Difficulties in TBM Tunneling in adverse rock mass with Case study (Ghomrud water transfer tunnel)

Bibliographic Details
Main Authors: Sharifzadeh, Mostafa, Shariar, K., Torkamani Ghotb, A., Hemmati Shaabani, A.
Other Authors: Sadagiani M. H
Format: Conference Paper
Published: n/a 2006
Online Access:http://hdl.handle.net/20.500.11937/38077
_version_ 1848755221584412672
author Sharifzadeh, Mostafa
Shariar, K.
Torkamani Ghotb, A.
Hemmati Shaabani, A.
author2 Sadagiani M. H
author_facet Sadagiani M. H
Sharifzadeh, Mostafa
Shariar, K.
Torkamani Ghotb, A.
Hemmati Shaabani, A.
author_sort Sharifzadeh, Mostafa
building Curtin Institutional Repository
collection Online Access
first_indexed 2025-11-14T08:52:52Z
format Conference Paper
id curtin-20.500.11937-38077
institution Curtin University Malaysia
institution_category Local University
last_indexed 2025-11-14T08:52:52Z
publishDate 2006
publisher n/a
recordtype eprints
repository_type Digital Repository
spelling curtin-20.500.11937-380772018-12-14T00:55:13Z Difficulties in TBM Tunneling in adverse rock mass with Case study (Ghomrud water transfer tunnel) Sharifzadeh, Mostafa Shariar, K. Torkamani Ghotb, A. Hemmati Shaabani, A. Sadagiani M. H 2006 Conference Paper http://hdl.handle.net/20.500.11937/38077 n/a restricted
spellingShingle Sharifzadeh, Mostafa
Shariar, K.
Torkamani Ghotb, A.
Hemmati Shaabani, A.
Difficulties in TBM Tunneling in adverse rock mass with Case study (Ghomrud water transfer tunnel)
title Difficulties in TBM Tunneling in adverse rock mass with Case study (Ghomrud water transfer tunnel)
title_full Difficulties in TBM Tunneling in adverse rock mass with Case study (Ghomrud water transfer tunnel)
title_fullStr Difficulties in TBM Tunneling in adverse rock mass with Case study (Ghomrud water transfer tunnel)
title_full_unstemmed Difficulties in TBM Tunneling in adverse rock mass with Case study (Ghomrud water transfer tunnel)
title_short Difficulties in TBM Tunneling in adverse rock mass with Case study (Ghomrud water transfer tunnel)
title_sort difficulties in tbm tunneling in adverse rock mass with case study (ghomrud water transfer tunnel)
url http://hdl.handle.net/20.500.11937/38077