APA (7th ed.) Citation

Nehring, M., Topal, E., & Little, J. (2010). A new mathematical programming model for production schedule optimisation in underground mining operations. The Southern African Institute of Mining and Metallurgy.

Chicago Style (17th ed.) Citation

Nehring, M., Erkan Topal, and J. Little. A New Mathematical Programming Model for Production Schedule Optimisation in Underground Mining Operations. The Southern African Institute of Mining and Metallurgy, 2010.

MLA (9th ed.) Citation

Nehring, M., et al. A New Mathematical Programming Model for Production Schedule Optimisation in Underground Mining Operations. The Southern African Institute of Mining and Metallurgy, 2010.

Warning: These citations may not always be 100% accurate.