A Probabilistic Method for Forensic Cost Estimating of Infrastructure Projects
To determine the existence of overpricing in infrastructure projects a deterministic approach has been typically used by the Brazilian Federal Police. Yet, Judges have often found it too difficult to determine if overpricing had occurred as contractors have tended to claim their projects were ‘uniqu...
| Main Authors: | Signor, R., Love, Peter, Olatunji, Oluwole, Marchiori, F., Gripp, W. |
|---|---|
| Format: | Journal Article |
| Published: |
Elsevier
2016
|
| Online Access: | http://hdl.handle.net/20.500.11937/29015 |
Similar Items
Determining Overpricing in Brazilian Infrastructure Projects: A Forensic Approach
by: Signor, R., et al.
Published: (2016)
by: Signor, R., et al.
Published: (2016)
Collusive Bidding in Brazilian Infrastructure Projects
by: Signor, R., et al.
Published: (2017)
by: Signor, R., et al.
Published: (2017)
Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation
by: Love, Peter, et al.
Published: (2016)
by: Love, Peter, et al.
Published: (2016)
Overruns in Transport Infrastructure Projects: A View from the Inside Out
by: Love, Peter, et al.
Published: (2014)
by: Love, Peter, et al.
Published: (2014)
Cost profiling of water infrastructure projects
by: Love, Peter, et al.
Published: (2018)
by: Love, Peter, et al.
Published: (2018)
Statistical characteristics of cost contingency in water infrastructure projects
by: Baccarini, David, et al.
Published: (2014)
by: Baccarini, David, et al.
Published: (2014)
Rework in Civil Infrastructure Projects: Determination of Cost Predictors
by: Love, Peter, et al.
Published: (2010)
by: Love, Peter, et al.
Published: (2010)
Probabilistic assessment of design error costs
by: Love, Peter, et al.
Published: (2014)
by: Love, Peter, et al.
Published: (2014)
A comparative analysis of tender sums and final costs of public construction and supply projects in Nigeria
by: Olatunji, Oluwole
Published: (2008)
by: Olatunji, Oluwole
Published: (2008)
Off the rails: The cost performance of infrastructure rail projects
by: Love, Peter, et al.
Published: (2017)
by: Love, Peter, et al.
Published: (2017)
Forensic Project Management: Simulation Modelling of Rework in Construction Projects
by: Love, Peter
Published: (2009)
by: Love, Peter
Published: (2009)
Delay causations in marine infrastructures, a review
by: Karami, H., et al.
Published: (2018)
by: Karami, H., et al.
Published: (2018)
Cost performance of public infrastructure projects: the nemesis and nirvana of change-orders
by: Love, Peter, et al.
Published: (2017)
by: Love, Peter, et al.
Published: (2017)
Virtual reality and estimating practice: A software selection model for estimating
by: Olatunji, Oluwole
Published: (2011)
by: Olatunji, Oluwole
Published: (2011)
Causal relationship between material price fluctuation and project’s outturn costs
by: Olatunji, Oluwole, et al.
Published: (2018)
by: Olatunji, Oluwole, et al.
Published: (2018)
Moving Beyond Optimism Bias and Strategic Misrepresentation: An Explanation for Social Infrastructure Project Cost Overruns
by: Love, Peter, et al.
Published: (2012)
by: Love, Peter, et al.
Published: (2012)
A Comparative Analysis of 2D Computer-Aided Estimating (CAE) and BIM Estimating Procedures
by: Olatunji, Oluwole, et al.
Published: (2010)
by: Olatunji, Oluwole, et al.
Published: (2010)
Scaffolding industry knowledge on errors in construction estimates
by: Olatunji, Oluwole
Published: (2011)
by: Olatunji, Oluwole
Published: (2011)
Modelling the costs of corporate implementation of building information modelling
by: Olatunji, Oluwole
Published: (2011)
by: Olatunji, Oluwole
Published: (2011)
The impact of oil price regimes on construction costs in Nigeria
by: Olatunji, Oluwole
Published: (2010)
by: Olatunji, Oluwole
Published: (2010)
Estimating in geometric 3D CAD
by: Olatunji, Oluwole, et al.
Published: (2015)
by: Olatunji, Oluwole, et al.
