A Probabilistic Model to Improve Reconciliation of Estimated and Actual Grade in Open Pit Mining
Many of the open-pit mines suffer from the lack of reconciliation between estimated and actual grades. In a mining operation, grade reconciliation is the comparison between the values of the estimated grade calculated in exploration stage and the actual grade obtained from more reliable data such as...
| Main Authors: | Parhizkar, A., Ataei, M., Moarefvand, P., Rasouli, Vamegh |
|---|---|
| Format: | Journal Article |
| Published: |
Springer
2012
|
| Online Access: | http://hdl.handle.net/20.500.11937/47496 |
Similar Items
Grade Uncertainty and its Impact on Ore Grade Reconciliation between the Resource Model and the Mine
by: Parhizkar, A., et al.
Published: (2011)
by: Parhizkar, A., et al.
Published: (2011)
Optimisation of road position in open pit mining using location theory
by: parhizkar, A., et al.
Published: (2008)
by: parhizkar, A., et al.
Published: (2008)
Long-term Open-pit Mine Production Scheduling with Grade Engineering
by: Fathollahzadeh, Karo
Published: (2022)
by: Fathollahzadeh, Karo
Published: (2022)
A review of cut-off grade policy models for open pit mining operations
by: Asad, Mohammad, et al.
Published: (2016)
by: Asad, Mohammad, et al.
Published: (2016)
Optimum design of open pit mines
by: Giannini, Luciano Mario
Published: (1990)
by: Giannini, Luciano Mario
Published: (1990)
Net present value maximisation model for optimum cut-off grade policy of open pit mining operations
by: Asad, M., et al.
Published: (2011)
by: Asad, M., et al.
Published: (2011)
Uncertainty, Reliability and Probabilistic Analysis of Open Pit Rock
Slope Stability and Predictions
by: Abdulai, Musah
Published: (2023)
by: Abdulai, Musah
Published: (2023)
Flexible open-pit mine design under uncertainty
by: Groeneveld, Ben, et al.
Published: (2011)
by: Groeneveld, Ben, et al.
Published: (2011)
Robust versus Flexible Open Pit Mine Design
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
A method for optimal cut-off grade policy in open pit mining operations under uncertain supply
by: Khan, A., et al.
Published: (2019)
by: Khan, A., et al.
Published: (2019)
A heuristic approach to stochastic cutoff grade optimization for open pit mining complexes with multiple processing streams
by: Asad, Mohammad Waqar, et al.
Published: (2013)
by: Asad, Mohammad Waqar, et al.
Published: (2013)
The Thin Coal Seam (TCS) Mining Technology for Open Pit Mines in China
by: Liu, P., et al.
Published: (2018)
by: Liu, P., et al.
Published: (2018)
Studying the scale effect and uniformity of grade parameter using geostatistical approaches
by: parhizkar, A., et al.
Published: (2008)
by: parhizkar, A., et al.
Published: (2008)
A mathematical programming model for optimal cut-off grade policy in open pit mining operations with multiple processing streams
by: Khan, A., et al.
Published: (2018)
by: Khan, A., et al.
Published: (2018)
Determination of the transition Point from Open Pit to Underground Mining
by: Chung, J., et al.
Published: (2016)
by: Chung, J., et al.
Published: (2016)
Using Clustering Methods for Open Pit Mine Production Scheduling
by: Ren, H., et al.
Published: (2014)
by: Ren, H., et al.
Published: (2014)
An Implementation of Ant Colony and Genetic Algorithm based Hybrid-Metaheuristic for Cut-off Grade Optimization in Open-Pit Mining Operations
by: Qureshi, Muhammad Asim
Published: (2017)
by: Qureshi, Muhammad Asim
Published: (2017)
Production Scheduling of an Open-pit Mining Complex with Waste
Dump Constraints
by: Lin, Wei
Published: (2021)
by: Lin, Wei
Published: (2021)
Optimal System Design for Instrumented Slope Monitoring in Open Pit Mines
by: Narendranathan, S., et al.
Published: (2011)
by: Narendranathan, S., et al.
Published: (2011)
Selection criteria for loading and hauling equipment - open pit mining applications
by: Hardy, Raymond J
Published: (2007)
by: Hardy, Raymond J
Published: (2007)
Transition from open-pit to underground – using Integer Programming considering grade uncertainty
by: Chung, Joyce Sze Yee, et al.
