Alternative work schedule interventions in the Australian construction industry: A comparative case study analysis

Bibliographic Details
Main Authors: Lingard, H., Townsend, K., Bradley, L., Brown, Kerry
Format: Journal Article
Published: Routledge 2008
Online Access:http://www.tandfonline.com/loi/rcme20
http://hdl.handle.net/20.500.11937/19929
_version_ 1848750168411734016
author Lingard, H.
Townsend, K.
Bradley, L.
Brown, Kerry
author_facet Lingard, H.
Townsend, K.
Bradley, L.
Brown, Kerry
author_sort Lingard, H.
building Curtin Institutional Repository
collection Online Access
first_indexed 2025-11-14T07:32:33Z
format Journal Article
id curtin-20.500.11937-19929
institution Curtin University Malaysia
institution_category Local University
last_indexed 2025-11-14T07:32:33Z
publishDate 2008
publisher Routledge
recordtype eprints
repository_type Digital Repository
spelling curtin-20.500.11937-199292018-12-14T00:55:56Z Alternative work schedule interventions in the Australian construction industry: A comparative case study analysis Lingard, H. Townsend, K. Bradley, L. Brown, Kerry 2008 Journal Article http://hdl.handle.net/20.500.11937/19929 http://www.tandfonline.com/loi/rcme20 Routledge restricted
spellingShingle Lingard, H.
Townsend, K.
Bradley, L.
Brown, Kerry
Alternative work schedule interventions in the Australian construction industry: A comparative case study analysis
title Alternative work schedule interventions in the Australian construction industry: A comparative case study analysis
title_full Alternative work schedule interventions in the Australian construction industry: A comparative case study analysis
title_fullStr Alternative work schedule interventions in the Australian construction industry: A comparative case study analysis
title_full_unstemmed Alternative work schedule interventions in the Australian construction industry: A comparative case study analysis
title_short Alternative work schedule interventions in the Australian construction industry: A comparative case study analysis
title_sort alternative work schedule interventions in the australian construction industry: a comparative case study analysis
url http://www.tandfonline.com/loi/rcme20
http://hdl.handle.net/20.500.11937/19929