A review of cut-off grade policy models for open pit mining operations
© 2016 Elsevier Ltd. In an open pit mining operation, the heterogeneity of the grade-tonnage distribution of the deposit dictates that all available material within the boundaries of an open pit may not be processed. Given this heterogeneity, it is imperative that the valuable (ore) and waste materi...
| Main Authors: | Asad, Mohammad, Qureshi, Muhammad, Jang, Hyong Doo |
|---|---|
| Format: | Journal Article |
| Published: |
Pergamon Press
2016
|
| Online Access: | http://hdl.handle.net/20.500.11937/4525 |
Similar Items
Net present value maximisation model for optimum cut-off grade policy of open pit mining operations
by: Asad, M., et al.
Published: (2011)
by: Asad, M., et al.
Published: (2011)
A method for optimal cut-off grade policy in open pit mining operations under uncertain supply
by: Khan, A., et al.
Published: (2019)
by: Khan, A., et al.
Published: (2019)
A mathematical programming model for optimal cut-off grade policy in open pit mining operations with multiple processing streams
by: Khan, A., et al.
Published: (2018)
by: Khan, A., et al.
Published: (2018)
An Implementation of Ant Colony and Genetic Algorithm based Hybrid-Metaheuristic for Cut-off Grade Optimization in Open-Pit Mining Operations
by: Qureshi, Muhammad Asim
Published: (2017)
by: Qureshi, Muhammad Asim
Published: (2017)
A heuristic approach to stochastic cutoff grade optimization for open pit mining complexes with multiple processing streams
by: Asad, Mohammad Waqar, et al.
Published: (2013)
by: Asad, Mohammad Waqar, et al.
Published: (2013)
3-dimensional Modeling and Mining Analysis for Open-pit Limestone Mine Stope Using a Rotary-wing Unmanned Aerial Vehicle
by: Kang, S., et al.
Published: (2018)
by: Kang, S., et al.
Published: (2018)
Optimal production scale of open pit mining operations with uncertain metal supply and long-term stockpiles
by: Asad, Mohammad Waqar, et al.
Published: (2012)
by: Asad, Mohammad Waqar, et al.
Published: (2012)
Long-term Open-pit Mine Production Scheduling with Grade Engineering
by: Fathollahzadeh, Karo
Published: (2022)
by: Fathollahzadeh, Karo
Published: (2022)
Cut-off Grades and Optimising the Strategic Mine Plan
by: Hall, Brian
Published: (2014)
by: Hall, Brian
Published: (2014)
Determination of the transition Point from Open Pit to Underground Mining
by: Chung, J., et al.
Published: (2016)
by: Chung, J., et al.
Published: (2016)
A Probabilistic Model to Improve Reconciliation of Estimated and Actual Grade in Open Pit Mining
by: Parhizkar, A., et al.
Published: (2012)
by: Parhizkar, A., et al.
Published: (2012)
Optimum design of open pit mines
by: Giannini, Luciano Mario
Published: (1990)
by: Giannini, Luciano Mario
Published: (1990)
Stochastic production phase design for an open pit mining complex with multiple processing streams
by: Asad, Mohammad Waqar, et al.
Published: (2014)
by: Asad, Mohammad Waqar, et al.
Published: (2014)
Performance evaluation of a new stochastic network flow approach to optimal open pit mine design - application at a gold mine
by: Asad, Mohammad Waqar, et al.
Published: (2012)
by: Asad, Mohammad Waqar, et al.
Published: (2012)
Australian Mining Transformation and Future Prospects in Response to the 4th Industrial Revolution
by: Jang, Hyong Doo
Published: (2019)
by: Jang, Hyong Doo
Published: (2019)
Unplanned dilution and ore-loss optimisation in underground mines via cooperative neuro-fuzzy network
by: Jang, Hyong Doo
Published: (2014)
by: Jang, Hyong Doo
Published: (2014)
Flexible open-pit mine design under uncertainty
by: Groeneveld, Ben, et al.
Published: (2011)
by: Groeneveld, Ben, et al.
Published: (2011)
Robust versus Flexible Open Pit Mine Design
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
Implementing a parametric maximum flow algorithm for optimal open pit mine design under uncertain supply and demand
by: Asad, Mohammad Waqar, et al.
Published: (2013)
by: Asad, Mohammad Waqar, et al.
Published: (2013)
Optimization of blending operation for Aswan phosphate mines using linear programming
by: Ali, Mahrous, et al.
Published: (2018)
by: Ali, Mahrous, et al.
Published: (2018)
Transformation of the Australian mining industry and future prospects
by: Jang, Hyong Doo, et al.
