Net present value maximisation model for optimum cut-off grade policy of open pit mining operations
The optimum cut-off grade policy maximizes the net present value (NPV) of an open pit mining operation subject to the mining, processing, and refining capacity constraints. The traditional approaches to cut-off grade determination ignore the escalation of the economic parameters such as metal price...
| Main Authors: | Asad, M., Topal, Erkan |
|---|---|
| Format: | Journal Article |
| Published: |
South African Institute of Mining and Metallurgy
2011
|
| Online Access: | https://www.saimm.co.za/Journal/v111n11p741.pdf http://hdl.handle.net/20.500.11937/13927 |
Similar Items
A review of cut-off grade policy models for open pit mining operations
by: Asad, Mohammad, et al.
Published: (2016)
by: Asad, Mohammad, et al.
Published: (2016)
A method for optimal cut-off grade policy in open pit mining operations under uncertain supply
by: Khan, A., et al.
Published: (2019)
by: Khan, A., et al.
Published: (2019)
A mathematical programming model for optimal cut-off grade policy in open pit mining operations with multiple processing streams
by: Khan, A., et al.
Published: (2018)
by: Khan, A., et al.
Published: (2018)
Determination of the transition Point from Open Pit to Underground Mining
by: Chung, J., et al.
Published: (2016)
by: Chung, J., et al.
Published: (2016)
Optimum design of open pit mines
by: Giannini, Luciano Mario
Published: (1990)
by: Giannini, Luciano Mario
Published: (1990)
Flexible open-pit mine design under uncertainty
by: Groeneveld, Ben, et al.
Published: (2011)
by: Groeneveld, Ben, et al.
Published: (2011)
Using Clustering Methods for Open Pit Mine Production Scheduling
by: Ren, H., et al.
Published: (2014)
by: Ren, H., et al.
Published: (2014)
Robust versus Flexible Open Pit Mine Design
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
An Implementation of Ant Colony and Genetic Algorithm based Hybrid-Metaheuristic for Cut-off Grade Optimization in Open-Pit Mining Operations
by: Qureshi, Muhammad Asim
Published: (2017)
by: Qureshi, Muhammad Asim
Published: (2017)
Developments in Mine Design, Planning and Scheduling in Open Cut Mining
by: Saydam, S., et al.
Published: (2012)
by: Saydam, S., et al.
Published: (2012)
Optimising the long-term mine waste management and truck schedule in a largescale open pit mine
by: Li, Y., et al.
Published: (2016)
by: Li, Y., et al.
Published: (2016)
Transition from open-pit to underground – using Integer Programming considering grade uncertainty
by: Chung, Joyce Sze Yee, et al.
Published: (2015)
by: Chung, Joyce Sze Yee, et al.
Published: (2015)
A new model for open-pit production and waste-dump scheduling
by: Fu, Z., et al.
Published: (2019)
by: Fu, Z., et al.
Published: (2019)
A new generic open pit mine planning process with risk assessment ability
by: Mai, N., et al.
Published: (2016)
by: Mai, N., et al.
Published: (2016)
A new open-pit mine planning optimization method using block aggregation and integer programming
by: Mai, N., et al.
Published: (2018)
by: Mai, N., et al.
Published: (2018)
A heuristic approach to stochastic cutoff grade optimization for open pit mining complexes with multiple processing streams
by: Asad, Mohammad Waqar, et al.
Published: (2013)
by: Asad, Mohammad Waqar, et al.
Published: (2013)
Long-term Open-pit Mine Production Scheduling with Grade Engineering
by: Fathollahzadeh, Karo
Published: (2022)
by: Fathollahzadeh, Karo
Published: (2022)
Cut-off Grades and Optimising the Strategic Mine Plan
by: Hall, Brian
Published: (2014)
by: Hall, Brian
Published: (2014)
Optimising the long term mine landform progression and truck hour schedule in a large scale open pit mine using mixed integer programming
by: Li, Y., et al.
Published: (2018)
by: Li, Y., et al.
Published: (2018)
Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming
by: Li, Y, et al.
Published: (2014)
by: Li, Y, et al.
