Real time progress management: Re-engineering processes for cloud-based BIM in construction
© 2015 Elsevier B.V. All rights reserved. Having timely access to information on the performance of a construction project enables the design team and contractor to improve their decision-making so as to ensure project deliverables are met. This paper examines the effectiveness of cloud-based BIM fo...
| Main Authors: | , , , , , |
|---|---|
| Format: | Journal Article |
| Published: |
Elsevier
2015
|
| Online Access: | http://hdl.handle.net/20.500.11937/42642 |
| _version_ | 1848756477137780736 |
|---|---|
| author | Matthews, Jane Love, Peter Heinemann, S. Chandler, R. Rumsey, C. Olatunj, O. |
| author_facet | Matthews, Jane Love, Peter Heinemann, S. Chandler, R. Rumsey, C. Olatunj, O. |
| author_sort | Matthews, Jane |
| building | Curtin Institutional Repository |
| collection | Online Access |
| description | © 2015 Elsevier B.V. All rights reserved. Having timely access to information on the performance of a construction project enables the design team and contractor to improve their decision-making so as to ensure project deliverables are met. This paper examines the effectiveness of cloud-based BIM for real-time delivery of information to support progress monitoring and management of the construction of a reinforced concrete (RC) structure using action based research. To undertake this task, existing paper-based processes were re-engineered to accommodate the use of cloud-based BIM during construction. The design and implementation of a real-time object oriented bi-directional system, allowed information (e.g., the status of the 'As-Built' schedule) to be captured on-site and synchronized with a federated BIM. As a result of adopting cloud-based technology during construction, a new object oriented workflow and processes for progress management are proposed. |
| first_indexed | 2025-11-14T09:12:49Z |
| format | Journal Article |
| id | curtin-20.500.11937-42642 |
| institution | Curtin University Malaysia |
| institution_category | Local University |
| last_indexed | 2025-11-14T09:12:49Z |
| publishDate | 2015 |
| publisher | Elsevier |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | curtin-20.500.11937-426422017-09-13T14:24:11Z Real time progress management: Re-engineering processes for cloud-based BIM in construction Matthews, Jane Love, Peter Heinemann, S. Chandler, R. Rumsey, C. Olatunj, O. © 2015 Elsevier B.V. All rights reserved. Having timely access to information on the performance of a construction project enables the design team and contractor to improve their decision-making so as to ensure project deliverables are met. This paper examines the effectiveness of cloud-based BIM for real-time delivery of information to support progress monitoring and management of the construction of a reinforced concrete (RC) structure using action based research. To undertake this task, existing paper-based processes were re-engineered to accommodate the use of cloud-based BIM during construction. The design and implementation of a real-time object oriented bi-directional system, allowed information (e.g., the status of the 'As-Built' schedule) to be captured on-site and synchronized with a federated BIM. As a result of adopting cloud-based technology during construction, a new object oriented workflow and processes for progress management are proposed. 2015 Journal Article http://hdl.handle.net/20.500.11937/42642 10.1016/j.autcon.2015.07.004 Elsevier restricted |
| spellingShingle | Matthews, Jane Love, Peter Heinemann, S. Chandler, R. Rumsey, C. Olatunj, O. Real time progress management: Re-engineering processes for cloud-based BIM in construction |
| title | Real time progress management: Re-engineering processes for cloud-based BIM in construction |
| title_full | Real time progress management: Re-engineering processes for cloud-based BIM in construction |
| title_fullStr | Real time progress management: Re-engineering processes for cloud-based BIM in construction |
| title_full_unstemmed | Real time progress management: Re-engineering processes for cloud-based BIM in construction |
| title_short | Real time progress management: Re-engineering processes for cloud-based BIM in construction |
| title_sort | real time progress management: re-engineering processes for cloud-based bim in construction |
| url | http://hdl.handle.net/20.500.11937/42642 |