An application of value stream mapping for turnaround maintenance in oil and gas industry: Case study and lessions learned
Turnaround maintenance (TAM) in oil and gas industry concerns significant endeavours that deal with inspections, scheduled cleaning, adjustments, repairs and replacements of part of a plant to ensure operational reliability. It involves labour and material-intensive activities, thus is of the essenc...
| Main Authors: | Wenchi, S., Wang, J., Wang, X., Chong, Heap Yih |
|---|---|
| Format: | Conference Paper |
| Published: |
2015
|
| Online Access: | http://hdl.handle.net/20.500.11937/40243 |
Similar Items
Enhanced Value Stream Mapping for Improving Turnaround Process Efficiency in Oil and Gas Industry
by: Shou, Wenchi
Published: (2018)
by: Shou, Wenchi
Published: (2018)
A cross-sector review on the use of value stream mapping
by: Shou, Wenchi, et al.
Published: (2017)
by: Shou, Wenchi, et al.
Published: (2017)
Examining the critical success factors in the adoption of value stream mapping
by: Shou, W., et al.
Published: (2016)
by: Shou, W., et al.
Published: (2016)
Enhancing turnaround maintenance in process plants through on-stream phased array corrosion mapping: a review
by: Tai, Jan Lean, et al.
Published: (2024)
by: Tai, Jan Lean, et al.
Published: (2024)
Application of lean production with value stream mapping to the blasting and coating industry
by: Shou, W., et al.
Published: (2017)
by: Shou, W., et al.
Published: (2017)
4D BIM for improving plant turnaround maintenance planning and execution: A case study
by: Shou, W., et al.
Published: (2018)
by: Shou, W., et al.
Published: (2018)
Organizational Structure and Performance of Plant Turnaround Maintenance in Large Process-Based Industries in Malaysia
by: Ghazali, Zulkipli
Published: (2010)
by: Ghazali, Zulkipli
Published: (2010)
State of the art of dynamic value stream mapping in the manufacturing industry
by: Thulasi, M., et al.
Published: (2022)
by: Thulasi, M., et al.
Published: (2022)
Plant Turnaround Maintenance in Malaysia Petrochemical Industries: a Study of Organizational Size and Structuring Processes
by: Halib, Mohammed, et al.
Published: (2010)
by: Halib, Mohammed, et al.
Published: (2010)
A coordinated approach for supply-chain tracking in the liquefied natural gas industry
by: Wang, J., et al.
Published: (2018)
by: Wang, J., et al.
Published: (2018)
Application of value stream mapping in the automotive industry: A case study
by: Shamsu Anuar, Mohamad Aqil, et al.
Published: (2022)
by: Shamsu Anuar, Mohamad Aqil, et al.
Published: (2022)
Implementation of value stream mapping techniques in improving the performance of service industry
by: Suarno, Agha Khilfi, et al.
Published: (2025)
by: Suarno, Agha Khilfi, et al.
Published: (2025)
Organizational context, structure, and performance of plant turnaround maintenance in Malaysian process based industries / Zulkipli Ghazali
by: Ghazali, Zulkipli
Published: (2010)
by: Ghazali, Zulkipli
Published: (2010)
Streamlining Digital Modeling and Building Information Modelling (BIM) Uses for the Oil and Gas Projects
by: Lee, Cen-Ying, et al.
Published: (2018)
by: Lee, Cen-Ying, et al.
Published: (2018)
Value Stream Mapping at Marks and Spencer Syprus
by: Loizides, George
Published: (2008)
by: Loizides, George
Published: (2008)
Value stream mapping: an important footstep for value analysis and value engineering
by: Karim, A.N. Mustafizul, et al.
Published: (2011)
by: Karim, A.N. Mustafizul, et al.
Published: (2011)
Applying value stream mapping for productivity improvement
of a metal stamping industry
by: Karim, A.N. Mustafizul, et al.
Published: (2012)
by: Karim, A.N. Mustafizul, et al.
Published: (2012)
Value stream mapping implementation in a small and medium agro-based industry
by: Ahmad Hafizzudin, Ahmad, et al.
Published: (2024)
by: Ahmad Hafizzudin, Ahmad, et al.
Published: (2024)
Enhanced value stream mapping for streamlining supply chains in the furniture manufacturing industry
by: Muhammad Ariff Fauzan, Mat Rodzi, et al.
Published: (2025)
by: Muhammad Ariff Fauzan, Mat Rodzi, et al.
Published: (2025)
Quality management in oil and gas turnaround/shutdown projects / Ghadaffi Rosli
by: Ghadaffi, Rosli
Published: (2020)
by: Ghadaffi, Rosli
Published: (2020)
Organizational Structure and Performance of Plant Turnaround Maintenance in Large Process-Based Industries in Malaysia: A Conceptual Framework
by: Ghazali, Zulkipli, et al.
