Strategies to assist in obtaining an optimal solution for an underground mine planning problem using Mixed Integer Programming
Mixed Integer Programming (MIP) models are recognised as possessing the ability to optimise underground mine planning. However, MIP's use for optimising underground mine planning has often been restricted to problems of certain sizes and/or simplicity. This is because the number of variables an...
| Main Authors: | Little, J., Topal, Erkan |
|---|---|
| Format: | Journal Article |
| Published: |
INDERSIENCE
2011
|
| Online Access: | http://hdl.handle.net/20.500.11937/27503 |
Similar Items
A new mathematical programming model for production schedule optimisation in underground mining operations
by: Nehring, M., et al.
Published: (2010)
by: Nehring, M., et al.
Published: (2010)
Integrated Optimization of Underground Mine Design and Scheduling
by: Little, J, et al.
Published: (2013)
by: Little, J, et al.
Published: (2013)
A new open-pit mine planning optimization method using block aggregation and integer programming
by: Mai, N., et al.
Published: (2018)
by: Mai, N., et al.
Published: (2018)
A Mixed Integer Programming Approach
for Transitioning from Open-pit to
Underground Mining
by: Chung, Joyce Sze Yee
Published: (2020)
by: Chung, Joyce Sze Yee
Published: (2020)
Transition from open-pit to underground – using Integer Programming considering grade uncertainty
by: Chung, Joyce Sze Yee, et al.
Published: (2015)
by: Chung, Joyce Sze Yee, et al.
Published: (2015)
Optimising the long term mine landform progression and truck hour schedule in a large scale open pit mine using mixed integer programming
by: Li, Y., et al.
Published: (2018)
by: Li, Y., et al.
Published: (2018)
Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming
by: Li, Y, et al.
Published: (2014)
by: Li, Y, et al.
Published: (2014)
Optimisation of waste rock placement using mixed integer programming
by: Li, Y., et al.
Published: (2014)
by: Li, Y., et al.
Published: (2014)
Waste rock dumping optimisation using mixed integer programming (MIP)
by: Li, Yu, et al.
Published: (2013)
by: Li, Yu, et al.
Published: (2013)
Implementing a New Heuristic Approach to the Underground Mine Stope Layout Problem
by: Sandanayake, D., et al.
Published: (2014)
by: Sandanayake, D., et al.
Published: (2014)
An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
Where to Make the Transition from Open-pit to Underground?: Using Integer Programming
by: Chung, J., et al.
Published: (2016)
by: Chung, J., et al.
Published: (2016)
Developments in Mine Design, Planning and Scheduling in Open Cut Mining
by: Saydam, S., et al.
Published: (2012)
by: Saydam, S., et al.
Published: (2012)
Determination of the transition Point from Open Pit to Underground Mining
by: Chung, J., et al.
Published: (2016)
by: Chung, J., et al.
Published: (2016)
Integrated short and medium term underground mine production scheduling
by: Nehring, M., et al.
Published: (2012)
by: Nehring, M., et al.
Published: (2012)
The future of underground mine planning in the era of machine learning: Opportunities for engineering robustness and flexibility
by: Chimunhu, Prosper, et al.
Published: (2024)
by: Chimunhu, Prosper, et al.
Published: (2024)
Illumination of parameter contributions on uneven break phenomenon in underground stoping mines
by: Jang, Hyong Doo, et al.
Published: (2016)
by: Jang, Hyong Doo, et al.
Published: (2016)
A heuristic approach to optimal design of an underground mine stope layout
by: Sandanayake, D., et al.
Published: (2015)
by: Sandanayake, D., et al.
Published: (2015)
Designing an optimal stope layout for underground mining based on a heuristic algorithm
by: Sandanayake, D., et al.
Published: (2015)
by: Sandanayake, D., et al.
Published: (2015)
Mining optimal item packages using mixed integer programming
by: Achuthan, Narasimaha, et al.
Published: (2004)
by: Achuthan, Narasimaha, et al.
Published: (2004)
Using Artificial Neural Networks (ANNs) to Predict Stope Overbreak at Plutonic Underground Gold Mine
by: Boxwell, D., et al.
Published: (2014)
by: Boxwell, D., et al.
