Legal approach on assessment of contractors' entitlement to extension of time

Delay is acknowledged as the most common, costly, complex and risky problem encountered inconstruction projects. Different project scheduling and planning techniques would have differentapproaches of assessment of extension of time (EOT). Hence, this research aims to (a) review the legalpositions in...

Full description

Bibliographic Details
Main Authors: Chong, Heap Yih, Leong, Y.
Format: Journal Article
Published: Academic Journals 2012
Subjects:
Online Access:http://hdl.handle.net/20.500.11937/3179
_version_ 1848744160381632512
author Chong, Heap Yih
Leong, Y.
author_facet Chong, Heap Yih
Leong, Y.
author_sort Chong, Heap Yih
building Curtin Institutional Repository
collection Online Access
description Delay is acknowledged as the most common, costly, complex and risky problem encountered inconstruction projects. Different project scheduling and planning techniques would have differentapproaches of assessment of extension of time (EOT). Hence, this research aims to (a) review the legalpositions in Malaysia with regards to EOT assessment and (b) evaluate the contractors ‘entitlement toEOT from case studies in Malaysia. Literature study was carried out for the first objective whereas tworeal-case studies on different delay analysis methods were investigated later. Subsequently, three legalexperts of construction claims were interviewed. The literature showed that the courts and arbitrationtribunals have not generally gone into great depths for EOT assessment and delay analysis. Theexperts, considering the second objective, delivered a unanimous opinion that both cases were weak interms of the entitlement for EOT due to the issue of concurrency of the delaying events and the lack ofaccuracy of the work programme.
first_indexed 2025-11-14T05:57:03Z
format Journal Article
id curtin-20.500.11937-3179
institution Curtin University Malaysia
institution_category Local University
last_indexed 2025-11-14T05:57:03Z
publishDate 2012
publisher Academic Journals
recordtype eprints
repository_type Digital Repository
spelling curtin-20.500.11937-31792017-02-28T01:29:13Z Legal approach on assessment of contractors' entitlement to extension of time Chong, Heap Yih Leong, Y. delay legal perspective construction extension of time (EOT) Project management Delay is acknowledged as the most common, costly, complex and risky problem encountered inconstruction projects. Different project scheduling and planning techniques would have differentapproaches of assessment of extension of time (EOT). Hence, this research aims to (a) review the legalpositions in Malaysia with regards to EOT assessment and (b) evaluate the contractors ‘entitlement toEOT from case studies in Malaysia. Literature study was carried out for the first objective whereas tworeal-case studies on different delay analysis methods were investigated later. Subsequently, three legalexperts of construction claims were interviewed. The literature showed that the courts and arbitrationtribunals have not generally gone into great depths for EOT assessment and delay analysis. Theexperts, considering the second objective, delivered a unanimous opinion that both cases were weak interms of the entitlement for EOT due to the issue of concurrency of the delaying events and the lack ofaccuracy of the work programme. 2012 Journal Article http://hdl.handle.net/20.500.11937/3179 Academic Journals restricted
spellingShingle delay
legal perspective
construction
extension of time (EOT)
Project management
Chong, Heap Yih
Leong, Y.
Legal approach on assessment of contractors' entitlement to extension of time
title Legal approach on assessment of contractors' entitlement to extension of time
title_full Legal approach on assessment of contractors' entitlement to extension of time
title_fullStr Legal approach on assessment of contractors' entitlement to extension of time
title_full_unstemmed Legal approach on assessment of contractors' entitlement to extension of time
title_short Legal approach on assessment of contractors' entitlement to extension of time
title_sort legal approach on assessment of contractors' entitlement to extension of time
topic delay
legal perspective
construction
extension of time (EOT)
Project management
url http://hdl.handle.net/20.500.11937/3179