Published: (2008)
by: Ghazali, Zulkipli, et al.
Published: (2008)
Turnaround Architecture:A Study of Critical Success Factors in Turnaround
by: Shetty, Gautam G
Published: (2006)
by: Shetty, Gautam G
Published: (2006)
Corporate Turnarounds in the High-tech Industry in UK
by: Xiao, Haixia
Published: (2009)
by: Xiao, Haixia
Published: (2009)
Corporate Turnarounds in the High-tech Industry in UK
by: Xiao, Haixia
Published: (2009)
by: Xiao, Haixia
Published: (2009)
Value stream mapping (VSM) of production line for a high volume manufacturing industry
by: A.N., Mustafizul Karim, et al.
Published: (2012)
by: A.N., Mustafizul Karim, et al.
Published: (2012)
Value Stream Mapping and Flexible Manufacturing at Crown Holdings INC
by: Fraser, Dougal
Published: (2005)
by: Fraser, Dougal
Published: (2005)
Value Stream Mapping for Process Improvements in A Bakeware Company
by: Garzon, Juan Pablo
Published: (2006)
by: Garzon, Juan Pablo
Published: (2006)
Reducing Production Lead Time Through Value Stream Mapping
by: Esfandyari, Alireza
Published: (2008)
by: Esfandyari, Alireza
Published: (2008)
Reduction of work in process and manufacturing lead time using value stream mapping in the medical industry
by: Nor Najwafatima, Yusaini
Published: (2023)
by: Nor Najwafatima, Yusaini
Published: (2023)
Optimization of industrial matching grant application system in ump : a value stream mapping approach
by: Laili, Zulkepeli
Published: (2022)
by: Laili, Zulkepeli
Published: (2022)
Reducing Production Lead Time Through Value Stream Mapping Approach
by: Yap, Ai Kin
Published: (2008)
by: Yap, Ai Kin
Published: (2008)
Sustainability-oriented application of value
stream mapping: a review and classification
by: Yin Lee, Jocelyn Ke, et al.
Published: (2021)
by: Yin Lee, Jocelyn Ke, et al.
Published: (2021)
Sustainability-oriented application of value
stream mapping: a review and classification
by: Lee, Jocelyn Ke Yin, et al.
Published: (2021)
by: Lee, Jocelyn Ke Yin, et al.
Published: (2021)
The outlook of building information modeling for sustainable development
by: Chong, Heap Yih, et al.
Published: (2016)
by: Chong, Heap Yih, et al.
Published: (2016)
RUSTY BOLTS AND BROKEN VALVES: A STUDY ON THE PLANT TECHNOLOGY, SIZE, AND ORGANIZATIONAL STRUCTURE OF PLANT TURNAROUND MAINTENANCE IN MALAYSIAN PROCESS-BASED INDUSTRIES
by: Ghazali, Zulkipli, et al.
Published: (2009)
by: Ghazali, Zulkipli, et al.
Published: (2009)
Value stream mapping: a tool to design the future state map aligned with lean manufacturing principles
by: Esfandyari , Alireza, et al.
Published: (2006)
by: Esfandyari , Alireza, et al.
Published: (2006)
ErgoVSM: A Tool for Integrating Value Stream Mapping and Ergonomics in Manufacturing
by: Jarebrant, C., et al.
Published: (2016)
by: Jarebrant, C., et al.
Published: (2016)
Performance improvement through value stream mapping – a manufacturing case study
by: Bugvi, Salman Abubakar, et al.
Published: (2021)
by: Bugvi, Salman Abubakar, et al.
Published: (2021)
Lead time reduction in SME by using value stream mapping (VSM) technique
by: Farah Liyana, Hassan
Published: (2013)
by: Farah Liyana, Hassan
Published: (2013)
Improving productivity using value stream mapping (VSM) - a case study
by: Ahmad Nasser, Mohd Rose, et al.
Published: (2019)
by: Ahmad Nasser, Mohd Rose, et al.
Published: (2019)
Similar Items
-
Enhanced Value Stream Mapping for Improving Turnaround Process Efficiency in Oil and Gas Industry
by: Shou, Wenchi
Published: (2018) -
A cross-sector review on the use of value stream mapping
by: Shou, Wenchi, et al.
Published: (2017) -
Examining the critical success factors in the adoption of value stream mapping
by: Shou, W., et al.
Published: (2016) -
Enhancing turnaround maintenance in process plants through on-stream phased array corrosion mapping: a review
by: Tai, Jan Lean, et al.
Published: (2024) -
Application of lean production with value stream mapping to the blasting and coating industry
by: Shou, W., et al.
Published: (2017)