Incorporating embodied energy in the BIM process
| Main Authors: | , , |
|---|---|
| Other Authors: | |
| Format: | Conference Paper |
| Published: |
Imperial College
2012
|
| Online Access: | http://hdl.handle.net/20.500.11937/17881 |
| _version_ | 1848749585732730880 |
|---|---|
| author | Capper, G. Matthews, Jane Lockley, S. |
| author2 | Unknown |
| author_facet | Unknown Capper, G. Matthews, Jane Lockley, S. |
| author_sort | Capper, G. |
| building | Curtin Institutional Repository |
| collection | Online Access |
| first_indexed | 2025-11-14T07:23:17Z |
| format | Conference Paper |
| id | curtin-20.500.11937-17881 |
| institution | Curtin University Malaysia |
| institution_category | Local University |
| last_indexed | 2025-11-14T07:23:17Z |
| publishDate | 2012 |
| publisher | Imperial College |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | curtin-20.500.11937-178812018-12-14T00:49:41Z Incorporating embodied energy in the BIM process Capper, G. Matthews, Jane Lockley, S. Unknown 2012 Conference Paper http://hdl.handle.net/20.500.11937/17881 Imperial College restricted |
| spellingShingle | Capper, G. Matthews, Jane Lockley, S. Incorporating embodied energy in the BIM process |
| title | Incorporating embodied energy in the BIM process |
| title_full | Incorporating embodied energy in the BIM process |
| title_fullStr | Incorporating embodied energy in the BIM process |
| title_full_unstemmed | Incorporating embodied energy in the BIM process |
| title_short | Incorporating embodied energy in the BIM process |
| title_sort | incorporating embodied energy in the bim process |
| url | http://hdl.handle.net/20.500.11937/17881 |