Published: (2014)
Implementation and comparison of four stope boundary optimization algorithms in an existing underground mine
by: Erdogan, G., et al.
Published: (2017)
by: Erdogan, G., et al.
Published: (2017)
Optimum waste dump planning using Mixed Integer Programming (MIP)
by: Li, Yu
Published: (2014)
by: Li, Yu
Published: (2014)
Decomposition techniques with mixed integer programming and heuristics for home healthcare planning
by: Laesanklang, Wasakorn, et al.
Published: (2017)
by: Laesanklang, Wasakorn, et al.
Published: (2017)
Risk-based evaluation for underground mine planning
by: Maybee, Bryan, et al.
Published: (2011)
by: Maybee, Bryan, et al.
Published: (2011)
Dilution prediction in underground open stope mining using gene expression programming and backpropagation artificial neural network algorithms
by: Chimunhu, Prosper, et al.
Published: (2025)
by: Chimunhu, Prosper, et al.
Published: (2025)
Underground Blasting Optimization by Artificial Intelligence Techniques
by: Jang, Hyong Doo, et al.
Published: (2013)
by: Jang, Hyong Doo, et al.
Published: (2013)
Application of predictive data mining to create mine plan flexibility in the face of geological uncertainty
by: Ajak, A., et al.
Published: (2017)
by: Ajak, A., et al.
Published: (2017)
A two-stage stochastic mixed-integer program modelling and hybrid solution approach to portfolio selection problems
by: He, Fang, et al.
Published: (2014)
by: He, Fang, et al.
Published: (2014)
A review of soft computing technology applications in several mining problems
by: Jang, H., et al.
Published: (2014)
by: Jang, H., et al.
Published: (2014)
Strategic mine planning model using network flow model and real case application
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
Development of Novel Hybrid Intelligent Predictive Models for Dilution Prediction in Underground Sub-level Mining
by: Chimunhu, Prosper, et al.
Published: (2024)
by: Chimunhu, Prosper, et al.
Published: (2024)
Planning and scheduling operating rooms with mix integer programming and meta-heuristic method
by: Askarizadeh, Mehdi, et al.
Published: (2018)
by: Askarizadeh, Mehdi, et al.
Published: (2018)
Operating rooms planning and scheduling with mix integer programming and meta-heuristic method
by: Askarizadeh, Mehdi, et al.
Published: (2017)
by: Askarizadeh, Mehdi, et al.
Published: (2017)
A mixed-integer programming model for the replacement strategy of an egg farm
by: Leow, S. K.
Published: (1987)
by: Leow, S. K.
Published: (1987)
Mixed integer programming with decomposition to solve a workforce scheduling and routing problem
by: Laesanklang, Wasakorn, et al.
Published: (2015)
by: Laesanklang, Wasakorn, et al.
Published: (2015)
New approach for estimating total mining costs in surface coal mines
by: Shafiee, S., et al.
Published: (2012)
by: Shafiee, S., et al.
Published: (2012)
Robust, flexible and operational mine design strategies
by: Groeneveld, Benjamin James, et al.
Published: (2012)
by: Groeneveld, Benjamin James, et al.
Published: (2012)
A new risk-based optimisation method for the iron ore production scheduling using stochastic integer programming
by: Mai, N., et al.
Published: (2018)
by: Mai, N., et al.
Published: (2018)
Extended decomposition for mixed integer programming to solve a workforce scheduling and routing problem
by: Laesanklang, Wasakorn, et al.
Published: (2015)
by: Laesanklang, Wasakorn, et al.
Published: (2015)
Similar Items
-
A new mathematical programming model for production schedule optimisation in underground mining operations
by: Nehring, M., et al.
Published: (2010) -
Integrated Optimization of Underground Mine Design and Scheduling
by: Little, J, et al.
Published: (2013) -
A new open-pit mine planning optimization method using block aggregation and integer programming
by: Mai, N., et al.
Published: (2018) -
A Mixed Integer Programming Approach
for Transitioning from Open-pit to
Underground Mining
by: Chung, Joyce Sze Yee
Published: (2020) -
Transition from open-pit to underground – using Integer Programming considering grade uncertainty
by: Chung, Joyce Sze Yee, et al.
Published: (2015)