Lessons learned from large construction project in Saudi Arabia

The purpose of this paper is to identify project management issues in a specific construction project in Saudi Arabia, highlighting its unique context. In the tradition of phenomenological research, a framework based deductive research approach is adopted where a structured questionnaire is used in...

Full description

Bibliographic Details
Main Authors: Mitra, S., Tan, Albert
Format: Journal Article
Published: Emerald Group Publishing 2012
Online Access:http://hdl.handle.net/20.500.11937/52646
_version_ 1848758977880391680
author Mitra, S.
Tan, Albert
author_facet Mitra, S.
Tan, Albert
author_sort Mitra, S.
building Curtin Institutional Repository
collection Online Access
description The purpose of this paper is to identify project management issues in a specific construction project in Saudi Arabia, highlighting its unique context. In the tradition of phenomenological research, a framework based deductive research approach is adopted where a structured questionnaire is used in one?to?one interview with project participants. This research highlights the interaction outcomes of human, project tool & methods, supply chain and finance affecting overall project execution and goes beyond to identify critical linkages in these interactions, including those that will need identification of skill sets required for the project manager's role, options approach and standardization of product and processes together with early involvement of diverse stakeholders in the project for their better execution through ex ante identification of project parameters requiring minimum changes. The final framework arrived at identifies various tradeoffs involved in project management in the idiosyncratic context of demanding client driving the project needs and internal resistance to change limiting flexibility in project execution. It focuses on deviations from international project execution standards, as found in large construction projects in the Middle East, specifically Saudi Arabia. The limitation of the research lies in arriving at generalizable findings based on the study of a single international hotel construction project, and not an industry?wide questionnaire survey which can, in future, refine and strengthen the framework developed. A study in the context of Saudi Arabia is seldom reported in international journals although large turnkey construction project opportunities exist for international firms in this country and in the Middle East region. © 2012, Emerald Group Publishing Limited
first_indexed 2025-11-14T09:52:34Z
format Journal Article
id curtin-20.500.11937-52646
institution Curtin University Malaysia
institution_category Local University
last_indexed 2025-11-14T09:52:34Z
publishDate 2012
publisher Emerald Group Publishing
recordtype eprints
repository_type Digital Repository
spelling curtin-20.500.11937-526462017-09-13T15:40:42Z Lessons learned from large construction project in Saudi Arabia Mitra, S. Tan, Albert The purpose of this paper is to identify project management issues in a specific construction project in Saudi Arabia, highlighting its unique context. In the tradition of phenomenological research, a framework based deductive research approach is adopted where a structured questionnaire is used in one?to?one interview with project participants. This research highlights the interaction outcomes of human, project tool & methods, supply chain and finance affecting overall project execution and goes beyond to identify critical linkages in these interactions, including those that will need identification of skill sets required for the project manager's role, options approach and standardization of product and processes together with early involvement of diverse stakeholders in the project for their better execution through ex ante identification of project parameters requiring minimum changes. The final framework arrived at identifies various tradeoffs involved in project management in the idiosyncratic context of demanding client driving the project needs and internal resistance to change limiting flexibility in project execution. It focuses on deviations from international project execution standards, as found in large construction projects in the Middle East, specifically Saudi Arabia. The limitation of the research lies in arriving at generalizable findings based on the study of a single international hotel construction project, and not an industry?wide questionnaire survey which can, in future, refine and strengthen the framework developed. A study in the context of Saudi Arabia is seldom reported in international journals although large turnkey construction project opportunities exist for international firms in this country and in the Middle East region. © 2012, Emerald Group Publishing Limited 2012 Journal Article http://hdl.handle.net/20.500.11937/52646 10.1108/14635771211242978 Emerald Group Publishing restricted
spellingShingle Mitra, S.
Tan, Albert
Lessons learned from large construction project in Saudi Arabia
title Lessons learned from large construction project in Saudi Arabia
title_full Lessons learned from large construction project in Saudi Arabia
title_fullStr Lessons learned from large construction project in Saudi Arabia
title_full_unstemmed Lessons learned from large construction project in Saudi Arabia
title_short Lessons learned from large construction project in Saudi Arabia
title_sort lessons learned from large construction project in saudi arabia
url http://hdl.handle.net/20.500.11937/52646