al.
Published: (2017)
The roles of project stakeholders in EPCM BIM-enabled projects
by: Lee, C., et al.
Published: (2017)
by: Lee, C., et al.
Published: (2017)
An application of value stream mapping for turnaround maintenance in oil and gas industry: Case study and lessions learned
by: Wenchi, S., et al.
Published: (2015)
by: Wenchi, S., et al.
Published: (2015)
Efficiency improvement by navigated safety inspection involving visual clutter based on the random search model.
by: Sun, X., et al.
Published: (2018)
by: Sun, X., et al.
Published: (2018)
Technical Review: Analysis and Appraisal of Four-Dimensional Building Information Modeling Usability in Construction and Engineering Projects
by: Lopez, R., et al.
Published: (2016)
by: Lopez, R., et al.
Published: (2016)
Influence of location attributes on home buyers’ purchase decision
by: Mang, Jie Sheng, et al.
Published: (2018)
by: Mang, Jie Sheng, et al.
Published: (2018)
The influence of social capitalism on construction safety behaviors: An exploratory megaproject case study
by: Wu, X., et al.
Published: (2018)
by: Wu, X., et al.
Published: (2018)
Global positioning system for expressway tolling system
by: Shatishwaran, Sivalingam
Published: (2022)
by: Shatishwaran, Sivalingam
Published: (2022)
Examining the critical success factors in the adoption of value stream mapping
by: Shou, W., et al.
Published: (2016)
by: Shou, W., et al.
Published: (2016)
The challenges and trends of building information modelling (BIM) for construction and resources sectors
by: Wang, Xiangyu, et al.
Published: (2014)
by: Wang, Xiangyu, et al.
Published: (2014)
Stylometric authorship balanced attribution prediction method
by: Mustafa, Tareef Kamil
Published: (2011)
by: Mustafa, Tareef Kamil
Published: (2011)
Reply: Does the death knell toll for phlebotomy in NAFLD?
by: Adams, Leon, et al.
Published: (2015)
by: Adams, Leon, et al.
Published: (2015)
Toll-like receptors (TLRs) and T cell effector function
by: Mahmood, Majid Mohammed
Published: (2020)
by: Mahmood, Majid Mohammed
Published: (2020)
Microscopic Simulation On The Operation And Capacity Of Toll Plaza In Malaysia
by: Mahdi, Mohammed Bally
Published: (2017)
by: Mahdi, Mohammed Bally
Published: (2017)
Development of predictive modeling and deep learning classification of taxi trip tolls
by: Al-Shoukry, Suhad, et al.
Published: (2022)
by: Al-Shoukry, Suhad, et al.
Published: (2022)
Achieving economically sustainable subcontracting through the hotelling model by considering the spillover effect
by: Zhu, J., et al.
Published: (2018)
by: Zhu, J., et al.
Published: (2018)
Islamic finance sector: the new silk road
by: Kayadibi, Saim
Published: (2011)
by: Kayadibi, Saim
Published: (2011)
Multicriteria Decision Model for Road Construction Project
by: SN, Ramlay, et al.
Published: (2023)
by: SN, Ramlay, et al.
Published: (2023)
Managing Critical Factors Causing Delays in Public Construction Projects in Kingdom of Saudi Arabia
by: Alotaibi, Nasser, et al.
Published: (2015)
by: Alotaibi, Nasser, et al.
Published: (2015)
Information asymmetry and financing decisions
by: Su, Hui Ling
Published: (2012)
by: Su, Hui Ling
Published: (2012)
Remuneration committee attributes and firm performance in finance industry
by: Mohd. Saat, Nur Ashikin, et al.
Published: (2013)
by: Mohd. Saat, Nur Ashikin, et al.
Published: (2013)
The toll effect on price of anarchy when costs are nonlinear and asymmetric
by: Han, D., et al.
Published: (2008)
by: Han, D., et al.
Published: (2008)
Similar Items
-
Financing of public private partnerships: Transactional evidence from Australian toll roads
by: Regan, M., et al.
Published: (2017) -
Investing in toll highway: private or public financing with scenario-based solution
by: Hassan, Mazlan, et al.
Published: (2013) -
Does Zero Road Toll Create Unliveable Neighbourhoods?
by: Curtis, Carey, et al.
Published: (2001) -
Blackspot analysis of road traffic crashes in Surabaya -
Manyar Toll Road, East Java
by: Hartatik, Nurani, et al.
Published: (2021) -
The outlook of building information modeling for sustainable development
by: Chong, Heap Yih, et al.
Published: (2016)