Estimating construction contingency: Accommodating the potential for cost overruns in road construction projects

© 2014 American Society of Civil Engineers. The determination of a project's cost contingency is a pervasive problem as the amount that is incorporated into an estimate is invariably insufficient to accommodate a project's actual cost overrun. The cost overruns experienced in 49 road const...

Full description

Bibliographic Details
Main Authors: Love, Peter, Sing, C., Carey, B., Kim, J.
Format: Journal Article
Published: American Society of Civil Engineers (ASCE) 2015
Online Access:http://hdl.handle.net/20.500.11937/20921
_version_ 1848750444955828224
author Love, Peter
Sing, C.
Carey, B.
Kim, J.
author_facet Love, Peter
Sing, C.
Carey, B.
Kim, J.
author_sort Love, Peter
building Curtin Institutional Repository
collection Online Access
description © 2014 American Society of Civil Engineers. The determination of a project's cost contingency is a pervasive problem as the amount that is incorporated into an estimate is invariably insufficient to accommodate a project's actual cost overrun. The cost overruns experienced in 49 road construction projects procured using traditional lump contracts are analyzed. The theoretical probability distributions are fitted to cost overrun data derived from the sampled projects whose contract values ranged from AU $0.5 and AU $97 million. Goodness of fit tests are used in conjunction with probability-probability (P-P) plots to compare the sample distribution from the known theoretical distribution. A log logistic probability density function (PDF) was found to best describe the behavior of cost overruns. The cumulative distribution function is then used to determine a realistic probability of a cost overrun being experienced from the point at which a contract is awarded. This is required so that public sector clients can determine an appropriate contingency at contract award, which takes into account the nuances that contribute to increasing project costs. The research findings and methodology adopted to determine the best fit probability distribution provides a more robust approach for governing a construction contingency for road construction projects so that they can be procured successfully.
first_indexed 2025-11-14T07:36:56Z
format Journal Article
id curtin-20.500.11937-20921
institution Curtin University Malaysia
institution_category Local University
last_indexed 2025-11-14T07:36:56Z
publishDate 2015
publisher American Society of Civil Engineers (ASCE)
recordtype eprints
repository_type Digital Repository
spelling curtin-20.500.11937-209212017-09-13T13:44:33Z Estimating construction contingency: Accommodating the potential for cost overruns in road construction projects Love, Peter Sing, C. Carey, B. Kim, J. © 2014 American Society of Civil Engineers. The determination of a project's cost contingency is a pervasive problem as the amount that is incorporated into an estimate is invariably insufficient to accommodate a project's actual cost overrun. The cost overruns experienced in 49 road construction projects procured using traditional lump contracts are analyzed. The theoretical probability distributions are fitted to cost overrun data derived from the sampled projects whose contract values ranged from AU $0.5 and AU $97 million. Goodness of fit tests are used in conjunction with probability-probability (P-P) plots to compare the sample distribution from the known theoretical distribution. A log logistic probability density function (PDF) was found to best describe the behavior of cost overruns. The cumulative distribution function is then used to determine a realistic probability of a cost overrun being experienced from the point at which a contract is awarded. This is required so that public sector clients can determine an appropriate contingency at contract award, which takes into account the nuances that contribute to increasing project costs. The research findings and methodology adopted to determine the best fit probability distribution provides a more robust approach for governing a construction contingency for road construction projects so that they can be procured successfully. 2015 Journal Article http://hdl.handle.net/20.500.11937/20921 10.1061/(ASCE)IS.1943-555X.0000221 American Society of Civil Engineers (ASCE) restricted
spellingShingle Love, Peter
Sing, C.
Carey, B.
Kim, J.
Estimating construction contingency: Accommodating the potential for cost overruns in road construction projects
title Estimating construction contingency: Accommodating the potential for cost overruns in road construction projects
title_full Estimating construction contingency: Accommodating the potential for cost overruns in road construction projects
title_fullStr Estimating construction contingency: Accommodating the potential for cost overruns in road construction projects
title_full_unstemmed Estimating construction contingency: Accommodating the potential for cost overruns in road construction projects
title_short Estimating construction contingency: Accommodating the potential for cost overruns in road construction projects
title_sort estimating construction contingency: accommodating the potential for cost overruns in road construction projects
url http://hdl.handle.net/20.500.11937/20921