Published: (2014)
A Probabilistic Model to Improve Reconciliation of Estimated and Actual Grade in Open Pit Mining
by: Parhizkar, A., et al.
Published: (2012)
by: Parhizkar, A., et al.
Published: (2012)
Stochastic production phase design for an open pit mining complex with multiple processing streams
by: Asad, Mohammad Waqar, et al.
Published: (2014)
by: Asad, Mohammad Waqar, et al.
Published: (2014)
Optimal production scale of open pit mining operations with uncertain metal supply and long-term stockpiles
by: Asad, Mohammad Waqar, et al.
Published: (2012)
by: Asad, Mohammad Waqar, et al.
Published: (2012)
Performance evaluation of a new stochastic network flow approach to optimal open pit mine design - application at a gold mine
by: Asad, Mohammad Waqar, et al.
Published: (2012)
by: Asad, Mohammad Waqar, et al.
Published: (2012)
The Thin Coal Seam (TCS) Mining Technology for Open Pit Mines in China
by: Liu, P., et al.
Published: (2018)
by: Liu, P., et al.
Published: (2018)
Implementing a parametric maximum flow algorithm for optimal open pit mine design under uncertain supply and demand
by: Asad, Mohammad Waqar, et al.
Published: (2013)
by: Asad, Mohammad Waqar, et al.
Published: (2013)
Production Scheduling of an Open-pit Mining Complex with Waste
Dump Constraints
by: Lin, Wei
Published: (2021)
by: Lin, Wei
Published: (2021)
Optimal System Design for Instrumented Slope Monitoring in Open Pit Mines
by: Narendranathan, S., et al.
Published: (2011)
by: Narendranathan, S., et al.
Published: (2011)
Optimisation of road position in open pit mining using location theory
by: parhizkar, A., et al.
Published: (2008)
by: parhizkar, A., et al.
Published: (2008)
Selection criteria for loading and hauling equipment - open pit mining applications
by: Hardy, Raymond J
Published: (2007)
by: Hardy, Raymond J
Published: (2007)
An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
Where to Make the Transition from Open-pit to Underground?: Using Integer Programming
by: Chung, J., et al.
Published: (2016)
by: Chung, J., et al.
Published: (2016)
Designing an optimal stope layout for underground mining based on a heuristic algorithm
by: Sandanayake, D., et al.
Published: (2015)
by: Sandanayake, D., et al.
Published: (2015)
New approach for estimating total mining costs in surface coal mines
by: Shafiee, S., et al.
Published: (2012)
by: Shafiee, S., et al.
Published: (2012)
A Mixed Integer Programming Approach
for Transitioning from Open-pit to
Underground Mining
by: Chung, Joyce Sze Yee
Published: (2020)
by: Chung, Joyce Sze Yee
Published: (2020)
Slope Stability Monitoring Methods and Technologies for Open-Pit Mining: A Systematic Review
by: Le Roux, Rohan, et al.
Published: (2025)
by: Le Roux, Rohan, et al.
Published: (2025)
A heuristic approach to optimal design of an underground mine stope layout
by: Sandanayake, D., et al.
Published: (2015)
by: Sandanayake, D., et al.
Published: (2015)
Implementing a New Heuristic Approach to the Underground Mine Stope Layout Problem
by: Sandanayake, D., et al.
Published: (2014)
by: Sandanayake, D., et al.
Published: (2014)
Mining (Australia)
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
Off Cuts
by: Kovacsy, Benjamin
Published: (2011)
by: Kovacsy, Benjamin
Published: (2011)
Similar Items
-
A review of cut-off grade policy models for open pit mining operations
by: Asad, Mohammad, et al.
Published: (2016) -
A method for optimal cut-off grade policy in open pit mining operations under uncertain supply
by: Khan, A., et al.
Published: (2019) -
A mathematical programming model for optimal cut-off grade policy in open pit mining operations with multiple processing streams
by: Khan, A., et al.
Published: (2018) -
Determination of the transition Point from Open Pit to Underground Mining
by: Chung, J., et al.
Published: (2016) -
Optimum design of open pit mines
by: Giannini, Luciano Mario
Published: (1990)