Mine waste rock management
| Main Authors: | Topal, Erkan, Williams, D. |
|---|---|
| Other Authors: | W J Rankin |
| Format: | Book Chapter |
| Published: |
The Australasian Institute of Mining and Metallurgy (AusIMM)
2012
|
| Online Access: | http://hdl.handle.net/20.500.11937/46469 |
Similar Items
Mathematical approach for better mine waste rock dumping management
by: Li, Y., et al.
Published: (2012)
by: Li, Y., et al.
Published: (2012)
Optimisation of waste rock placement using mixed integer programming
by: Li, Y., et al.
Published: (2014)
by: Li, Y., et al.
Published: (2014)
Optimising the long-term mine waste management and truck schedule in a largescale open pit mine
by: Li, Y., et al.
Published: (2016)
by: Li, Y., et al.
Published: (2016)
Waste rock dumping optimisation using mixed integer programming (MIP)
by: Li, Yu, et al.
Published: (2013)
by: Li, Yu, et al.
Published: (2013)
Mining (Australia)
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
Developments in Mine Design, Planning and Scheduling in Open Cut Mining
by: Saydam, S., et al.
Published: (2012)
by: Saydam, S., et al.
Published: (2012)
New approach for estimating total mining costs in surface coal mines
by: Shafiee, S., et al.
Published: (2012)
by: Shafiee, S., et al.
Published: (2012)
Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming
by: Li, Y, et al.
Published: (2014)
by: Li, Y, et al.
Published: (2014)
Mining truck scheduling with stochastic maintenance cost
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
A new MIP model for mine equipment scheduling by minimizing maintenance cost
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
Flexible open-pit mine design under uncertainty
by: Groeneveld, Ben, et al.
Published: (2011)
by: Groeneveld, Ben, et al.
Published: (2011)
Using Clustering Methods for Open Pit Mine Production Scheduling
by: Ren, H., et al.
Published: (2014)
by: Ren, H., et al.
Published: (2014)
Application of predictive data mining to create mine plan flexibility in the face of geological uncertainty
by: Ajak, A., et al.
Published: (2017)
by: Ajak, A., et al.
Published: (2017)
Evaluation of a mining project using Discounted Cash Flow analysis, Decision Tree analysis, Monte Carlo Simulation and Real Options using an example
by: Topal, Erkan
Published: (2008)
by: Topal, Erkan
Published: (2008)
Transformation of the Australian mining industry and future prospects
by: Jang, Hyong Doo, et al.
Published: (2020)
by: Jang, Hyong Doo, et al.
Published: (2020)
A review of soft computing technology applications in several mining problems
by: Jang, H., et al.
Published: (2014)
by: Jang, H., et al.
Published: (2014)
Strategic mine planning model using network flow model and real case application
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
Real option in action: An example of flexible decision making at a mine operational level
by: Ajak, A., et al.
Published: (2015)
by: Ajak, A., et al.
Published: (2015)
Optimising the long term mine landform progression and truck hour schedule in a large scale open pit mine using mixed integer programming
by: Li, Y., et al.
Published: (2018)
by: Li, Y., et al.
Published: (2018)
A new methodology for flexible mine design
by: Groeneveld, B., et al.
Published: (2018)
by: Groeneveld, B., et al.
Published: (2018)
Integrated Optimization of Underground Mine Design and Scheduling
by: Little, J, et al.
Published: (2013)
by: Little, J, et al.
Published: (2013)
Designing an optimal stope layout for underground mining based on a heuristic algorithm
by: Sandanayake, D., et al.
Published: (2015)
by: Sandanayake, D., et al.
Published: (2015)
Strategies to assist in obtaining an optimal solution for an underground mine planning problem using Mixed Integer Programming
by: Little, J., et al.
Published: (2011)
by: Little, J., et al.
Published: (2011)
Robust versus Flexible Open Pit Mine Design
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
Net present value maximisation model for optimum cut-off grade policy of open pit mining operations
by: Asad, M., et al.
Published: (2011)
by: Asad, M., et al.
Published: (2011)
Using Artificial Neural Networks (ANNs) to Predict Stope Overbreak at Plutonic Underground Gold Mine
by: Boxwell, D., et al.
Published: (2014)
by: Boxwell, D., et al.
Published: (2014)
An experimental study on the prediction of acid rock drainage from mining wastes
by: Song, M, et al.
Published: (2008)
by: Song, M, et al.
Published: (2008)
A heuristic approach to optimal design of an underground mine stope layout
by: Sandanayake, D., et al.
Published: (2015)
by: Sandanayake, D., et al.
Published: (2015)
Real Option Identification Framework for Mine Operational Decision-Making
by: Ajak, A., et al.
Published: (2018)
by: Ajak, A., et al.
Published: (2018)
Robust, flexible and operational mine design strategies
by: Groeneveld, Benjamin James, et al.
Published: (2012)
by: Groeneveld, Benjamin James, et al.
Published: (2012)
Implementing a New Heuristic Approach to the Underground Mine Stope Layout Problem
by: Sandanayake, D., et al.
Published: (2014)
by: Sandanayake, D., et al.
Published: (2014)
A new generic open pit mine planning process with risk assessment ability
by: Mai, N., et al.
Published: (2016)
by: Mai, N., et al.
Published: (2016)
A new mathematical programming model for production schedule optimisation in underground mining operations
by: Nehring, M., et al.
Published: (2010)
by: Nehring, M., et al.
Published: (2010)
Illumination of parameter contributions on uneven break phenomenon in underground stoping mines
by: Jang, Hyong Doo, et al.
Published: (2016)
by: Jang, Hyong Doo, et al.
Published: (2016)
A new open-pit mine planning optimization method using block aggregation and integer programming
by: Mai, N., et al.
Published: (2018)
by: Mai, N., et al.
Published: (2018)
Integrated short and medium term underground mine production scheduling
by: Nehring, M., et al.
Published: (2012)
by: Nehring, M., et al.
Published: (2012)
Determination of the transition Point from Open Pit to Underground Mining
by: Chung, J., et al.
Published: (2016)
by: Chung, J., et al.
Published: (2016)
A numerical study for a mining project using real options valuation under commodity price uncertainty
by: Haque, M, et al.
Published: (2014)
by: Haque, M, et al.
Published: (2014)
Implementation and comparison of four stope boundary optimization algorithms in an existing underground mine
by: Erdogan, G., et al.
Published: (2017)
by: Erdogan, G., et al.
Published: (2017)
Illumination of contributing parameters of uneven break in narrow vein mine
by: Jang, Hyong Doo, et al.
Published: (2019)
by: Jang, Hyong Doo, et al.
Published: (2019)
Similar Items
-
Mathematical approach for better mine waste rock dumping management
by: Li, Y., et al.
Published: (2012) -
Optimisation of waste rock placement using mixed integer programming
by: Li, Y., et al.
Published: (2014) -
Optimising the long-term mine waste management and truck schedule in a largescale open pit mine
by: Li, Y., et al.
Published: (2016) -
Waste rock dumping optimisation using mixed integer programming (MIP)
by: Li, Yu, et al.
Published: (2013) -
Mining (Australia)
by: Topal, Erkan, et al.
Published: (2012)