Determining the probability distribution of rework costs in construction and engineering projects
Rework arises due to design errors, changes and omissions during design and has been found to contribute to 52% of a project’s cost overrun. The statistical characteristics of rework costs experienced from contract award in 276 construction and engineering projects were analysed. The skewness and ku...
| Main Authors: | Love, Peter, Sing, Michael |
|---|---|
| Format: | Journal Article |
| Published: |
Taylor & Francis
2013
|
| Subjects: | |
| Online Access: | http://hdl.handle.net/20.500.11937/3835 |
Similar Items
Evaluating cost taxonomies for information systems management
by: Irani, Z., et al.
Published: (2006)
by: Irani, Z., et al.
Published: (2006)
Determining the probability of project cost overruns
by: Love, Peter, et al.
Published: (2013)
by: Love, Peter, et al.
Published: (2013)
A system dynamics model for assessing the impacts of design errors in construction projects
by: Han, Sangwon, et al.
Published: (2013)
by: Han, Sangwon, et al.
Published: (2013)
Curbing rework in offshore projects: systemic classification of risks with dialogue and narratives
by: Love, Peter, et al.
Published: (2013)
by: Love, Peter, et al.
Published: (2013)
Quality costs in construction: Case of Qom monorail project in Iran
by: Jafari, Amirhosein, et al.
Published: (2013)
by: Jafari, Amirhosein, et al.
Published: (2013)
Comparative studies of cost accounting practices in Japan and Germany / Shinsuke Wada and Peter Kajüter
by: Wada, Shinsuke, et al.
Published: (2012)
by: Wada, Shinsuke, et al.
Published: (2012)
A typology of cost accounting practices based on activity-based costing - a strategic cost management approach / Gregory Wegmann
by: Wegmann, Gregory
Published: (2019)
by: Wegmann, Gregory
Published: (2019)
Design Error Costs in Construction Projects
by: Lopez, Robert, et al.
Published: (2012)
by: Lopez, Robert, et al.
Published: (2012)
Intricacies of overhead cost allocations and distortion in costing: a synthesis of the literature / Bülend Terzioglu
by: Terzioglu, Bülend
Published: (2012)
by: Terzioglu, Bülend
Published: (2012)
Accuracy in estimating project cost construction contingency - a statistical analysis
by: Baccarini, David
Published: (2004)
by: Baccarini, David
Published: (2004)
The latent causes of rework in floating production storage and offloading projects
by: Love, Peter, et al.
Published: (2014)
by: Love, Peter, et al.
Published: (2014)
Dynamic capabilities and target costing in Swedish publicly traded companies / Jan Alpenberg and D. Paul Scarbrough
by: Alpenberg, Jan, et al.
Published: (2013)
by: Alpenberg, Jan, et al.
Published: (2013)
The interplay between national culture and diffusion of activitybased costing: an Asia-Pacific perspective / Bülend Terzioglu and Elsie S. K. Chan
by: Bülend, Terzioglu, et al.
Published: (2014)
by: Bülend, Terzioglu, et al.
Published: (2014)
The maturing concept of estimating project cost contingency: A review
by: Baccarini, David
Published: (2006)
by: Baccarini, David
Published: (2006)
Design to cost in Siemens
- integrating EVA with product target costing
and life cycle costing
by: Cheng, Ge Fang Gloria
Published: (2006)
by: Cheng, Ge Fang Gloria
Published: (2006)
Implementation of target costing in Indonesia: the influence of dynamic capabilities, dysfunctional behaviour, and success factors in manufacturing companies / Grahita Chandrarin ... [et al.]
by: Chandrarin, Grahita, et al.
Published: (2019)
by: Chandrarin, Grahita, et al.
Published: (2019)
When ‘less is more’: The rationale for an adaptive toolbox to manage the risk and uncertainty of rework
by: Love, Peter, et al.
Published: (2022)
by: Love, Peter, et al.
Published: (2022)
Error culture and its impact on rework: An exploration of norms and practices in a transport mega-project
by: Love, Peter, et al.
Published: (2022)
by: Love, Peter, et al.
Published: (2022)
Target costing implementation and organizational capabilities: a research framework / Hussein Hamood, Normah Omar and Suzana Sulaiman
by: Hamood, Hussein, et al.
Published: (2013)
by: Hamood, Hussein, et al.
Published: (2013)
Estimating project cost continency - a model and exploration of research questions
by: Baccarini, David
Published: (2004)
by: Baccarini, David
Published: (2004)
Target costing practices: a review of literature / Hussein H. Hamood, Normah Omar and Suzana Sulaiman
by: Hamood, Hussein H., et al.
Published: (2011)
by: Hamood, Hussein H., et al.
