Implementation of Optimized Soil Improvement Techniques for a Giga Project
One of the world's largest ground improvement projects that has ever been carried out in one phase by a single specialist ground improvement contractor is the 2,600,000 m2 King Abdulla University of Science and Technology in Jeddah. What has made this project perhaps one of the most unique grou...
| Main Authors: | Hamidi, Babak, Varaksin, S., Nikraz, Hamid |
|---|---|
| Other Authors: | Anand Puppala |
| Format: | Conference Paper |
| Published: |
American Society of Civil Engineers
2010
|
| Online Access: | http://cedb.asce.org/cgi/WWWdisplay.cgi?261181 http://hdl.handle.net/20.500.11937/32806 |
Similar Items
Soil improvement of a very tick and large fill by dynamic compaction
by: Hamidi, Babak, et al.
Published: (2010)
by: Hamidi, Babak, et al.
Published: (2010)
A review on impact oriented ground improvement techniques
by: Hamidi, Babak, et al.
Published: (2009)
by: Hamidi, Babak, et al.
Published: (2009)
A case study of vibration monitoring in a dynamic compaction project
by: Hamidi, Babak, et al.
Published: (2011)
by: Hamidi, Babak, et al.
Published: (2011)
Correlations between CPT and PMT at a Dynamic Compaction Project
by: Hamidi, Babak, et al.
Published: (2010)
by: Hamidi, Babak, et al.
Published: (2010)
The Effectiveness of Vibration Reduction Trenches in a Dynamic Replacement Project
by: Hamidi, Babak, et al.
Published: (2012)
by: Hamidi, Babak, et al.
Published: (2012)
Treatment of hydraulically reclaimed port project by dynamic compaction
by: Hamidi, Babak, et al.
Published: (2010)
by: Hamidi, Babak, et al.
Published: (2010)
Dynamic replacement for constructing embankments and walls on soft soil
by: Hamidi, Babak, et al.
Published: (2010)
by: Hamidi, Babak, et al.
Published: (2010)
Application of dynamic compaction in Port of Ras Laffan Expansion Project
by: Hamidi, Babak, et al.
Published: (2010)
by: Hamidi, Babak, et al.
Published: (2010)
Predicting Soil Parameters by Modelling Dynamic Compaction Induced Subsidence
by: Hamidi, Babak, et al.
Published: (2010)
by: Hamidi, Babak, et al.
Published: (2010)
Arching in Ground Improvement
by: Hamidi, Babak, et al.
Published: (2009)
by: Hamidi, Babak, et al.
Published: (2009)
Application of Dynamic Compaction in a Project with Smart Acceptance Criteria
by: Hamidi, Babak, et al.
Published: (2012)
by: Hamidi, Babak, et al.
Published: (2012)
Ground improvement acceptance criteria
by: Hamidi, Babak, et al.
Published: (2011)
by: Hamidi, Babak, et al.
Published: (2011)
Offshore ground improvement records
by: Hamidi, Babak, et al.
Published: (2013)
by: Hamidi, Babak, et al.
Published: (2013)
A Case of Vibro Compaction Vibration Monitoring in a Reclaimed Site
by: Hamidi, Babak, et al.
Published: (2011)
by: Hamidi, Babak, et al.
Published: (2011)
Relative density concept is not a reliable criterion
by: Hamidi, Babak, et al.
Published: (2013)
by: Hamidi, Babak, et al.
Published: (2013)
Application of Dynamic Replacement in a Steel Pipe Factory
by: Hamidi, Babak, et al.
Published: (2011)
by: Hamidi, Babak, et al.
Published: (2011)
Dynamic Compaction Vibration Monitoring in a Saturated Site
by: Hamidi, Babak, et al.
Published: (2011)
by: Hamidi, Babak, et al.
Published: (2011)
The treatment of a loose submerged subgrade using dynamic compaction
by: Hamidi, Babak, et al.
Published: (2011)
by: Hamidi, Babak, et al.
Published: (2011)
Treatment of thick saturated loose sub-grades using dynamic compaction
by: Hamidi, Babak, et al.
Published: (2010)
by: Hamidi, Babak, et al.
Published: (2010)
The Application of Dynamic Compaction to HFO Tanks
by: Hamidi, Babak, et al.
Published: (2011)
by: Hamidi, Babak, et al.
Published: (2011)
Predicting Menard Modulus using Dynamic Compaction Induced Subsidence
by: Hamidi, Babak, et al.