Published: (2015)
Debunking fake news in a post-truth era: The plausible untruths of cost underestimation in transport infrastructure projects
by: Love, Peter, et al.
Published: (2018)
by: Love, Peter, et al.
Published: (2018)
Overruns in Transportation Infrastructure Projects
by: Love, Peter, et al.
Published: (2014)
by: Love, Peter, et al.
Published: (2014)
Perspectives on modelling bim-enabled estimating practices
by: Olatunji, Oluwole, et al.
Published: (2014)
by: Olatunji, Oluwole, et al.
Published: (2014)
Building Cost Planning for the Design Team
by: Smith, J., et al.
Published: (2016)
by: Smith, J., et al.
Published: (2016)
Toward a Systemic View to Cost Overrun Causation in Infrastructure Projects: A Review and Implications for Research
by: Ahiaga-Dagbui, D., et al.
Published: (2016)
by: Ahiaga-Dagbui, D., et al.
Published: (2016)
'Plugging the gaps' between optimum bias and strategic misrepresentation and infrastructure cost overruns
by: Love, Peter
Published: (2011)
by: Love, Peter
Published: (2011)
Modelling organizations' structural adjustment to BIM adoption: a pilot study on estimating organisations
by: Olatunji, Oluwole
Published: (2011)
by: Olatunji, Oluwole
Published: (2011)
Causations of Failure in Megaprojects: A Case Study of the Ajaokuta Steel Plant Project
by: Olatunji, Oluwole
Published: (2018)
by: Olatunji, Oluwole
Published: (2018)
Probabilistic properties of GNSS integer ambiguity estimation.
by: Teunissen, Peter
Published: (2000)
by: Teunissen, Peter
Published: (2000)
Dynamic Modeling of Workforce Planning for Infrastructure Projects
by: Sing, M., et al.
Published: (2016)
by: Sing, M., et al.
Published: (2016)
Risk/Reward Compensation Model for Civil Engineering Infrastructure Alliance Projects
by: Love, Peter, et al.
Published: (2011)
by: Love, Peter, et al.
Published: (2011)
Estimating construction contingency: Accommodating the potential for cost overruns in road construction projects
by: Love, Peter, et al.
Published: (2015)
by: Love, Peter, et al.
Published: (2015)
Forensic Project Management: An Exploratory Examination of the Casual Behavior of Design-Induced Rework
by: Love, Peter, et al.
Published: (2008)
by: Love, Peter, et al.
Published: (2008)
Probabilistic Aggregation of Oil and Gas Field Resource Estimates and Project Portfolio Analysis
by: van Elk, J., et al.
Published: (2010)
by: van Elk, J., et al.
Published: (2010)
Cost Overruns in Hydrocarbon Megaprojects: A Critical Review and Implications for Research
by: Olaniran, Olugbenda Jide, et al.
Published: (2015)
by: Olaniran, Olugbenda Jide, et al.
Published: (2015)
Auto-generated site layout: an integrated approach to real-time sensing of temporary facilities in infrastructure projects
by: Akanmu, A., et al.
Published: (2015)
by: Akanmu, A., et al.
Published: (2015)
Systemic Modelling of Design Error Causation in Social Infrastructure Projects
by: Love, Peter, et al.
Published: (2011)
by: Love, Peter, et al.
Published: (2011)
Impact of the Capital Market Collapse on Public-Private Partnership Infrastructure Projects
by: Regan, M., et al.
Published: (2011)
by: Regan, M., et al.
Published: (2011)
Chaos Theory: Implications for Cost Overrun Research in Hydrocarbon Megaprojects
by: Olaniran, O., et al.
Published: (2017)
by: Olaniran, O., et al.
Published: (2017)
Similar Items
-
Determining Overpricing in Brazilian Infrastructure Projects: A Forensic Approach
by: Signor, R., et al.
Published: (2016) -
Collusive Bidding in Brazilian Infrastructure Projects
by: Signor, R., et al.
Published: (2017) -
Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation
by: Love, Peter, et al.
Published: (2016) -
Overruns in Transport Infrastructure Projects: A View from the Inside Out
by: Love, Peter, et al.
Published: (2014) -
Cost profiling of water infrastructure projects
by: Love, Peter, et al.
Published: (2018)