Implementing a New Heuristic Approach to the Underground Mine Stope Layout Problem

Underground mine planning requires an optimal stope layout as a prerequisite for the definition of an optimal production schedule. The procedure to generate an optimal stope layout considers an orebody model and economic parameters as inputs. Itevaluates all possible combinations of mining blocks an...

Full description

Bibliographic Details
Main Authors: Sandanayake, D., Topal, Erkan, Asad, Mohammad Waqar
Other Authors: R. Dimitrakopoulos
Format: Conference Paper
Published: The Australasian Institute of Mining and Metallurgy 2014
Online Access:http://hdl.handle.net/20.500.11937/33099
_version_ 1848753851851603968
author Sandanayake, D.
Topal, Erkan
Asad, Mohammad Waqar
author2 R. Dimitrakopoulos
author_facet R. Dimitrakopoulos
Sandanayake, D.
Topal, Erkan
Asad, Mohammad Waqar
author_sort Sandanayake, D.
building Curtin Institutional Repository
collection Online Access
description Underground mine planning requires an optimal stope layout as a prerequisite for the definition of an optimal production schedule. The procedure to generate an optimal stope layout considers an orebody model and economic parameters as inputs. Itevaluates all possible combinations of mining blocks and creates a set of stopes by satisfying the physical mining and geotechnical constraints. Thus, the procedure is computationally complex, and generating a solution to the problem is a challenge. This paper presents an implementation of a new heuristic algorithm that solves the stope layout problem. In two case studies, the algorithm achieves 11.2 per cent and 22.5 per cent superior solutions to the industrially available maximum value neighbourhood approach.
first_indexed 2025-11-14T08:31:05Z
format Conference Paper
id curtin-20.500.11937-33099
institution Curtin University Malaysia
institution_category Local University
last_indexed 2025-11-14T08:31:05Z
publishDate 2014
publisher The Australasian Institute of Mining and Metallurgy
recordtype eprints
repository_type Digital Repository
spelling curtin-20.500.11937-330992017-01-30T13:35:00Z Implementing a New Heuristic Approach to the Underground Mine Stope Layout Problem Sandanayake, D. Topal, Erkan Asad, Mohammad Waqar R. Dimitrakopoulos Underground mine planning requires an optimal stope layout as a prerequisite for the definition of an optimal production schedule. The procedure to generate an optimal stope layout considers an orebody model and economic parameters as inputs. Itevaluates all possible combinations of mining blocks and creates a set of stopes by satisfying the physical mining and geotechnical constraints. Thus, the procedure is computationally complex, and generating a solution to the problem is a challenge. This paper presents an implementation of a new heuristic algorithm that solves the stope layout problem. In two case studies, the algorithm achieves 11.2 per cent and 22.5 per cent superior solutions to the industrially available maximum value neighbourhood approach. 2014 Conference Paper http://hdl.handle.net/20.500.11937/33099 The Australasian Institute of Mining and Metallurgy restricted
spellingShingle Sandanayake, D.
Topal, Erkan
Asad, Mohammad Waqar
Implementing a New Heuristic Approach to the Underground Mine Stope Layout Problem
title Implementing a New Heuristic Approach to the Underground Mine Stope Layout Problem
title_full Implementing a New Heuristic Approach to the Underground Mine Stope Layout Problem
title_fullStr Implementing a New Heuristic Approach to the Underground Mine Stope Layout Problem
title_full_unstemmed Implementing a New Heuristic Approach to the Underground Mine Stope Layout Problem
title_short Implementing a New Heuristic Approach to the Underground Mine Stope Layout Problem
title_sort implementing a new heuristic approach to the underground mine stope layout problem
url http://hdl.handle.net/20.500.11937/33099