Managing Projects in an Uncertain and Volatile World: Engaging Stakeholders, and Building a Systemic View of Risk
As evidenced through both a historical and contemporary number of over-runs managing projects can be a risky business. Managers are faced with effectively working with a multitude of parties, dealing with a wealth of interlocking uncertainties and frequently undertaking these activities within a com...
| Main Authors: | Ackermann, Fran, Howick, S., Quigley, J., Walls, L., Houghton, T. |
|---|---|
| Other Authors: | Raj Pillai |
| Format: | Conference Paper |
| Published: |
ANZAM
2012
|
| Online Access: | http://hdl.handle.net/20.500.11937/46646 |
Similar Items
Systemic risk elicitation: Using causal maps to engage stakeholders and build a comprehensive view of risks
by: Ackermann, Fran, et al.
Published: (2014)
by: Ackermann, Fran, et al.
Published: (2014)
Building a framework for integrated risk management of complex projects: The case of a major distribution network investment
by: Houghton, T., et al.
Published: (2013)
by: Houghton, T., et al.
Published: (2013)
Modelling systemic risks to inform a repowering decision
by: Walls, L., et al.
Published: (2014)
by: Walls, L., et al.
Published: (2014)
Learning from mixed OR method practice: The NINES case study
by: Howick, S., et al.
Published: (2017)
by: Howick, S., et al.
Published: (2017)
Delay and Disruption in Complex Projects
by: Ackermann, Fran, et al.
Published: (2011)
by: Ackermann, Fran, et al.
Published: (2011)
Linking Event Thinking with Structural Thinking: Methods to Improve Client Value in Projects
by: Howick, S., et al.
Published: (2006)
by: Howick, S., et al.
Published: (2006)
Building Confidence in Models for Multiple Audiences: The Modelling Cascade
by: Howick, S., et al.
Published: (2008)
by: Howick, S., et al.
Published: (2008)
Strategic Management of Stakeholders: Theory and Practice
by: Ackermann, Fran, et al.
Published: (2011)
by: Ackermann, Fran, et al.
Published: (2011)
Systemic Risk Assessment: A Case Study
by: Ackermann, Fran, et al.
Published: (2007)
by: Ackermann, Fran, et al.
Published: (2007)
Mixing OR Methods in Practice: Past, Present and Future directions
by: Howick, S., et al.
Published: (2011)
by: Howick, S., et al.
Published: (2011)
Stakeholder Engagement: An Effectve Mechanism for Managing Social Risks
by: Appiah, Edward
Published: (2013)
by: Appiah, Edward
Published: (2013)
A computational scheme for uncertain volatility model in option pricing
by: Zhang, K., et al.
Published: (2009)
by: Zhang, K., et al.
Published: (2009)
Toward a Systemic View to Cost Overrun Causation in Infrastructure Projects: A Review and Implications for Research
by: Ahiaga-Dagbui, D., et al.
Published: (2016)
by: Ahiaga-Dagbui, D., et al.
Published: (2016)
Stakeholder management and engagement in the utility industry
by: Dhawan, Rohit
Published: (2013)
by: Dhawan, Rohit
Published: (2013)
Harnessing model-based group decision support systems for more effective stakeholder engagement: Reflections from the field
by: Ackermann, Fran, et al.
Published: (2025)
by: Ackermann, Fran, et al.
Published: (2025)
Critical Success Factors for Stakeholder Engagement in Renewable Energy Projects of Malaysia
by: Zarith Sufia, Azlan, et al.
Published: (2019)
by: Zarith Sufia, Azlan, et al.
Published: (2019)
Fire risk assessment of heritage building - perspectives of building stakeholders
by: Ibrahim, Md. Najib, et al.
Published: (2013)
by: Ibrahim, Md. Najib, et al.
Published: (2013)
Essential Skills And Training Provisions For Building Project Stakeholders In Palestine
by: Enshassi, Adnan, et al.
Published: (2009)
by: Enshassi, Adnan, et al.
Published: (2009)
Evaluating the behaviour of Chinese stakeholders engaged in large hydropower projects in Asia and Africa
by: Tan-Mullins, May, et al.
Published: (2017)
by: Tan-Mullins, May, et al.
Published: (2017)
Investigating the stakeholder engagement indicators towards renewable energy projects success in Malaysia
by: Zarith Sufia, Azlan, et al.
Published: (2020)
by: Zarith Sufia, Azlan, et al.
