Mathematical approach for better mine waste rock dumping management
A mine waste rock dump does not have any intrinsic value, yet is an inevitable structure in surface mining operations. Since the purpose of mining is to maximise profit, possible expenditure reduction in hauling waste rock to the dump, which can represent up to 50% of the total operating cost, is hi...
| Main Authors: | Li, Y., Topal, Erkan, Williams, D. |
|---|---|
| Other Authors: | P Knights |
| Format: | Conference Paper |
| Published: |
Australasian Institute of Mining and Metallurgy
2012
|
| Online Access: | http://hdl.handle.net/20.500.11937/18804 |
Similar Items
Mine waste rock management
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
Waste rock dumping optimisation using mixed integer programming (MIP)
by: Li, Yu, et al.
Published: (2013)
by: Li, Yu, et al.
Published: (2013)
Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming
by: Li, Y, et al.
Published: (2014)
by: Li, Y, et al.
Published: (2014)
Optimisation of waste rock placement using mixed integer programming
by: Li, Y., et al.
Published: (2014)
by: Li, Y., et al.
Published: (2014)
A new model for open-pit production and waste-dump scheduling
by: Fu, Z., et al.
Published: (2019)
by: Fu, Z., et al.
Published: (2019)
Optimising the long-term mine waste management and truck schedule in a largescale open pit mine
by: Li, Y., et al.
Published: (2016)
by: Li, Y., et al.
Published: (2016)
Mine Waste Dump Optimisation Based on Carbon Footprint
by: Tobgay, Namgyel Sithup
Published: (2024)
by: Tobgay, Namgyel Sithup
Published: (2024)
New approach for estimating total mining costs in surface coal mines
by: Shafiee, S., et al.
Published: (2012)
by: Shafiee, S., et al.
Published: (2012)
Production Scheduling of an Open-pit Mining Complex with Waste
Dump Constraints
by: Lin, Wei
Published: (2021)
by: Lin, Wei
Published: (2021)
Mining (Australia)
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
A new mathematical programming model for production schedule optimisation in underground mining operations
by: Nehring, M., et al.
Published: (2010)
by: Nehring, M., et al.
Published: (2010)
Developments in Mine Design, Planning and Scheduling in Open Cut Mining
by: Saydam, S., et al.
Published: (2012)
by: Saydam, S., et al.
Published: (2012)
Optimising the long term mine landform progression and truck hour schedule in a large scale open pit mine using mixed integer programming
by: Li, Y., et al.
Published: (2018)
by: Li, Y., et al.
Published: (2018)
A heuristic approach to optimal design of an underground mine stope layout
by: Sandanayake, D., et al.
Published: (2015)
by: Sandanayake, D., et al.
Published: (2015)
Mining truck scheduling with stochastic maintenance cost
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
Revegetation of coal mine dumps to ameliorate effects of acidic seepage.
by: Mikli, Markus H.
Published: (2001)
by: Mikli, Markus H.
Published: (2001)
Implementing a New Heuristic Approach to the Underground Mine Stope Layout Problem
by: Sandanayake, D., et al.
Published: (2014)
by: Sandanayake, D., et al.
Published: (2014)
Characterizations of waste soil of open dumping area
by: Mohd Pauzi, Nur Irfah, et al.
Published: (2014)
by: Mohd Pauzi, Nur Irfah, et al.
Published: (2014)
To ‘dump’ or not to ‘dump’: changing, supporting or distracting behavior
by: Kamaruddin, Azrina, et al.
Published: (2010)
by: Kamaruddin, Azrina, et al.
Published: (2010)
Optimum waste dump planning using Mixed Integer Programming (MIP)
by: Li, Yu
Published: (2014)
by: Li, Yu
Published: (2014)
The construction waste management framework for reducing illegal dumping activities in the construction industry
by: Abd Rahim, Mohd Hilmi Izwan
Published: (2019)
by: Abd Rahim, Mohd Hilmi Izwan
Published: (2019)
A new MIP model for mine equipment scheduling by minimizing maintenance cost
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
Flexible open-pit mine design under uncertainty
by: Groeneveld, Ben, et al.
Published: (2011)
by: Groeneveld, Ben, et al.
Published: (2011)
An Economics Analysis of Dumping and Antidumping
by: Li, Yan
Published: (2012)
by: Li, Yan
Published: (2012)
Using Clustering Methods for Open Pit Mine Production Scheduling
by: Ren, H., et al.
Published: (2014)
by: Ren, H., et al.
Published: (2014)
Application of predictive data mining to create mine plan flexibility in the face of geological uncertainty
by: Ajak, A., et al.
Published: (2017)
by: Ajak, A., et al.
Published: (2017)
Evaluation of a mining project using Discounted Cash Flow analysis, Decision Tree analysis, Monte Carlo Simulation and Real Options using an example
by: Topal, Erkan
Published: (2008)
by: Topal, Erkan
Published: (2008)
Transformation of the Australian mining industry and future prospects
by: Jang, Hyong Doo, et al.
Published: (2020)
by: Jang, Hyong Doo, et al.
Published: (2020)
A review of soft computing technology applications in several mining problems
by: Jang, H., et al.
Published: (2014)
by: Jang, H., et al.
Published: (2014)
Strategic mine planning model using network flow model and real case application
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
Real option in action: An example of flexible decision making at a mine operational level
by: Ajak, A., et al.
Published: (2015)
by: Ajak, A., et al.
Published: (2015)
A new methodology for flexible mine design
by: Groeneveld, B., et al.
Published: (2018)
by: Groeneveld, B., et al.
Published: (2018)
Integrated Optimization of Underground Mine Design and Scheduling
by: Little, J, et al.
Published: (2013)
by: Little, J, et al.
Published: (2013)
Designing an optimal stope layout for underground mining based on a heuristic algorithm
by: Sandanayake, D., et al.
Published: (2015)
by: Sandanayake, D., et al.
Published: (2015)
Illumination of parameter contributions on uneven break phenomenon in underground stoping mines
by: Jang, Hyong Doo, et al.
Published: (2016)
by: Jang, Hyong Doo, et al.
Published: (2016)
Strategies to assist in obtaining an optimal solution for an underground mine planning problem using Mixed Integer Programming
by: Little, J., et al.
Published: (2011)
by: Little, J., et al.
Published: (2011)
Robust versus Flexible Open Pit Mine Design
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
The anti-dumping petition against dumped tinplates: is it time to consider the nation’s welfare?
by: Ahamat, Haniff
Published: (2013)
by: Ahamat, Haniff
Published: (2013)
Geotechnical Properties of Waste Soil from Open Dumping Area in Malaysia.
by: Omar, Husaini, et al.
Published: (2011)
by: Omar, Husaini, et al.
Published: (2011)
Net present value maximisation model for optimum cut-off grade policy of open pit mining operations
by: Asad, M., et al.
Published: (2011)
by: Asad, M., et al.
Published: (2011)
Similar Items
-
Mine waste rock management
by: Topal, Erkan, et al.
Published: (2012) -
Waste rock dumping optimisation using mixed integer programming (MIP)
by: Li, Yu, et al.
Published: (2013) -
Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming
by: Li, Y, et al.
Published: (2014) -
Optimisation of waste rock placement using mixed integer programming
by: Li, Y., et al.
Published: (2014) -
A new model for open-pit production and waste-dump scheduling
by: Fu, Z., et al.
Published: (2019)