Nehring, M., Topal, E., Knights, P., & Kizil, M. (2012). Integrated short and medium term underground mine production scheduling. South African Institute of Mining and Metallurgy.
Chicago Style (17th ed.) CitationNehring, M., Erkan Topal, P. Knights, and M. Kizil. Integrated Short and Medium Term Underground Mine Production Scheduling. South African Institute of Mining and Metallurgy, 2012.
MLA (9th ed.) CitationNehring, M., et al. Integrated Short and Medium Term Underground Mine Production Scheduling. South African Institute of Mining and Metallurgy, 2012.
Warning: These citations may not always be 100% accurate.