Published: (2011)
The practice of life cycle cost in Malaysia construction industry: a review / Wan Nur Hamizah Wan Hassan, Norhanim Zakaria and Muhammad Azzam Ismail
by: Wan Hassan, Wan Nur Hamizah, et al.
Published: (2014)
by: Wan Hassan, Wan Nur Hamizah, et al.
Published: (2014)
Aero Repair and Overhaul Services at Rolls Royce Group Plc:
Application of Activity Based Costing
by: Vaithiyanathan, Shivany
Published: (2005)
by: Vaithiyanathan, Shivany
Published: (2005)
Empirical study on asymmetric cost behavior: analysis of the sticky costs of local public enterprises / Shoichiro Hosomi and Shohei Nagasawa
by: Hosomi, Shoichiro, et al.
Published: (2018)
by: Hosomi, Shoichiro, et al.
Published: (2018)
Does observability affect prosociality?
by: Bradley, Alex, et al.
Published: (2018)
by: Bradley, Alex, et al.
Published: (2018)
Implementation process and lessons learned in the determination of educational cost using modified activity-based costing (ABC) / Ruhanita Maelah ...[et al.]
by: Maelah, Ruhanita, et al.
Published: (2017)
by: Maelah, Ruhanita, et al.
Published: (2017)
Analysis, design & cost comparisons of simply supported and continuous bridges
by: Hasan Esmail, Ardal
Published: (2001)
by: Hasan Esmail, Ardal
Published: (2001)
A rework probability model: A quantitative assessment of rework occurrence in construction projects
by: Simpeh, E., et al.
Published: (2015)
by: Simpeh, E., et al.
Published: (2015)
Target costing: adoption and its relationships with competition intensity, intended strategy and firm size / Helmi Hammami ...[et al.]
by: Hammami, Helmi, et al.
Published: (2019)
by: Hammami, Helmi, et al.
Published: (2019)
High-grade Paleoproterozoic reworking in the southeastern Gawler Craton, South Australia
by: Dutch, R., et al.
Published: (2008)
by: Dutch, R., et al.
Published: (2008)
An empirical analysis of the profitability of Chinese Banks
by: Wang, Shaowen
Published: (2018)
by: Wang, Shaowen
Published: (2018)
Implementation of target costing in the Saudi Arabian food and beverages industry: the mediating role of supply chain management / Hussein Hussein Hamood Sharaf-Addin
by: Sharaf-Addin, Hussein Hussein Hamood
Published: (2021)
by: Sharaf-Addin, Hussein Hussein Hamood
Published: (2021)
The determinants of capital structure for construction firms listed in Bursa Malaysia / Muhammad Imran Arif Mohd Nasir
by: Mohd Nasir, Muhammad Imran Arif
Published: (2017)
by: Mohd Nasir, Muhammad Imran Arif
Published: (2017)
The Amoebic Growth of Project Costs
by: Eden, C., et al.
Published: (2005)
by: Eden, C., et al.
Published: (2005)
A cost function for Australia's railways
by: Wills-Johnson, Nick
Published: (2009)
by: Wills-Johnson, Nick
Published: (2009)
Tax avoidance and firm value: evidence from the UK listed company
by: Wang, Zijue
Published: (2018)
by: Wang, Zijue
Published: (2018)
Reducing Production Lead Time Through Value Stream Mapping
by: Esfandyari, Alireza
Published: (2008)
by: Esfandyari, Alireza
Published: (2008)
Dynamic Value Stream Mapping for production lead time improvement using Fuzzy Triangular analysis
by: Manoharan, Thulasi
Published: (2023)
by: Manoharan, Thulasi
Published: (2023)
Determinant of trade costs and their impact on trade flows in ASEAN-5
by: Ramli, Mohd. Khairul Rafiz
Published: (2013)
by: Ramli, Mohd. Khairul Rafiz
Published: (2013)
Firms' financial performance from intellectual capital and capital structure perspectives: A comparative analysis into three industries in Malaysia / Hapsah@Kalthom S. Mohammad
by: S. Mohammad, Hapsah@Kalthom
Published: (2018)
by: S. Mohammad, Hapsah@Kalthom
Published: (2018)
Similar Items
-
Evaluating cost taxonomies for information systems management
by: Irani, Z., et al.
Published: (2006) -
Determining the probability of project cost overruns
by: Love, Peter, et al.
Published: (2013) -
A system dynamics model for assessing the impacts of design errors in construction projects
by: Han, Sangwon, et al.
Published: (2013) -
Curbing rework in offshore projects: systemic classification of risks with dialogue and narratives
by: Love, Peter, et al.
Published: (2013) -
Quality costs in construction: Case of Qom monorail project in Iran
by: Jafari, Amirhosein, et al.
Published: (2013)