Published: (2020)
by: Jang, Hyong Doo, et al.
Published: (2020)
A new model for open-pit production and waste-dump scheduling
by: Fu, Z., et al.
Published: (2019)
by: Fu, Z., et al.
Published: (2019)
The Thin Coal Seam (TCS) Mining Technology for Open Pit Mines in China
by: Liu, P., et al.
Published: (2018)
by: Liu, P., et al.
Published: (2018)
Stability Analysis of Mine Drift for Explosive Welding
by: Jang, Hyong Doo, et al.
Published: (2010)
by: Jang, Hyong Doo, et al.
Published: (2010)
Using Clustering Methods for Open Pit Mine Production Scheduling
by: Ren, H., et al.
Published: (2014)
by: Ren, H., et al.
Published: (2014)
Slope Stability Monitoring Methods and Technologies for Open-Pit Mining: A Systematic Review
by: Le Roux, Rohan, et al.
Published: (2025)
by: Le Roux, Rohan, et al.
Published: (2025)
Stability analysis of mine drifts under pressured by blasting welding performance
by: Jang, Hyong Doo, et al.
Published: (2010)
by: Jang, Hyong Doo, et al.
Published: (2010)
Production Scheduling of an Open-pit Mining Complex with Waste
Dump Constraints
by: Lin, Wei
Published: (2021)
by: Lin, Wei
Published: (2021)
Optimal System Design for Instrumented Slope Monitoring in Open Pit Mines
by: Narendranathan, S., et al.
Published: (2011)
by: Narendranathan, S., et al.
Published: (2011)
Optimisation of road position in open pit mining using location theory
by: parhizkar, A., et al.
Published: (2008)
by: parhizkar, A., et al.
Published: (2008)
Selection criteria for loading and hauling equipment - open pit mining applications
by: Hardy, Raymond J
Published: (2007)
by: Hardy, Raymond J
Published: (2007)
A Case Study of Prediction and Analysis of Unplanned Dilution in an Underground Stoping Mine using Artificial Neural Network
by: Jang, Hyong Doo, et al.
Published: (2014)
by: Jang, Hyong Doo, et al.
Published: (2014)
Transition from open-pit to underground – using Integer Programming considering grade uncertainty
by: Chung, Joyce Sze Yee, et al.
Published: (2015)
by: Chung, Joyce Sze Yee, et al.
Published: (2015)
Optimising the long-term mine waste management and truck schedule in a largescale open pit mine
by: Li, Y., et al.
Published: (2016)
by: Li, Y., et al.
Published: (2016)
Illumination of parameter contributions on uneven break phenomenon in underground stoping mines
by: Jang, Hyong Doo, et al.
Published: (2016)
by: Jang, Hyong Doo, et al.
Published: (2016)
A new generic open pit mine planning process with risk assessment ability
by: Mai, N., et al.
Published: (2016)
by: Mai, N., et al.
Published: (2016)
A Mixed Integer Programming Approach
for Transitioning from Open-pit to
Underground Mining
by: Chung, Joyce Sze Yee
Published: (2020)
by: Chung, Joyce Sze Yee
Published: (2020)
Developments in Mine Design, Planning and Scheduling in Open Cut Mining
by: Saydam, S., et al.
Published: (2012)
by: Saydam, S., et al.
Published: (2012)
A Study On The Damage To A Mine Drift Caused By Blast Welding
by: Jang, Hyong Doo, et al.
Published: (2010)
by: Jang, Hyong Doo, et al.
Published: (2010)
Unplanned dilution and ore loss prediction in longhole stoping mines via multiple regression and artificial neural network analyses
by: Jang, Hyong Doo, et al.
Published: (2015)
by: Jang, Hyong Doo, et al.
Published: (2015)
Similar Items
-
Net present value maximisation model for optimum cut-off grade policy of open pit mining operations
by: Asad, M., et al.
Published: (2011) -
A method for optimal cut-off grade policy in open pit mining operations under uncertain supply
by: Khan, A., et al.
Published: (2019) -
A mathematical programming model for optimal cut-off grade policy in open pit mining operations with multiple processing streams
by: Khan, A., et al.
Published: (2018) -
An Implementation of Ant Colony and Genetic Algorithm based Hybrid-Metaheuristic for Cut-off Grade Optimization in Open-Pit Mining Operations
by: Qureshi, Muhammad Asim
Published: (2017) -
A heuristic approach to stochastic cutoff grade optimization for open pit mining complexes with multiple processing streams
by: Asad, Mohammad Waqar, et al.
Published: (2013)