Techno-economic assessment of stripping modifications in an ammonia-based post-combustion capture process

The energy penalty associated with solvent regeneration accounts for the largest part of overall energy consumption in aqueous ammonia (NH3)-based post-combustion capture (PCC) processes. While extensive research focus on the process improvements to reduce the energy burden of solvent regeneration,...

Full description

Bibliographic Details
Main Authors: Li, K., Yu, H., Feron, P., Wardhaugh, L., Tade, Moses
Format: Journal Article
Published: Elsevier 2016
Online Access:http://hdl.handle.net/20.500.11937/25474
Description
Summary:The energy penalty associated with solvent regeneration accounts for the largest part of overall energy consumption in aqueous ammonia (NH3)-based post-combustion capture (PCC) processes. While extensive research focus on the process improvements to reduce the energy burden of solvent regeneration, little attention has been paid to techno-economic assessments that analyse the related energy savings and capital costs. In the present study, we assessed the technical and economic benefits of stripping modifications in an NH3-based PCC process integrated into a coal-fired power station. The stripping configurations included a rich-split process, cold-rich bypass, inter-heating, and combinations of these processes. We used a rigorous, rate-based model in the Aspen PlusĀ® RateSep simulator to determine the technical performance of these new process modifications, while capital investment was estimated with a cost model based on the Aspen Capital Cost Estimator (AACE). All the proposed stripper modifications have technical and economic advantages compared to the reference case. The best configuration was inter-heating integrated with the rich-split process, which reduced reboiler duty by 40.7% and saved 29.2% of annual costs. The sensitivity study suggests that the modified stripping processes can maintain the economic benefits over the wide variations of the important parameters.