Alternative underground ore transport systems for the Jaguar Base Metal deposit

Jabiru Metals completed a feasibility study on the Jaguar Base Metal Project in July 2005. The study was based on conventional truck haulage via a decline. Conveyor haulage was considered but not in sufficient detail to provide a meaningful comparison. The current study investigates the cost and pro...

Full description

Bibliographic Details
Main Authors: Darcey, W., Chanda, E., Kuruppu, Mahinda
Format: Conference Paper
Published: 2011
Online Access:http://hdl.handle.net/20.500.11937/18173
_version_ 1848749669145903104
author Darcey, W.
Chanda, E.
Kuruppu, Mahinda
author_facet Darcey, W.
Chanda, E.
Kuruppu, Mahinda
author_sort Darcey, W.
building Curtin Institutional Repository
collection Online Access
description Jabiru Metals completed a feasibility study on the Jaguar Base Metal Project in July 2005. The study was based on conventional truck haulage via a decline. Conveyor haulage was considered but not in sufficient detail to provide a meaningful comparison. The current study investigates the cost and productivity of alternative ore transport systems for the Jaguar project. The options considered are conventional underground truck, conveyor, road train, rigid frame truck, monorail haulage and shaft hoisting. Shaft hoisting was not considered in detail due to the high capital outlay for such a relatively short mine life of less than six years. This study goes beyond the common approach of evaluating haulage systems in isolation; it includes development costs, timing of ore production and costs associated with mine services as well as administration and milling costs. The results of this study indicate that the best haulage option for the Jaguar project is conventional truck using the Hitachi AH400 trucks. The net present value (NPV) for this option is A$8.13 million higher than the next best option namely the Kiruna E635 electric truck. The conveyor option has the lowest operating cost per tonne of ore but the longer development time negatively impacts on its NPV. The monorail option is considered impractical due to the number and length of trains required to achieve production targets.
first_indexed 2025-11-14T07:24:36Z
format Conference Paper
id curtin-20.500.11937-18173
institution Curtin University Malaysia
institution_category Local University
last_indexed 2025-11-14T07:24:36Z
publishDate 2011
recordtype eprints
repository_type Digital Repository
spelling curtin-20.500.11937-181732017-01-30T12:06:22Z Alternative underground ore transport systems for the Jaguar Base Metal deposit Darcey, W. Chanda, E. Kuruppu, Mahinda Jabiru Metals completed a feasibility study on the Jaguar Base Metal Project in July 2005. The study was based on conventional truck haulage via a decline. Conveyor haulage was considered but not in sufficient detail to provide a meaningful comparison. The current study investigates the cost and productivity of alternative ore transport systems for the Jaguar project. The options considered are conventional underground truck, conveyor, road train, rigid frame truck, monorail haulage and shaft hoisting. Shaft hoisting was not considered in detail due to the high capital outlay for such a relatively short mine life of less than six years. This study goes beyond the common approach of evaluating haulage systems in isolation; it includes development costs, timing of ore production and costs associated with mine services as well as administration and milling costs. The results of this study indicate that the best haulage option for the Jaguar project is conventional truck using the Hitachi AH400 trucks. The net present value (NPV) for this option is A$8.13 million higher than the next best option namely the Kiruna E635 electric truck. The conveyor option has the lowest operating cost per tonne of ore but the longer development time negatively impacts on its NPV. The monorail option is considered impractical due to the number and length of trains required to achieve production targets. 2011 Conference Paper http://hdl.handle.net/20.500.11937/18173 restricted
spellingShingle Darcey, W.
Chanda, E.
Kuruppu, Mahinda
Alternative underground ore transport systems for the Jaguar Base Metal deposit
title Alternative underground ore transport systems for the Jaguar Base Metal deposit
title_full Alternative underground ore transport systems for the Jaguar Base Metal deposit
title_fullStr Alternative underground ore transport systems for the Jaguar Base Metal deposit
title_full_unstemmed Alternative underground ore transport systems for the Jaguar Base Metal deposit
title_short Alternative underground ore transport systems for the Jaguar Base Metal deposit
title_sort alternative underground ore transport systems for the jaguar base metal deposit
url http://hdl.handle.net/20.500.11937/18173