Little, J., Knights, P., & Topal, E. (2013). Integrated Optimization of Underground Mine Design and Scheduling. SAIMM.
Chicago Style (17th ed.) CitationLittle, J., P. Knights, and Erkan Topal. Integrated Optimization of Underground Mine Design and Scheduling. SAIMM, 2013.
MLA (9th ed.) CitationLittle, J., et al. Integrated Optimization of Underground Mine Design and Scheduling. SAIMM, 2013.
Warning: These citations may not always be 100% accurate.