Published: (2020)
Managing risk in production scheduling under uncertain disruption
by: Sarker, Ruhul, et al.
Published: (2015)
by: Sarker, Ruhul, et al.
Published: (2015)
Tourism in an uncertain world: Profiling the asean-bound leisure traveller
by: Loh, Jacqueline Po-Lin
Published: (2004)
by: Loh, Jacqueline Po-Lin
Published: (2004)
Putting the Resource Based View of Strategy to Work in Public Organizations
by: Bryson, J., et al.
Published: (2007)
by: Bryson, J., et al.
Published: (2007)
Stakeholders’ perception on critical cost variation factors in Malaysian building projects
by: Sohu, Samiullah, et al.
Published: (2018)
by: Sohu, Samiullah, et al.
Published: (2018)
The Amoebic Growth of Project Costs
by: Eden, C., et al.
Published: (2005)
by: Eden, C., et al.
Published: (2005)
Developing a model for effective stakeholder engagement management
by: Sinclair, Marie-Louise
Published: (2011)
by: Sinclair, Marie-Louise
Published: (2011)
Assessing the Impact of Stakeholder Engagement in Management Strategy Evaluation
by: Fulton, Elizabeth, et al.
Published: (2013)
by: Fulton, Elizabeth, et al.
Published: (2013)
Medical specialist training: views from stakeholders
by: Md Azhar , Md Tahir, et al.
Published: (2015)
by: Md Azhar , Md Tahir, et al.
Published: (2015)
Fire risk assessment of heritage building – perspectives
of regulatory authority, restorer and building
stakeholder
by: M. N. Ibrahim, Mohd Najib, et al.
Published: (2011)
by: M. N. Ibrahim, Mohd Najib, et al.
Published: (2011)
Fire risk assessment of heritage building – perspectives of regulatory authority, restorer and building stakeholder
by: Ibrahim, Md. Najib, et al.
Published: (2011)
by: Ibrahim, Md. Najib, et al.
Published: (2011)
Fire risk assessment of heritage building – perspectives of regulatory authority, restorer and building stakeholder
by: Ibrahim, Md. Najib, et al.
Published: (2011)
by: Ibrahim, Md. Najib, et al.
Published: (2011)
Global engagement and returns volatility
by: Girma, Sourafel, et al.
Published: (2016)
by: Girma, Sourafel, et al.
Published: (2016)
Researching complex projects: Using causal mapping to take a systems perspective
by: Ackermann, Fran, et al.
Published: (2016)
by: Ackermann, Fran, et al.
Published: (2016)
Stakeholder management in public sector infrastructure projects
by: Muhammad, Waris, et al.
Published: (2022)
by: Muhammad, Waris, et al.
Published: (2022)
Risk Management Practices in Green Building Projects
by: Tan, Chuan Soon
Published: (2021)
by: Tan, Chuan Soon
Published: (2021)
Stakeholder Engagement and Sustainable Corporate Community Investment
by: Rowe, Anna, et al.
Published: (2013)
by: Rowe, Anna, et al.
Published: (2013)
Outsourcing Malaysia federal Tax Audit: the Stakeholders’ views
by: Norsiah Ahmad,, et al.
Published: (2014)
by: Norsiah Ahmad,, et al.
Published: (2014)
Analyzing the constructs of stakeholder engagement towards renewable energy projects success in Malaysia: a PLS approach
by: M., Waris, et al.
Published: (2019)
by: M., Waris, et al.
Published: (2019)
Key drivers for adopting design build: A comparative study between project stakeholders
by: Lee, Z. P., et al.
Published: (2020)
by: Lee, Z. P., et al.
Published: (2020)
Sustainability goals and project success from the perspective of the stakeholders of green building project in Malaysia: a preliminary study
by: Mohd Isa, Nor Kalsum, et al.
Published: (2018)
by: Mohd Isa, Nor Kalsum, et al.
Published: (2018)
Similar Items
-
Systemic risk elicitation: Using causal maps to engage stakeholders and build a comprehensive view of risks
by: Ackermann, Fran, et al.
Published: (2014) -
Building a framework for integrated risk management of complex projects: The case of a major distribution network investment
by: Houghton, T., et al.
Published: (2013) -
Modelling systemic risks to inform a repowering decision
by: Walls, L., et al.
Published: (2014) -
Learning from mixed OR method practice: The NINES case study
by: Howick, S., et al.
Published: (2017) -
Delay and Disruption in Complex Projects
by: Ackermann, Fran, et al.
Published: (2011)