Published: (2015)
by: Chung, Joyce Sze Yee, et al.
Published: (2015)
Optimising the long-term mine waste management and truck schedule in a largescale open pit mine
by: Li, Y., et al.
Published: (2016)
by: Li, Y., et al.
Published: (2016)
A new generic open pit mine planning process with risk assessment ability
by: Mai, N., et al.
Published: (2016)
by: Mai, N., et al.
Published: (2016)
A Mixed Integer Programming Approach
for Transitioning from Open-pit to
Underground Mining
by: Chung, Joyce Sze Yee
Published: (2020)
by: Chung, Joyce Sze Yee
Published: (2020)
Slope Stability Monitoring Methods and Technologies for Open-Pit Mining: A Systematic Review
by: Le Roux, Rohan, et al.
Published: (2025)
by: Le Roux, Rohan, et al.
Published: (2025)
Stochastic production phase design for an open pit mining complex with multiple processing streams
by: Asad, Mohammad Waqar, et al.
Published: (2014)
by: Asad, Mohammad Waqar, et al.
Published: (2014)
Modeling and estimation of rock mass deformation modulus using geostatistical approaches in Bakhtiary dam
by: Hamzehpour, H., et al.
Published: (2008)
by: Hamzehpour, H., et al.
Published: (2008)
3-dimensional Modeling and Mining Analysis for Open-pit Limestone Mine Stope Using a Rotary-wing Unmanned Aerial Vehicle
by: Kang, S., et al.
Published: (2018)
by: Kang, S., et al.
Published: (2018)
A new open-pit mine planning optimization method using block aggregation and integer programming
by: Mai, N., et al.
Published: (2018)
by: Mai, N., et al.
Published: (2018)
Optimal production scale of open pit mining operations with uncertain metal supply and long-term stockpiles
by: Asad, Mohammad Waqar, et al.
Published: (2012)
by: Asad, Mohammad Waqar, et al.
Published: (2012)
Effects of tectonic stresses and structural planes on slope deformation and stability at the Buzhaoba open pit mine, China
by: Chen, Shuzhao, et al.
Published: (2019)
by: Chen, Shuzhao, et al.
Published: (2019)
Probabilistic models for mining imbalanced relational data
by: Ghanem, Amal Saleh
Published: (2009)
by: Ghanem, Amal Saleh
Published: (2009)
Performance evaluation of a new stochastic network flow approach to optimal open pit mine design - application at a gold mine
by: Asad, Mohammad Waqar, et al.
Published: (2012)
by: Asad, Mohammad Waqar, et al.
Published: (2012)
National reconciliation
by: Ismail, Nik Ahmad Hisham
Published: (2014)
by: Ismail, Nik Ahmad Hisham
Published: (2014)
Implementing a parametric maximum flow algorithm for optimal open pit mine design under uncertain supply and demand
by: Asad, Mohammad Waqar, et al.
Published: (2013)
by: Asad, Mohammad Waqar, et al.
Published: (2013)
Optimising the long term mine landform progression and truck hour schedule in a large scale open pit mine using mixed integer programming
by: Li, Y., et al.
Published: (2018)
by: Li, Y., et al.
Published: (2018)
A new model for open-pit production and waste-dump scheduling
by: Fu, Z., et al.
Published: (2019)
by: Fu, Z., et al.
Published: (2019)
Race and Reconciliation in Australia
by: Green, M., et al.
Published: (2007)
by: Green, M., et al.
Published: (2007)
Optimizing open-pit block scheduling with exposed ore reserve
by: Saavedra-Rosas, Jose, et al.
Published: (2016)
by: Saavedra-Rosas, Jose, et al.
Published: (2016)
Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming
by: Li, Y, et al.
Published: (2014)
by: Li, Y, et al.
Published: (2014)
Similar Items
-
Grade Uncertainty and its Impact on Ore Grade Reconciliation between the Resource Model and the Mine
by: Parhizkar, A., et al.
Published: (2011) -
Optimisation of road position in open pit mining using location theory
by: parhizkar, A., et al.
Published: (2008) -
Long-term Open-pit Mine Production Scheduling with Grade Engineering
by: Fathollahzadeh, Karo
Published: (2022) -
A review of cut-off grade policy models for open pit mining operations
by: Asad, Mohammad, et al.
Published: (2016) -
Optimum design of open pit mines
by: Giannini, Luciano Mario
Published: (1990)