Published: (2011)
by: Hamidi, Babak, et al.
Published: (2011)
Advances in dynamic compaction
by: Hamidi, Babak, et al.
Published: (2011)
by: Hamidi, Babak, et al.
Published: (2011)
Application of Dynamic Surcharging for Construction of Tanks on Reclaimed Ground
by: Hamidi, Babak, et al.
Published: (2011)
by: Hamidi, Babak, et al.
Published: (2011)
Relative density correlations are not reliable criteria
by: Hamidi, Babak, et al.
Published: (2013)
by: Hamidi, Babak, et al.
Published: (2013)
Dynamic Compaction for Treating Millions of Square Meters of Sand
by: Hamidi, Babak, et al.
Published: (2011)
by: Hamidi, Babak, et al.
Published: (2011)
Ground Improvement in Deep Waters Using Dynamic Replacement
by: Hamidi, Babak, et al.
Published: (2010)
by: Hamidi, Babak, et al.
Published: (2010)
The Application of Dynamic Compaction on Marjan Island
by: Hamidi, Babak, et al.
Published: (2012)
by: Hamidi, Babak, et al.
Published: (2012)
Application of Dynamic Compaction in Reclaimed Roads
by: Hamidi, Babak, et al.
Published: (2012)
by: Hamidi, Babak, et al.
Published: (2012)
Construction of Raw Sugar Silos Using Dynamic Replacement
by: Hamidi, Babak, et al.
Published: (2012)
by: Hamidi, Babak, et al.
Published: (2012)
Distinguished ground improvement projects by dynamic compaction or dynamic replacement
by: Hamidi, Babak
Published: (2014)
by: Hamidi, Babak
Published: (2014)
Correlation between PMT and CPT after dynamic compaction in reclaimed calcareous sand
by: Hamidi, B., et al.
Published: (2015)
by: Hamidi, B., et al.
Published: (2015)
Bionomics of Malaysian horseshoe crabs tachypleus gigas
by: B, Akbar John, et al.
Published: (2011)
by: B, Akbar John, et al.
Published: (2011)
Distribution of Zn in the different parts of Tachypeus gigas
by: Yap, Chee Kong, et al.
Published: (2009)
by: Yap, Chee Kong, et al.
Published: (2009)
Isolation by the 5' anchored PCR technique and characterization of eighteen microsatellite loci in horseshoe crab (Tachypleus gigas)
by: Liew, Pui Ling, et al.
Published: (2013)
by: Liew, Pui Ling, et al.
Published: (2013)
Tachypleus gigas mortality due biomedical bleeding process
by: John, Akbar, et al.
Published: (2011)
by: John, Akbar, et al.
Published: (2011)
Determination of nutritional value of tachypleus gigas (horseshoe crab)
by: Nashrin Iszhan, Ishak, et al.
Published: (2021)
by: Nashrin Iszhan, Ishak, et al.
Published: (2021)
Blood cell histology of horseshoe crab, Tachypleus gigas.
by: Shakibazadeh, Shahram, et al.
Published: (2013)
by: Shakibazadeh, Shahram, et al.
Published: (2013)
Heavy metals in horseshoe crab egg (Tachypleus gigas)
by: Wan Nawang, Wan Nur Fatin Syafiqah
Published: (2012)
by: Wan Nawang, Wan Nur Fatin Syafiqah
Published: (2012)
Hemolymph profiling reveals post bleeding stress in Tachypleus gigas
by: John, Akbar, et al.
Published: (2019)
by: John, Akbar, et al.
Published: (2019)
Infectious diseases in Tachypleus gigas during captive breeding and rearing
by: John, Akbar, et al.
Published: (2019)
by: John, Akbar, et al.
Published: (2019)
Similar Items
-
Soil improvement of a very tick and large fill by dynamic compaction
by: Hamidi, Babak, et al.
Published: (2010) -
A review on impact oriented ground improvement techniques
by: Hamidi, Babak, et al.
Published: (2009) -
A case study of vibration monitoring in a dynamic compaction project
by: Hamidi, Babak, et al.
Published: (2011) -
Correlations between CPT and PMT at a Dynamic Compaction Project
by: Hamidi, Babak, et al.
Published: (2010) -
The Effectiveness of Vibration Reduction Trenches in a Dynamic Replacement Project
by: Hamidi, Babak, et al.
Published: (2012)